South Eastern Main Line

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Template:Use dmy dates Template:Infobox rail line Template:South Eastern Main Line The South Eastern Main Line is a major long-distance railway route in South East England, UK, one of the three main routes crossing the county of Kent, going via Sevenoaks, Tonbridge, Ashford and Folkestone to Dover. The other routes are the Chatham Main Line which runs along the north Kent coast to Ramsgate or Dover via Chatham and High Speed 1 which runs through the centre of Kent to the coast at Folkestone where it joins the Channel Tunnel.

History

Construction

Script error: No such module "Labelled list hatnote".

File:S england railways 1840.jpg
Railways in the south east that were built, authorised or under construction by 1840

The line was built by the South Eastern Railway (SER), which was in competition with the London, Chatham and Dover Railway (LCDR), hence the duplication of routes in Kent.

The original main line was given sanction by act of Parliament, the South Eastern Railway Act 1836 (6 & 7 Will. 4. c. lxxv). The route first authorised was from Template:Rws via Oxted, Tunbridge,Template:Efn Maidstone, Ashford and Folkestone.Template:Sfn The route was to make use of the existing London and Croydon Railway and London and Greenwich Railway companies' tracks.Template:Sfn The SER did not have much spare capital. As a cost-cutting measure, authorisation was secured in 1837 to make the junction with the London and Croydon Railway at Norwood, Surrey.Template:Efn instead of at Corbett's Lane.Template:Sfn However, the London and Brighton Railway was authorised to build from Norwood southwards in 1847. Parliament suggested that further savings could be made by avoiding having lines running in parallel valleys for Template:Convert if the SER were to make its junction further south. The London and Brighton were to construct the line, and the SER were to purchase it at cost on completion. Both companies would operate trains over the route. The London and Brighton took advantage of this to ensure that gradients would be kept as shallow as possible, even at the expense of substantial earthworks and a mile-long tunnel at Merstham. The SER main line diverged from the London and Brighton's line at Reigate Junction, which the London and Brighton opened to traffic on 12 July 1841.Template:Sfn

File:Foord Viaduct Kent.jpg
The viaduct over the Foord Gap

Leaving the Brighton line, the railway took a direct route to Folkestone; plans to serve Maidstone were abandoned.Template:Sfn A branch line was to be built from Maidstone Road instead.Template:Sfn The line was almost direct between Redhill and Ashford, not deviating by more than Template:Convert in either direction.Template:Sfn The engineer was Sir William Cubitt. To facilitate fast running, Template:Rws, Maidstone Road and Ashford stations were built with through roads.Template:Sfn Template:Rws station was to be rebuilt on a similar plan in 1924.Template:Sfn Construction began in November 1837 from Reigate Junction eastwards, and in both directions from Tunbridge. The line from London Bridge to Tunbridge opened on 26 May 1842. The line between Tonbridge and Ashford opened on 1 December 1842.[1]

East Kent

No major engineering works were needed until Folkestone was reached, where a Template:Convert high viaduct was needed to cross the Foord Gap.Template:Sfn A temporary station was provided at Folkestone, which opened on 28 June 1843. With the completion of the viaduct, Folkestone station opened on 18 December 1843.[1] East of Folkestone, a hard gault ridge was bored through by the Martello Tunnel, which took its name from a nearby Martello Tower.Template:Sfn Between Folkestone and Dover, there were three headlands, Abbott's Cliff, Round Down Cliff and Shakespeare's Cliff. The first and last were of sound chalk, but Round Down Cliff's chalk was of a different character, and was found to be unstable. Cubitt sought the advice of Lieutenant Hutchinson, Royal Engineers, who had experience in using dynamite in the clearing of the wreck of Template:HMS in 1840.Template:Sfn It was decided to blow the cliff away over a distance of Template:Convert.Template:Sfn On 18 January 1843, a total of Template:Convert of gunpowder was used in three charges to blow away the cliff face. An estimated 1,000,000 tons of chalk was dislodged.[2] As the chalk in Shakespeare's Cliff was not as strong as that of Abbot's Cliff, two single line tunnels were bored.Template:Sfn East of Shakespeare Tunnel, a low trestle bridge was built across the beach to gain access to Dover.Template:Sfn The line between Folkestone and Dover opened on 7 February 1844.[1]

In 1843, permission was obtained to build the branch line from Paddock Wood to Maidstone. It opened on 25 September 1844.[3] In May 1844, permission was gained to build a railway from Ashford to the Isle of Thanet, serving both Margate and Ramsgate. The line opened as far as Canterbury on 6 February 1846.[4] In 1845, permission was obtained to build a branch line to Tunbridge Wells.[5] This line opened on 19 September 1845,Template:Sfn and was extended to Template:Rws, East Sussex in 1852.Template:Sfn Also in that year, permission was obtained to build a railway from Ashford to Hastings, which opened on 13 February 1851.[6] Tunbridge station was renamed Tunbridge Junction on 1 February 1852.[7]

Both Dover and Folkestone provided access to the English Channel, and thus to the French ports of Calais and Boulogne.Template:Sfn At Folkestone, the Pent Brook stream that ran through the Foord Gap had built up a spit of shingle, which acted as a breakwater and provided an anchorage.Template:Sfn The SER built a steeply-graded branch line to the harbour, with a reversal required to reach it. It opened to freight in 1843.Template:Sfn Passengers were transferred from Folkestone station to the harbour by bus, with mail and freight going by rail. A swing bridge was constructed in 1847, and Template:Rws station opened in 1850. Ships could berth at any state of the tide.Template:Sfn The SER started a cross-channel steamship service to Boulogne. At Dover, the River Dour had formed a shingle spit and thus a small harbour which required constant dredging to keep open. Cross-Channel traffic was operated by Admiralty ships to Calais.Script error: No such module "Unsubst". Neither French port was connected by railway at the time. The SER partly financed the construction of the Boulogne & Amiens Railway, which opened in 1848. Calais was reached by rail in that year.Template:Sfn Larger and larger ships were built for the cross-Channel service; these could use Folkestone Harbour only at high tide in the 1860s whilst the pier was extended. Trains connecting with cross-Channel ships thus ran according to the state of the tide, not to a fixed timetable. This was a factor in a serious accident at Staplehurst on 9 June 1865.Template:SfnTemplate:Sfn

The development of Dover Harbour was largely out of SER's hands. The harbour itself was under the control of the Harbour Commissioners, who were deputies of the Lord Warden of the Cinque Ports. Other land that might be developed was in the hands of the Admiralty. Dover Corporation had no influence over either body. They were forced to watch the development of Folkestone as a port whilst little was done to improve things in what was the premier of the Cinque Ports. As far back as the reign of Elizabeth I, there had been plans to build a breakwater at Dover. In 1836, a parliamentary inquiry was set up, and eventually construction of a breakwater was begun in 1847. The Admiralty Pier was to be wide enough for two railway lines to be accommodated.Template:Sfn In use by 1864, the pier was completed in 1871.Template:Sfn Another problem was a lack of decent hotel accommodation in Dover. The Harbour Commissioners had sold the SER a parcel of land on which the station was built. The SER wanted to build the hotel at a position where it would serve both cross-channel and local traffic. They approached the Harbour Commissioners for permission to buy the desired site, but were refused on the grounds that they had not built on land they had previously purchased. Thus the Lord Warden Hotel was built, opening in 1851.Template:Sfn Through the 1850s, Folkestone saw more traffic than Dover, although the latter port was growing at a faster rate.Template:SfnTemplate:Sfn

Further connections

In 1857, a new direct connection was put in at Tunbridge Junction, enabling trains to reach Hastings without reversing. The station at Tonbridge was rebuilt on a new site just west of the original.[7] The LCDR built their line to Dover, which opened in 1861,Template:Sfn providing a route to London that was Template:Convert shorter that the SER line via Template:Rws.Template:Sfn In May 1862, authorisation was obtained to construct a new railway from Template:Rws, London to Tonbridge, which reduced the distance from London to Tonbridge and points east by about Template:Convert. Construction of the tunnels was well supervised by the SER, for it had been discovered by then that the contractors who had built the tunnels on the Hastings line had skimped on the construction by using an insufficient number of rings of bricks to line the tunnels. Rectification resulted in a restricted loading gauge on that line,Template:Sfn a situation that was to last until 1986.Template:Sfn This "cut-off" line, Template:Convert in length, reached Template:Rws on 1 July 1865. This station was replaced with a new one Template:Convert further south, which opened on 2 March 1868 when the line was extended to Template:Rws and Template:Rws.[8][9] The line between Sevenoaks and Tonbridge opened to freight in February 1868, and to passengers on 1 May 1868.[7] Sevenoaks Tunnel took five years to build, from 1863 to 1868, It is Template:Convert long. On opening, it was the fifth longest railway tunnel in the United Kingdom.[10] This new line meant that the old main line from Redhill was relegated to branch line status.[7]

In 1872, construction began on a branch line from Template:Rws to Template:Rws, near Folkestone. Proposals to extend this, or to build a line from Shorncliffe which would have passed under the Foord Gap Viaduct, to Folkestone Harbour, were defeated by local opposition.Template:Sfn Much of the land required was owned by the Earl of Radnor, who was opposed to the schemes.Template:Sfn In 1881, powers were obtained to build the Elham Valley Railway. It opened between Canterbury and Shorncliffe in 1889, stopping the LCDR from building its rival scheme, to which there was much opposition amongst the residents of Folkestone.Template:Sfn The line opened in 1889.Template:Sfn On the main line, two stations were built west of Folkestone: Template:Rws and Template:Rws, which replaced the earlier Template:Rws station. Cheriton Arch opened on 1 September 1884.Template:Sfn[11][12] The new Shorncliffe Camp opened a month later, on 1 October.[12]

The LCDR reached Ashford in 1884 from Template:Rws via Template:Stnlnk.Template:Sfn They built their own station, Template:Rws. It was not until 1 November 1891 that a connection was made between the two lines.Template:Sfn On 1 October 1892, the Cranbrook and Paddock Wood Railway opened their branch from Paddock Wood to Template:Rws. It was extended to Template:Rws on 4 September 1893.Template:Sfn In 1905, the Kent and East Sussex Railway extended their line from Template:Rws to Headcorn. A junction was built just east of the station.Template:Sfn In 1910, work began on the construction of Template:Rws station, groundwork for which was to take three years to complete.Template:Sfn The station opened on 2 January 1915 for ambulance trains.Template:Sfn

Operation

From the outset, the line was worked by steam locomotives. Early locomotive classes that worked the line include the "Little Mail", and "Mail" class 2-2-2s.Template:Sfn By the 1860s the speed limit on the line was Template:Convert. In those days, shingle was used for ballast. This was fine for the speeds and train weights then in use, but became less satisfactory as train speeds and weights increased. The use of shingle ballast was a factor in a serious accident at Sevenoaks in 1927.Template:Sfn In the 1870s, James Stirling introduced a number of new classes: the B and F class 4-4-0s for express passenger work; the O class 0-6-0s for freight; and the A class 4-4-0s and Q class 0-4-4Ts for local passenger work. The R class 0-6-0Ts were built to perform banking duties on the branch from Folkestone Harbour to Folkestone Junction. Classes F, O and Q accounted for the majority of the 459 locomotives in the six classes.Template:Sfn The SER and LCDR agreed in 1898 to form a working arrangement.Template:Sfn The South Eastern and Chatham Railway (SECR) came into being on 1 January 1899.Template:Sfn The new company was short of locomotives and was glad to acquire five 4-4-0s that the Great North of Scotland Railway had ordered from Hurst, Nelson & Co Ltd, Glasgow but which subsequently had become surplus to their requirements. These locomotives became the G class.Template:Sfn In 1900, Harry Wainwright introduced the C class 0-6-0s for freight, and D and E class 4-4-0s for express passenger work. The latter two classes were capable of Template:Convert.Template:Sfn The track having been upgraded to enable running at such speed.Template:Sfn Richard Maunsell introduced the River class 2-6-4Ts in 1917 for express passenger trains.Template:Sfn Post-war, the D and E classes were rebuilt with superheaters. The rebuilt locomotives were designated as classes D1 and E1.Template:Sfn

With the introduction of electric trains in the late 1920s, a large number of three-car electric multiple units and two-car trailer sets were built. Some were built new by the Metropolitan Carriage, Wagon and Finance Company with trailers by the Birmingham Railway Carriage and Wagon Company, but the majority were converted from ex-SECR, London, Brighton and South Coast Railway (LB&SCR) or London and South Western Railway (LSWR) carriages. The former LB&SCR 6.7kV AC electric multiple units were also converted.Template:Sfn After World War II, many of the three-coach units were reformed as four-car units by the addition of an ex-LSWR 10-compartment carriage. Some units gained a brand new carriage. Other units were formed from various carriages that were part of units that had been damaged by accidents or enemy action. From 1946 to 1950, a number of units were built at Eastleigh Works.Template:Sfn The units collectively were designated 4SUB.

Electrification

In 1903, the SECR obtained powers to electrify their lines. At a meeting in 1913, SECR chairman H. Cosmo Bonsor said that the time was not right for the company to incur the heavy expenditure of electrification. The outbreak of war meant the postponement of any plans to electrify suburban lines. With the passing of the Trades Facilities Act 1922, the SECR proposed to electrify a number of lines in three stages. The SEML was to be partly electrified as follows: Charing Cross and Template:Rws to Orpington as part of Stage 1; Orpington to Tonbridge as part of Stage 2, which also included the electrification of the former SEML between Redhill and Tonbridge. Both stages only covered the working of local passenger trains on the lines that were electrified. Stage 3 was to extend the working to through passenger trains and freight. Permission was sought in 1922 to build an electricity generating station at Charlton, London. This was refused by the Electricity Commissioners, who insisted that the company bought electricity from an existing supply company. Objections to this by the SECRwere not entertained.

On 1 January 1923, the SECR became part of the Southern Railway (SR).Template:Sfn

File:Southern railway electric units at Orpington (CJ Allen, Steel Highway, 1928).jpg
Electric multiple units at Orpington, 1928. Two 3-car units sandwich a 2-car trailer set.

The SR decided that the electrification system was to be 660 V DC third rail.Template:Sfn The first station on the SEML to see electric trains was Orpington, which was the terminus for electric trains from Victoria via Template:Rws and Template:Rws. Public services commenced on 12 July 1925.Template:Sfn In preparation for Stage 2 of the electrification, the lines between Charing Cross and Metropolitan Junction were remodelled. Semaphore signals were replaced by colour light signals, with a new temporary manual signal box provided at Charing Cross. The lines serving Cannon Street were electrified. Electric trains were due to start on 1 December 1925, but power supply problems meant that the introduction of electric trains from Charing Cross and Cannon Street to Orpington was postponed until 28 February 1926.Template:Sfn Cannon Street was closed from 5–28 June 1926 for alterations to the track layout and platforms. On 27 June, new four aspect colour light signals were brought into use between Cannon Street, Charing Cross and Borough Market Junction. New power signal boxes came into service at the two termini, but Metropolitan Junction remained a manually-worked box, although it was provided with a new 60-lever frame.Template:Sfn With the introduction of the new service on 28 June, a new station was opened at Template:Rws.Template:Sfn On 30 June 1929, four-aspect colour light signals were introduced between Template:Rws and Template:Rws. New power signal boxes were provided at Template:Rws and Parks Bridge Junction, enabling seven manual boxes to be abolished.Template:Sfn On 1 December 1929, four-aspect colour light signals were introduced between Template:Rws and New Cross. A new power box at North Kent East Junction allowed the abolition of seven more manual boxes.Template:Sfn The increased services provided by electric trains meant that there were fewer paths available for freight trains to reach the marshalling yard at Hither Green. Therefore, the Greenwich Park Branch Line, which had closed on 1 January 1917 and thereafter was only used by freight trains as far as Template:Rws, was brought back into use on 30 June 1929 as far as the point at which it crossed the SEML, a new spur being provided to give access to Hither Green. The reopened section of line was also electrified and provided with four aspect colour light signalling.Template:Sfn

In 1934, it was announced that the electrification of the SEML would be extended to Sevenoaks, including the loops at Chislehurst Junction. Electric services from Sevenoaks began on 6 January 1935.Template:Sfn In February 1936, it was announced that the SR intended to extend electrification of the SEML to Tonbridge, as part of a scheme to electrify the Hastings line. In February 1937, it was announced that this part of a wider electrification scheme would be completed in January 1939. However, in February 1938, it was announced that the Hastings electrification had been abandoned due to the cost of having to either build dedicated rolling stock or rebore the tunnels to allow ordinary stock to work through them.Template:Sfn

In 1954, Charing Cross, and to a lesser extent London Bridge, were remodelled to enable them to handle 10-coach trains on the suburban network.Template:Sfn Cannon Street station was remodelled in 1955. On 5 April 1957, a fire destroyed the signal box at Cannon Street and severely affected the operation of trains. Following the construction of a temporary signal box, a reduced service was operated from 5 May, a skeleton service having operated in the interim.Template:Sfn A new signal box was built, coming into service on 16 December.Template:Sfn

File:Polhill Tunnel geograph-2386596-by-Ben-Brooksbank.jpg
Polhill Tunnel with 2 EPBs near Sevenoaks in 1958.

British Railways started to implement its 1955 Modernisation Plan. This extended electrification to the Kent Coast in two stages, with the South Eastern Main Line being subject of "Kent Coast Electrification - Stage 2".Template:Sfn As part of Stage 1, Chislehurst Junction was rebuilt to allow an increase of speed on the connecting lines from Template:Convert to Template:Convert.Template:Sfn Stage 2 extended electrification along the remainder of the SEML to Dover. Ashford, Shorncliffe and Template:Rws stations were rebuilt.Template:Sfn Colour light signalling was installed throughout, with new signal boxes being built at Hither Green, Chislehurst Junction, Orpington, Sevenoaks, Tonbridge, Ashford and Folkestone Junction. This allowed the abolition of 32 signal boxes, with eleven more reduced to occasional use and one being manned during morning peak hours only.Template:Sfn Electric services on the full length of the SEML began on 12 June 1961.Template:Sfn This was accompanied by a voltage upgrade to 750 V DC across the whole the Southern Region.Script error: No such module "Unsubst". Completion of the scheme would allow the phasing out of steam from the Eastern area of the Southern Region of British Railways.Template:Sfn Template:Rws closed to passengers on 6 September 1965.Template:Sfn In December 1969, it was announced that all electric multiple units built before 1939 were to be withdrawn by 1972.Template:Sfn In 1972, work began on rebuilding and resignalling London Bridge, with a new power signal box built at London Bridge. The scheme cost £23.5 million and was completed in December 1978.Template:Sfn

The line was largely left untouched, until the arrival of the Channel Tunnel at Cheriton, near Folkestone. Prior to construction of High Speed 1, also known as the Channel Tunnel Rail Link (CTRL), services ran over the South Eastern Main Line to Petts Wood, leaving at Chislehurst junction onto the Chatham Main Line. Freight services for the Channel Tunnel were routed via the Maidstone East Line. The CTRL was built alongside the line to Ashford where is joined in to gain access to the existing station. The CTRL diverges west of Ashford to pursue a separate route to its new London terminus (St Pancras). Thus a short section of the line through Ashford is also electrified at 25 kV AC.

Accidents

Over the years, a number of accidents have occurred at various locations on the South Eastern Main Line.

  • On 28 July 1845, a passenger train was run into by a steam locomotive at Template:Rws, injuring about 30 people.[13]
  • On 21 January 1846, a bridge over the River Medway collapsed in a flood. The driver of a freight train was killed when he tried to jump clear of the train.[14]
File:Staplehurst rail crash.jpg
Staplehurst, 1865.
  • 9 June 1865 - the Staplehurst rail crash. An error by track workers resulted in the deaths of ten people when a train crossed a bridge from which the rails had been removed. A further 40 people were injured, including Charles Dickens.
  • On 30 September 1866, the slip portion of a train, which was to be worked forwards to Hastings, failed to stop at Tunbridge due to an error by the slip guard. It crashed into a rake of empty carriages Template:Convert east of the station. Eleven of the 40 passengers were injured.[15]
  • January 1877 - a landslip at the eastern end of Martello Tunnel brought down some Template:Convert of chalk, killing three men. The line was closed for two months.Template:Sfn
  • 7 June 1884 - A double-headed freight train ran into the rear of another freight train at Tub's Hill station, Template:Stnlnk. Both crew of the first train were killed. the Template:Stnlnk signalman was charged with causing their deaths. The trains were being worked under the time interval system.Template:Sfn
  • 5 December 1905 - the Charing Cross roof collapse. Structural failure of the overall roof at Charing Cross station led to the death of six people.
  • 5 March 1909 - A train for Template:Stnlnk overran signals and collided with a boat train at Template:Stnlnk. Two people were killed and eleven were injured.[16]
  • 19 December 1915 - a landslip between Martello Tunnel and Abbotscliff Tunnel derailed a passenger train hauled by a D class locomotive. Nearly Template:Convert of line was affected. At Template:Stnlnk the line had been pushed Template:Convert towards the sea.Template:Sfn
  • 5 May 1919 - a goods train overran signals and ran into the back of another goods train at Template:Stnlnk. One person was killed.Template:Sfn
File:Accident ferroviaire de Sevenoaks - locomotive A800-photo2.jpg
Sevenoaks, 1927.
  • 24 August 1927 - the Sevenoaks railway accident. River class tank locomotive No. 800 River Cray derailed on passing under the Shoreham Lane bridge between Dunton Green and Sevenoaks.[17] Thirteen people were killed and 20 were injured. The locomotives were withdrawn and rebuilt as tender locomotives.
  • 4 December 1957 - the Lewisham rail crash. A train hauled by Battle of Britain class steam locomotive 34066 Spitfire ran into the rear of a train comprising two four-coach electric multiple units and one two-coach electric multiple unit, having passed a signal at danger. The accident happened under a bridge carrying the Greenwich Park branch line. The bridge collapsed onto the wreckage of the two trains, killing 90 people and injuring 173.
  • 12 August 1958 - the 06:52 Template:Stnlnk to Template:Stnlnk train derailed at Borough Market Junction, completely blocking all lines into Charing Cross. The cause was worn trackwork at Borough Market Junction.Template:Sfn
  • 28 January 1960 - the 13:22 Template:Rws to Charing Cross overran signals at Borough Market Junction and was in a sidelong collision with the 12:20 Template:Rws to Charing Cross. The 14:53 Charing Cross to Template:Rws then ran into the derailed Hayes train. Seven people were injured.Template:Sfn
  • 8 December 1961 - at 02:02, a goods train was setting back at Template:Stnlnk when the 00:20 goods from Hoo Junction to Template:Stnlnk overran signals and collided with it. The wreckage from the accident piled up under the bridge carrying the B2160 Maidstone Road. The line was blocked for 12 hours.[18]
  • 5 November 1967 - the Hither Green rail crash. A train formed of two 6S diesel-electric multiple units derailed on a broken rail at Template:Stnlnk, killing 49 people and injuring 78.
  • 4 January 1969 - the Marden rail crash. A train formed of two 4CEP electric multiple units ran into the back of a parcels train just west of Template:Stnlnk after passing a signal at danger. Four people were killed and eleven were injured.
  • 17 February 1970 - an electric multiple unit was derailed at Borough Market Junction, causing suspension of services between Template:Rws and Charing Cross.Template:Sfn
  • 6 May 1975 - an electric multiple unit was derailed at Borough Market Junction. No trains were able to run directly between Charing Cross and Waterloo East until the next day.Template:Sfn
  • 4 March 1976 - a bomb exploded on an empty stock train at Cannon Street. Eight people in an adjacent train were injured.Template:Sfn
  • 14 September 1996 - a wagon in a freight train hauled by 47 360 and 47 033 derailed near Template:Stnlnk due to the train being driven at a speed in excess of the wagon's speed limit and the wagon probably being loaded unevenly.[19]
  • 8 January 1999 - the Spa Road Junction rail crash. An eight-coach train comprising a 4CEP and a 4VEP electric multiple unit collided with an eight-coach train comprising two Class 319 electric multiple units after the former train passed a signal at danger. Four people were injured.
File:Shakespeares Cliff Dover England.jpg
Shakespeare Tunnel, showing the original viaduct which was later infilled. The rotting of this structure means that the entire line will need to be rebuilt here, following the failure of the sea wall in December 2015.
  • 24 December 2015 - damage to the sea wall between Template:Rws and Template:Rws led to closure of the line "until further notice",[20] later reported to be until the end of February.[21] In mid-February 2016, it was revealed that the original wooden viaduct which carried the line, and had been subsequently infilled, had rotted. The section of line affected would need to be completely rebuilt, a process which would take much longer than originally envisaged.[22] Network Rail Chief Executive Mark Carne stated that repairs could take "six to twelve months",[23] although works were completed ahead of schedule with the line reopening on 5 September.

Services

File:Charing Cross stn platform 4 look northbound.JPG
London Charing Cross

Stopping services run from Charing Cross or Cannon Street to Orpington or Sevenoaks, with other services on the route running fast over this section. Beyond Sevenoaks, stopping services originating from Tunbridge Wells, just off the main line, cover the stations with other services on the route running fast over this section

At Tonbridge services from the original main route – now the rural Redhill–Tonbridge line – join from Redhill, while the main line to Hastings via Tunbridge Wells diverges.

At Paddock Wood the Medway Valley line diverges.

At Ashford the Maidstone East Line (from Swanley) and High Speed 1 joins, while several lines diverge: the Canterbury West line (to Ramsgate and beyond), High Speed 1 and Marshlink (to Hastings).

As of December 2022 there are four off-peak "Kent Coast" services between London and Tonbridge:

  • 1 train per hour (tph) from Charing Cross to Ashford International and Dover Priory
  • 1 tph from Charing Cross to Ashford International, Canterbury West and Ramsgate
  • 1 tph from Charing Cross to Hastings, all stops from Tunbridge Wells
  • 1 tph from Charing Cross to Hastings, semifast

From Ashford International to Dover Priory there is a further 1tph formed by a HS1 service from St Pancras.

There are a further four "Metro" services on the suburban part of the line:

  • 2 tph from Charing Cross to Orpington and Sevenoaks
  • 2 tph from Cannon Street to Orpington
  • Additional Metro services diverge off the line at Lewisham or Hither Green.

Rolling stock

Services are formed using SE Trains’s fleet of Template:Brc and Template:Brc Electrostars and older Template:Brc and Template:Brc Networker units. Previously Class 377 or Class 455s operated by Southern ran on the line between the London terminus and London Bridge.

Sights

File:Hither green TMD 1980.jpg
Hither Green depot

The major rail depots, visible near Hither Green, are the Hither Green Traction Maintenance Depot (TMD) and the nearby Grove Park Depot and Sidings.

Picturesque and unfamiliar sights (to visitors) on the line are oast houses, traditional farm buildings used for drying hops, whose conical roofs are tipped by distinctive cowls.

Notes

Template:Notelist

References

Template:Reflist

Sources

  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".

External links

Script error: No such module "Navbox". Script error: No such module "Navbox".

Template:Coord

  1. a b c Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. a b c d Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".
  9. Script error: No such module "citation/CS1".
  10. Script error: No such module "Citation/CS1".
  11. Script error: No such module "citation/CS1".
  12. a b Script error: No such module "citation/CS1".
  13. Template:Cite newspaper The Times
  14. Template:Cite newspaper The Times
  15. Script error: No such module "citation/CS1".
  16. Script error: No such module "citation/CS1".
  17. Script error: No such module "citation/CS1".
  18. Script error: No such module "citation/CS1".
  19. Script error: No such module "citation/CS1".
  20. Script error: No such module "citation/CS1".
  21. Script error: No such module "citation/CS1".
  22. Script error: No such module "citation/CS1".
  23. Script error: No such module "citation/CS1".