Folkestone Central railway station

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short descriptionTemplate:Use dmy dates Template:Use British English Script error: No such module "Infobox".Template:Template otherScript error: No such module "Parameter validation".Script error: No such module "Check for unknown parameters".Script error: No such module "check for deprecated parameters".

File:Dover, Folkestone & Tunbridge Wells RJD 33.jpg
A 1908 Railway Clearing House map of lines around Folkestone (lower left)

Folkestone Central railway station is on the South Eastern Main Line in England, and is the main station serving the town of Folkestone, Kent. It is Script error: No such module "convert". down the line from London Charing Cross. All trains that call are operated by Southeastern.

History

The South Eastern Main Line reached Folkestone in 1843, with a station being opened at Folkestone Junction (Folkestone East) on 18 December 1843. Folkestone West was then opened in 1863, with a station named Cheriton Arch being provided between the two on 1 September 1884. The name Radnor Park was adopted in 1886, and for a few years with just two platform faces, the station was rebuilt in 1890 to add a bay.[1] The station was renamed Folkestone Central in 1895.

The station was rebuilt at the time of the route's electrification in 1961[2] with two island platforms, linked by a subway and with ramps leading up from the ticket office and concourse, which is itself above street level (an approach road and accompanying pedestrian ramp leads up from Cheriton Road). In 1999 one island platform was abandoned, along with the subway; the platform has not been demolished, although all buildings have been removed.[1]

Services to and from Dover Priory were suspended on 24 December 2015 due to major damage to the track and sea wall near Dover harbour caused by strong winds & tidal surges.[3] A replacement bus service was operation between the two stations, along with a modified timetable whilst repair work was carried out. A new £44.5 million viaduct was constructed to replace the old rail embankment and sea wall.[4] The line reopened on 5 September 2016, as the work progressed faster than originally anticipated.[5]

Services

All services at Folkestone Central are operated by Southeastern using Template:Brc and Template:Brc EMUs.

The typical off-peak service in trains per hour is:[6]

During the peak hours, there are also services to and from London Cannon Street and there is also 1 train per day to Template:Stn.

Preceding station National Rail National Rail Following station
Southeastern
Southeastern
Disused railways
Folkestone West
Template:Smalldiv
  Script error: No such module "If empty".<div style="height:8px; background-color:#Script error: No such module "If empty".; color:inherit; border:none; margin:0 -5px -2px;">   Folkestone East
Template:Smalldiv
    Folkestone Warren Halt
Template:Smalldiv
South Eastern and Chatham Railway

Script error: No such module "Check for unknown parameters".

References

<templatestyles src="Reflist/styles.css" />

  1. a b Script error: No such module "citation/CS1".
  2. Body, Geoffrey. PSL Field Guide – Railways of the Southern Region (1984), pages 96–97. Patrick Stephens Ltd, Cambridge. Template:ISBN
  3. "Railway between Dover Priory and Folkestone Central closed after damage to sea wall"Network Rail Media Centre 27 December 2015; Retrieved 5 February 2016
  4. "Dover to Folkestone railway expected to reopen in December" Template:WebarchiveNetwork Rail press release; Retrieved 8 April 2016
  5. "Dover to Folkestone railway to reopen on Monday, 5 September, three months ahead of schedule."Network Rail press release 22 August 2016; Retrieved 25 August 2016
  6. Template:NRtimes

Script error: No such module "Check for unknown parameters".

External links

Script error: No such module "Coordinates".

Template:Folkestone Railway Stations Template:Kent railway stations Template:Folkestone Template:TSGN and SE Stations