Chatham Main Line

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Template:EngvarB Template:Use dmy dates Template:Infobox rail line Template:More footnotes needed Template:Chatham Main Line The Chatham Main Line is a railway line in England that links London Victoria[1] and Dover Priory / Ramsgate, travelling via Medway (of which the town of Chatham is part, hence the name).

Services to Cannon Street follow the route as far as St Mary Cray Junction where they diverge onto the South Eastern Main Line near Chislehurst.

Thameslink services to Luton run in parallel from Rainham to Rochester, diverging once across the River Medway at Rochester Bridge Junction onto the North Kent Line via Gravesend and Dartford.

A shuttle service operates on the Sheerness Line which starts at Sittingbourne.

Services

Most services on the Line are run by SE Trains and Southern. Govia Thameslink Railway run some Thameslink services, the first starting from Template:Rws and travelling via Template:Rws on the Catford Loop, joining at Shortlands Junction, travelling to Template:Rws before heading to Template:Rws. The second service starts from Template:Rws and also travels via the Catford Loop to Shortlands Junction, travelling to Template:Rws before heading off to Template:Rws. The final service starts at Template:Rws and goes via Template:Rws, Template:Rws, Template:Rws and Template:Rws to Template:Rws before terminating at Rainham in the bay platform 0.

While travelling between Bromley South and London Victoria, the trains can either travel on the main line, through Beckenham Junction, Herne Hill and Brixton, or via the Catford Loop Line, coming away from the main line at Shortlands Junction, travelling through Template:Rws and Template:Rws, and then just past Template:Rws it either picks up the Southeastern line all the way, or can follow the Southern (Atlantic) Line through Template:Rws before crossing back over to the Southeastern Line to London Victoria. The hourly stopping service is now scheduled to run via Template:Rws, additionally stopping at Template:Rws.

The off-peak timetable consists of two trains per hour from Victoria, calling at Template:Rws, Template:Rws, Template:Rws, Template:Rws, Template:Rws, Gillingham and Rainham. One service will call at Template:Rws, Template:Rws, Template:Rws and Template:Rws, then all stations to Template:Rws via Template:Rws. The other service will just call at Template:Rws and Template:Rws, then all stations to Template:Rws and Template:Rws. These trains no longer split up at Template:Rws. There is an hourly service from Victoria calling at Template:Rws via the Catford Loop, Template:Rws, Template:Rws then all stations to Gillingham. A High Speed Service sees two trains per hour from Template:Rws to Template:Rws via Template:Rws and Template:Rws. One service terminates at Template:Rws before travelling back to Template:Rws via Template:Rws and Template:Rws. The other service continues coastbound as a semi-fast service calling at Template:Rws, Template:Rws, Template:Rws, Template:Rws, Template:Rws and Template:Rws. It then carries on, stopping at Template:Rws, Template:Rws, Template:Rws, Template:Rws, Template:Rws, Template:Rws, Template:Rws and Template:Rws, before picking up the High Speed Line to Template:Rws, Template:Rws and arriving back at Template:Rws. A service operates in the opposite direction. There is one other High Speed Service that runs on a small part of the line, starting from Template:Rws and calling at Template:Rws and Template:Rws before heading to Template:Rws, and Template:Rws, then picking up the High Speed Line and calling at the remaining stations to Template:Rws. A Thameslink service now starts from Rainham and calls at nearly all stations via Template:Rws, Template:Rws, Template:Rws, Template:Rws (for Elizabeth line services), Template:Rws and Template:Rws (both for the Docklands Light Railway), Template:Rws, Template:Rws and beyond. Passengers for Template:Rws, Template:Rws or Template:Rws now have to change at Template:Rws.

Rolling stock

The following trains are operated on the line : Class 465 "Networker" since 1992, Class 466 "Networker" since 1993, Class 375 "Electrostar" since 2001, Class 395 "Javelin" since 2009, and 8-car Class 700 "Desiro City" since 2018.

History

The line was built by the London, Chatham and Dover Railway, who were in competition with the South Eastern Railway (hence the duplication of stations in Kent). They subsequently built lines to Sevenoaks and Ashford (via Maidstone) from the Chatham Main Line.

The line was electrified (750 V DC third rail) in a series of stages. Initially the new Southern Railway electrified the urban (within London) workings of the SECR in the 1920s. In July 1925 "South Eastern Electrification (Stage 1)" saw the line from Victoria to junction with the South Eastern Main Line at Bickley, including the Catford Loop Line electrified.[2] This was extended to outer suburban workings to Sevenoaks via Swanley (Bickley junction to Swanley) in two stages, reaching St Mary Cray in May 1934[2] and Swanley in January 1935.[2] Full outer suburban electrification was achieved with the "Maidstone & Gillingham Electrification" scheme in July 1939, extending electrification from Swanley to Gillingham.[2] Post war, under the BR's 1955 Modernisation plan, electrification was completed (Gillingham to Ramsgate and Dover) under "Kent Coast Electrification" stage 1 in 1959.[2] At the same time the four track section between Shortlands and St Mary Cray junction was extended to Swanley Junction with a complete rebuilding of the St Mary Cray Junction. Two passing loops were added (to create a four-track section) between Rainham and Newington.

A short branch was built during World War One to service the construction of RAF Manston with a junction off the up line at Birchington on Sea.

Eurostar

Heading away from Victoria, between Farningham Road and Longfield Stations, the line which was originally used by Eurostar trains travelling from Waterloo International towards Fawkham Junction to access High Speed 1 still exists, but is currently not in use.

At one time this line was reserved for emergency use only by Class 395 Javelins travelling to/from Ashford International but, as the route knowledge has not been updated, no trains run on this line any more.

The Eurostar trains can no longer use this line as the Class 373 "Eurostar e300" trains had their 750V DC third rail shoes removed in 2007, whilst the new Class 374 "Eurostar e320" trains are both not fitted with third rail equipment and built to the Continental European loading gauge, which is larger than Great Britain's.

East Kent re-signalling project

The idea of this project is for control of East Kent from Longfield to Ramsgate and just short of Dover Priory to be under the control of the East Kent Signalling Centre (EKSC) based at Gillingham.

Phase 1 of the project was carried out over the Christmas and New Year period of 2011, which involved the complete re-signalling from just east of Sittingbourne to Faversham, then on to Minster Junction and Buckland Junction, just short of Dover Priory. The old signal boxes were then abolished at Faversham, Margate, Ramsgate, Canterbury East and Shepherdswell. Phase 2 involved the re-signalling of the line between Sittingbourne to Longfield and Strood, including the Sheerness Branch Line and the Medway Valley Line to operate from the East Kent Signalling Centre at Gillingham, which is now operational. This means that the Signal Boxes at Rainham and Rochester have now closed, although Sittingbourne remains open as a relay signal box for the Sheerness Branch Line, controlled from Gillingham.

On 13 December 2015, a new £26M Rochester station on Corporation Street opened 500 m west of the original station which it replaced. This station has three platforms and can accommodate 12-car trains instead of the 10-cars maximum length at the original station. Some 12-car peak-time trains are additionally stopping here. At the time, only platforms 1 and 2 were operational. From Easter 2016, Platform 3 was only a Bay Platform with a maximum length of eight cars, but since 10 October 2016, Platform 3 became a through platform with services either able to head towards the Kent Coast or terminating here before head back up towards London. At the East End of the platform, a third line now runs all the way up to the old Rochester Station passing through what was Platform 4 before rejoining the Down Main towards Chatham. This can also enable long freight trains to be held here, allowing passenger services to pass, therefore removing a potential bottleneck.

Rainham has a new bay platform off the up-line, which can accommodate a 12-car train, labelled Platform 0. It was being used temporarily as a Terminus for a couple of evening rush hour trains, but since the introduction of the new Thameslink Metro timetable in 2018, this is now the terminus for services to Luton via Gravesend, Dartford, Woolwich Arsenal and Greenwich, stopping at all but a few stations to London Bridge.

Strood has also been lengthened to accommodate 12-car trains.

Accidents and incidents

  • On 10 September 1963, a freight train became divided and was derailed between Template:Rws and Template:Rws due to defects in a wagon. The line was closed until 13 September.[3]

See also

References

Template:Reflist

External links

Template:Sister project

Script error: No such module "Navbox". Script error: No such module "Navbox".

  1. Quail Map 5 – England South [pages 2–13] Sept 2002 (Retrieved 14 December 2011)
  2. a b c d e Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".