Gravesend railway station

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short descriptionTemplate:Use dmy dates Template:Use British English Script error: No such module "Coordinates". Script error: No such module "Infobox".Template:Template otherScript error: No such module "Parameter validation".Script error: No such module "Check for unknown parameters".Script error: No such module "check for deprecated parameters". Gravesend railway station serves the town of Gravesend in north Kent, England. It is Script error: No such module "convert". down the line from Template:Stn.

Train services are operated by Southeastern and Thameslink. During Christmas 2013, a major overhaul of the lines and platforms changed the four track, two platform layout into two through lines and a western facing bay platform.

History

File:Gravesend Central station geograph-2647617-by-Ben-Brooksbank.jpg
Auto-train at Gravesend Railway Station in 1959

The first railway line to arrive in Gravesend was the Gravesend & Rochester Railway (G&RR) who had purchased the Thames and Medway Canal and its tunnel between Strood and Higham. The G&RR ran the first train to the then terminus at Gravesend (adjacent to the Canal Basin) on 10 February 1845. On 30 July 1849 the line was extended to North Kent East Junction on the South Eastern Railway (SER) and thence to London Bridge.

There was a second Gravesend station (later known as Gravesend West Street then later still Gravesend West) opened by SER's rivals, London, Chatham & Dover Railway (LCDR). It was the end of a branch off the LCDR's main line and it allowed access to Victoria. Journey times were uncompetitive and, when the two companies combined in 1899, the branch was soon relegated to a secondary line and closed in 1968. To differentiate from this other station, Gravesend was named Gravesend Central for a long time.

High speed HS1 services to London St Pancras International were introduced in December 2009 and proved highly successful, having cut London-bound journey times to 23 minutes. The station is now seen as a major interchange for metro and high speed services. There is far greater customer patronage for high speed services to St Pancras from Gravesend in comparison to nearby Ebbsfleet International, where usage is considered modest at best. This might be due (in part) to the sizeable London-bound commuter population in and around Gravesham, as opposed to domestic passenger use at Ebbsfleet, from elsewhere in North West Kent. Additionally services between Maidstone West and London St Pancras have since been added to SouthEastern's High Speed route, which stop at Strood and Gravesend prior to joining the high speed lines at Ebbsfleet.

In 2013 a £19 million overhaul of the station, platforms and lines involved the demolition of a former water tank base on the southern platform of the station (Platform 1 at this time), the installation of a new lift/stair bridge complex towards the western end of the station, the removal of the early 20th century footbridge that spanned the lines close to the ticket halls and a major remodelling of the lines and platforms.[1]

The station's track layout was substantially altered in December 2013. This was primarily for extending the current platforms to accommodate 12 coach trains as opposed to the previous 10 coach limit. Platform 1 has been extended and converted to a London facing bay platform and renumbered as Platform 0. A new single face central Platform 1 is located on the site of what was the former up 'through' road. Services from Medway and Faversham, including London bound high speed trains, use this platform. This new platform has bidirectional workings and capability. Platform 2 remained numbered as '2'; however, it lost its turnback capability and thus caters solely for coast bound services. Services terminating at Gravesend from London Charing Cross or London Cannon Street stations terminate on Platform 0.

The previous historic but narrow central footbridge has been replaced with a large sheltered bridge with lifts, at the London end of the station and serving all three platforms. This new bridge is at the far western end of the platforms; the previous bridge was conveniently near the centre of the platforms and near to the entry/exit.

Services

Services at Gravesend are operated by Southeastern and Thameslink using Template:Brc, Template:Brc, Template:Brc, Template:Brc, Template:Brc and Template:Brc EMUs.

The typical off-peak service in trains per hour is:[2]

Additional services, including trains to and from London Cannon Street, and two daily return services between London St Pancras International and Maidstone West call at the station during the peak hours.[3]

Preceding station National Rail National Rail Following station
Southeastern
SoutheasternTerminus
Thameslink
Disused railways
Terminus style="background:#Template:BR(S) colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   British Rail
Southern Region

Template:Smalldiv
style="background:#Template:BR(S) colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   Uralite Halt
Northfleet style="background:#Template:BR(S) colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   British Rail
Southern Region

Template:Smalldiv
style="background:#Template:BR(S) colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   Denton Halt
style="background:#Template:BR(S) colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   British Rail Southern Region
Template:Smalldiv
style="background:#Template:BR(S) colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   Milton Range Halt
style="background:#Template:BR(S) colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   British Rail Southern Region
Template:Smalldiv
style="background:#Template:BR(S) colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   Hoo Junction Staff Halt

Script error: No such module "Check for unknown parameters".

References

<templatestyles src="Reflist/styles.css" />

  1. Script error: No such module "citation/CS1".
  2. Template:NRtimes
  3. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

Template:Sister project

Template:Kent railway stations Template:TSGN and SE Stations