Newport railway station

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Script error: No such module "other uses". Template:Short description Template:Use dmy dates Template:Use British English Script error: No such module "Infobox".Template:Template otherScript error: No such module "Parameter validation".Script error: No such module "Check for unknown parameters".Script error: No such module "check for deprecated parameters". Template:Gloucester to Newport Line Newport (Template:Langx) is the second-busiest railway station in Wales (after Cardiff Central). It is situated in Newport city centre and is Script error: No such module "convert". from Template:Rws measured via Template:Rws,[1] and Script error: No such module "convert". via Template:Rws.[2]

The station was originally opened in 1850 by the South Wales Railway Company and was greatly expanded in 1928. A new station building was built in 2010, with four full-size platforms to facilitate new Great Western Railway 10-car Intercity Express Programme trains.

The station is owned by Network Rail and managed by Transport for Wales Rail.[3] The main station entrance is located on Queensway, connected by Station Approach to the High Street; there is a further entrance adjoined to the National Car Parks site at its rear, reached from Devon Place.

Services

File:Sign displayed in Newport station, commemorating the opening of the new building.jpg
Sign displayed in Newport station, commemorating the opening of the new building. This is mounted inside the ticket office.

As at February 2019, the station is a calling point for GWR (who provide most of the services), as well as Transport for Wales Rail and CrossCountry.

In December 2022, the ORR approved Grand Union to commence a new service from Paddington to Carmarthen in partnership with Spanish rail operator Renfe, for which a fleet of new bi-mode trains was to be used. The new service, with trains calling at Bristol Parkway, Severn Tunnel Junction, Newport, Cardiff Central, Gowerton and Llanelli en route to Carmarthen,[4] was originally scheduled to commence in December 2024,[5] but is now expected to begin in December 2027.[6] In December 2024, following FirstGroup's acquisition of Grand Union Trains, it was announced the proposed London Paddington to Carmarthen service would be operated by Lumo.[7]

Transport for Wales Rail

File:Newport railway station MMB 03 175005.jpg
175005 departs with an Arriva Trains Wales service along the Welsh Marches Line. Arriva Trains Wales has since been superseded by Transport for Wales, and Class 175s by Class 197s.

In October 2008 the Welsh Government announced the launch of a new faster services between Cardiff and North Wales. The service was first operated by Template:Brc locomotives and Mark 2 passenger rolling stock. The Premier Service has premier business-class accommodation.[9] In March 2012 the service was upgraded to Template:Brc locomotives and Mark 3 rolling stock, and the Mark 3 sets were in turn replaced by Mark 4 sets.

After securing the Wales & Borders franchise in 2018, Transport for Wales announced that services between Newport and Ebbw Vale would reopen by 2021.[10] On 12 December 2021, the service began to Crosskeys, with the full service to Ebbw Vale Town beginning in February 2024.[11]

CrossCountry

File:170104 Newport.jpg
A Class 170 Turbostar at Newport with a CrossCountry service to Template:Rws from Template:Rws.

Great Western Railway

File:Newport railway station MMB 31 43187.jpg
A Class 43 HST tails a First Great Western service along the South Wales Main Line to London Paddington. These trains no longer run in South Wales.
File:158957 Newport and trainspotters.jpg
A Class 158 arrives at Newport with a First Great Western service to Template:Rws with the two different styles of GWR logo on the benches
Preceding station National Rail National Rail Following station

Template:Rail line one to two three routes

Pye Corner style="background:#Template:KAW colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   Transport for Wales
Ebbw Vale Town - Newport
style="background:#Template:KAW colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   Terminus
Cardiff Central   Script error: No such module "If empty".<div style="height:8px; background-color:#Script error: No such module "If empty".; color:inherit; border:none; margin:0 -5px -2px;">   Severn Tunnel Junction
    Chepstow
Cardiff Central   Script error: No such module "If empty".<div style="height:8px; background-color:#Script error: No such module "If empty".; color:inherit; border:none; margin:0 -5px -2px;">   Template:Rws
  Script error: No such module "If empty".<div style="height:8px; background-color:#Script error: No such module "If empty".; color:inherit; border:none; margin:0 -5px -2px;">   Severn Tunnel Junction
  Script error: No such module "If empty".<div style="height:8px; background-color:#Script error: No such module "If empty".; color:inherit; border:none; margin:0 -5px -2px;">   Filton Abbey Wood
  Future services  <templatestyles src="S-note/styles.css" />
Template:Rws style="background:#Template:ECT colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   Lumo
London - Carmarthen
style="background:#Template:ECT colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   Template:Rws
Cardiff East style="background:#Template:KAW colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   Transport for Wales
Maesteg / Cardiff Central - Cheltenham Spa
style="background:#Template:KAW colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   Template:Rws
Cardiff East style="background:#Template:Temporary rail colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   TBC
Cardiff - Bristol stopping service
style="background:#Template:Temporary rail colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   Template:Rws

History

File:Newport High Street totem.png
British Railways Western Region "totem" sign for Newport High Street.
File:Up freight train at Newport High Street Station - geograph.org.uk - 2127054.jpg
Up freight in 1963
File:Newport High Street 2 railway station geograph-2135070.jpg
Down iron ore train entering the station in 1963

The current station layout consists of four through-platforms numbered 1 to 4 from the south side. The original broad gauge station had only two Script error: No such module "convert". through platforms and a bay platform at the east end of the down platform. The Hillfield railway tunnels to the west of the station were dug under Stow Hill in the 1840s.[15] On the closure of Dock Street and Mill Street stations to passengers in 1880, High Street station was greatly expanded: The up platform was made into an island - the north face Script error: No such module "convert". in length, and the south side Script error: No such module "convert".. The down platform was extended to Script error: No such module "convert"., with the west end bay extended to Script error: No such module "convert".. Two scissors crossovers were provided on these new platforms, effectively dividing them into two. The original down platform became Nos. 1 and 2. The bay became No. 3, the south face of the up platform Nos. 4 and 5 and the north face Nos. 6 and 7. The bay platform was mostly used for Monmouthshire western valleys services, but with the quadrupling of the line in 1912 trains from the bay platform (on the south side) now had to cross the entire station to get to the Gaer Tunnel on the north side. To address this the former loading dock on the north side of the station was made into a passenger platform (No. 8).

April 1961 saw the introduction of colour Multiple-Aspect Signalling and associated modifications to the station layout. The north face of the island platform became the new up platform, with the south face becoming the new down. The platforms were also renumbered in the opposite direction to match the new line designations — No. 8 became No. 1, Nos. 6/7 became 2, Nos. 4/5 became No. 5 and Nos. 1/2 became No. 6. Lines 3 and 4 became the designations for the through non-platform lines. Subsequent removal of the scissors crossovers saw a further combination and renumbering of platforms to the current layout.

Name

File:Newport Railway Station Old Concourse.jpg
Exterior of the old concourse, converted to offices in 2011

Originally named Newport High Street, the suffix High Street became unnecessary on the closure of Mill Street and Dock Street stations to goods traffic in the 1960s.[16] Printed tickets and National Rail enquiries use the suffix "South Wales" to differentiate this station from its namesake in Essex. In 2007 the Newport Unlimited urban regeneration company proposed the station be renamed Newport City railway station; however, this suggestion was not taken up.[17]

Accidents and incidents

  • On 19 August 1938, a passenger train was sent into a siding due to a signalman's error. It crashed through the buffers but the locomotive stopped short of falling into the River Usk.[18]

Facilities

File:Sculpture Newport Station.JPG
The "Archform" sculpture by Harvey Hood, in the station forecourt on the site of the old west-facing bay platform

Platform 1 is only mainly used for westbound services to Cardiff Central during peak times. Platform 2 is usually the stopping point for all westbound services to Cardiff Central. Platform 3 is usually the stopping point for eastbound services to London Paddington and Nottingham. Platform 4 is usually the stopping point for eastbound services to Manchester Piccadilly, Holyhead, Portsmouth Harbour, Taunton and Cheltenham Spa and will also be used by trains to Ebbw Vale following the full re-opening of the Ebbw Valley Railway.

A British Transport Police station is situated on platform 1 and a branch of WH Smith runs from a kiosk on platform 2. The waiting room and customer toilets are situated between platforms 2 and 3, as is the Upper Crust café. Also between platforms 2 and 3 is a customer help desk. The booking hall is situated between the main entrance and platform 1. There are three main windows for tickets for immediate travel and a travel centre which handles enquiries, complaints and issues tickets for future travel. In the booking hall there is also a small buffet, telephones, automatic ticket machines and a photo booth. Wheelchair access between platforms is provided via a bridge, accessed by a lift from the platforms. There is a short-stay car park and taxi rank situated to the front and a long-stay car park to the rear which is accessible via a footbridge from all platforms. Since October 2005, automatic ticket barriers have been installed. At the same time, the ticket barriers are being used more often, before used during peak periods and match days, now staffed throughout the day until late in the evening.

2007 development

The Welsh Government and Network Rail agreed a £20 million makeover for the station that provided two new concourses, a second pedestrian bridge over the tracks and a user-friendly bus-rail interchange at the station. The plans also included an extended platform 4 capable of accommodating up to twelve-carriage intercity trains and a new multi-storey car park for long-stay travellers. The initial redevelopment of Platform 4 did not allow for disabled access, resulting in station staff using a locally contracted taxi firm at £3 a passenger to move disabled and elderly passengers the half-mile from one side of the station to the other, in a complimentary service provision.[19] The first phase, platform 4 extension, was completed on 2 July 2007, with design works completed by Atkins.[20]

2009 development

File:Newport railway station MMB 48.jpg
Panorama of the interior of the new footbridge at the south stairwell.
File:A new gateway for Wales (9) - geograph.org.uk - 1640291.jpg
The new concourse during construction in December 2009
File:Newport Railway Station Concourse.jpg
Exterior of the new concourse opened 2010

Planned to enable the station to cope with passenger traffic associated with the 2010 Ryder Cup, a second passenger bridge was built linking the whole station with a lift for all platforms. Network Rail claimed accessibility and safety are at the heart of the new design.

The new bridge is clad in ethylene tetrafluoroethylene (ETFE),[21] the material which protects the Eden Project in Cornwall. The station enhancements were engineered by Atkins Engineers, based in Exeter and Swindon, with design support from Grimshaw Architects and Vector Foiltec working as sub-consultants.[22] The new north and south concourses opened on 13 September 2010.[23]

The development was criticised by RAIL magazine columnist Barry Doe for being at the wrong end of the station, a lack of seating and generally poor design.[24] The station was nominated in 2011 for the Carbuncle Cup, awarded for the ugliest building of the year.[25]

Arriva Trains Wales had expressed concern about a leaking roof, an inadequate customer service area and insufficient ticket gates.[21] Network Rail said the roof was fixed in mid-May 2011, but issues had resumed in 2013.[26] Transport for Wales acquired the management of the station in 2018 and are replacing station infrastructure across the network.[10]

Subsequent developments

The whole Newport area was re-signalled from 2009 to 2012, providing speed improvements on the relief lines.

The Great Western Main Line from London to Cardiff was electrified as part of the Great Western Main Line electrification scheme.[27] As part of this the former footbridge was removed in 2017.[28] Following the introduction of Hitachi Rail British Rail Class 800/802 trains and the new timetable introduced on 15 December 2019, journey times between Newport and London Paddington were reduced to around 1 hour 30 minutes[29] The power from Bristol Parkway through Newport was switched on on 14 September 2019, with electric running extended to Newport from 15 December, and as far as Cardiff over the Christmas period.[29]

In September 2018, plans were submitted to Newport City Council for a new footbridge between Devon Place and Queensway, to replace the subway used since the closure of the previous footbridge.[30] The bridge opened in April 2023. [31]

The South East Wales Transport Alliance (SEWTA) have proposed an additional service (one in every two hours) to Abergavenny with a re-opened station in Caerleon, two trains per hour between Cwmbran and Abergavenny, and an hourly service to Pontypool and New Inn, subject to line enhancements in Abergavenny.

Transport for Wales have included some of these proposals in their plans for the later stages of their South Wales Metro scheme.[10]

Media

in 2020, the Rail Delivery Group nominated Newport as one of the Welsh stations as a contender for the World Cup of Stations. However, it did not pass the group stages.[32]

See also

References

<templatestyles src="Reflist/styles.css" />

  1. Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. ORR approves Grand Union London - Carmarthern trains Rail issue 972 14 December 2022 page 17
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. Script error: No such module "citation/CS1".
  8. GB eNRT 2015-16 Edition, Table 128 (Network Rail)
  9. Script error: No such module "citation/CS1".
  10. a b c Script error: No such module "citation/CS1".
  11. Script error: No such module "citation/CS1".
  12. GB eNRT 2015-16 Edition, Table 51 (Network Rail)
  13. GB eNRT 2015-16 Edition, Table 125 (Network Rail)
  14. GB eNRT 2015-16 Edition, Table 134 (Network Rail)
  15. Script error: No such module "citation/CS1".
  16. Railway Magazine, July 1960
  17. Script error: No such module "citation/CS1".
  18. Script error: No such module "citation/CS1".
  19. Taxis used between rail platforms BBC News - 17 August 2007
  20. Script error: No such module "citation/CS1".
  21. a b Script error: No such module "Citation/CS1".
  22. Script error: No such module "citation/CS1".
  23. Script error: No such module "citation/CS1".
  24. Script error: No such module "Citation/CS1".
  25. Script error: No such module "citation/CS1".
  26. Script error: No such module "citation/CS1".
  27. Script error: No such module "citation/CS1".
  28. Newport railway station footbridge set to be removed South Wales Argus 18 March 2017
  29. a b Script error: No such module "citation/CS1".
  30. Script error: No such module "citation/CS1".
  31. Script error: No such module "citation/CS1".
  32. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

Template:Sister project

Template:Transport in Newport Script error: No such module "Navbox". Template:South Wales Metro