Farebox recovery ratio

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Template:Use dmy dates Script error: No such module "Unsubst". The farebox recovery ratio (also called fare recovery ratio, fare recovery rate or other terms) of a passenger transportation system is the fraction of operating expenses which are met by the fares paid by passengers. It is computed by dividing the system's total fare revenue by its total operating expenses.[1]

Fare structures

There are generally two types of fare structures: a simple, flat rate fare structure (pay a fixed fare regardless of time of day and/or travel distance) or a complex, variable rate fare structure (pay a variable fare depending on time of day and/or travel distance). A variable fare structure is typically associated with a higher recovery ratio, though it may simply be the case that such systems are implemented only on more profitable networks or modes such as commuter rail. Variable-rate fares require a higher initial investment in fare ticketing technologies such as the use of contactless smart cards, turnstiles or fare gates, automated ticket machines, as well as IT infrastructure.[2]

Farebox ratios around the world

The farebox recovery ratio is the ratio of fare revenue to total transport expenses for a given system.[1] These two figures can be found in the financial statements of the operators. Oftentimes the operator runs multiple modes of transport (e.g. subway and bus), and there is no data for individual modes (segment analysis). In this case the operator is considered as one system, or a group of modes are collectively considered one system.

Fare revenue is not the same as "transport" or "operational" revenue, as there are often secondary sources of revenue such as lockers and paid restrooms and advertisement revenue. Fare revenue is a subset of transport revenue, which is in turn part of total revenue along with "non-transport" or "non-operational" revenue.

Total "transport" or "operational" expenses are a part of total expenses along with "non-transport" or "non-operational" expenses. Total transport expenses may include expansion projects if they are paid for by the operator.

Asia

Please note that, the "operating ratio" (Template:Langx Template:Langx) commonly published by some Asian systems is different from farebox recovery ratio even after inverting the number to turn cost per unit revenue into revenue per unit cost, as that figure includes all operating revenue instead of only the fare revenue.[3]

Country or Region System Ratio Fare system Year
Hong Kong Mass Transit Railway (MTR) 106.76% Mostly Distance based 2021[4]
Hong Kong Hong Kong Tramway 48.80% Flat rate 2021[5]
Hong Kong Kowloon Motor Bus 100.05% Route-specific 2021[6]
Long Win Bus 77.91% Route-specific 2021[6]
Hong Kong Citybus 72.98%[7] Route-specific 2021[8]
New World First Bus 76.73% Route-specific 2021[8]
Japan JR Central Rail 245.95% Distance based FY2018[9]
Japan JR East Rail 142.44% Distance based FY2018[9]
Japan JR West Rail 132.38% Distance based FY2018[9]
Japan JR Kyushu Rail 111.34% Distance based FY2018[9]
Japan JR Shikoku Rail 69.84% Distance based FY2018[9]
Japan JR Hokkaido Rail 59.18% Distance based FY2018[9]
Japan JR Freight Freight rail 96.25% Distance based FY2018[9]
Japan Sapporo Municipal Subway 220.79% Distance based FY2018[9]
Sapporo Streetcar 104.31% Flat rate FY2018[9]
Japan Hakodate Streetcar 82.87% Distance based FY2018[9]
Japan Sendai Subway 159.68% Mixed zonal and distance based FY2018[9]
Japan Tokyo Metro 161.55% Distance based FY2018[9]
Japan Tokyo Toei rail services 74%[10]Script error: No such module "Unsubst". Distance based 2015
Tokyo Toei Subway 171.46% Distance based FY2018[9]
Tokyo Toei Streetcar 83.39% Flat rate FY2018[9]
Tokyo Toei elevated rail 109.84% Flat rate FY2018[9]
Tokyo Toei other rails 136.81% Distance based FY2018[9]
Japan Yokohama Municipal Subway 232.28% Distance based FY2018[9]
Japan Meitetsu Railway 155.99% Distance based FY2018[9]
Meitetsu Tramway 90.70% Distance based FY2018[9]
Japan Nagoya Municipal Subway 167.24% Distance based FY2018[9]
Japan Kintetsu Railway Rail 152.77% Distance based FY2018[9]
Kintetsu Railway Cable 36.70% Various FY2018[9]
Japan Nankai Electric Railway Rail 161.26% Distance based FY2018[9]
Nankai Electric Railway Cable 31.12% Flat rate FY2018[9]
Japan Keihan Electric Railway Rail 166.51% Distance based FY2018[9]
Keihan Electric Railway Subway 29.05% Distance based FY2018[9]
Japan Keihan Electric Railway Streetcar 73.08% Distance based FY2018[9]
Keihan Electric Railway Cable 71.73% Flat rate FY2018[9]
Japan Hankyu Railway 123% Distance based 1991[11]
169.74% FY2018[9]
Japan Hanshin Electric Railway 146.75% Distance based FY2018[9]
Japan Osaka Municipal Transportation Bureau 137% Distance based 1991[11]
Osaka Metro Subway 208.51% Distance based FY2018[9]
Osaka Metro APM/AGT 105.35% Distance based FY2018[9]
Japan Kyoto Municipal Subway 201.04% Distance based FY2018[9]
Japan Kobe Municipal Subway 169.52% Distance based FY2018[9]
Japan Nishi-Nippon Railroad Rail 149.92% Distance based FY2018[9]
Japan Fukuoka City Subway 205.38% Distance based FY2018[9]
Japan Kitakyushu Monorail 144.15% Tabular FY2018[9]
Japan Nagasaki Electric Tramway 105.11% Flat rate FY2018[9]
Japan Kumamoto Tram 102.60% Flat rate FY2018[9]
Japan Kagoshima Tram 98.36% Flat rate FY2018[9]
Japan Okinawa Urban Monorail 187.55% Distance based FY2018[9]
Pakistan Lahore Metrobus 37.2% [12] Flat rate 2014
Taiwan Taipei Mass Rapid Transit 87.64% Distance based 2021[13]
Taiwan Kaohsiung Mass Rapid Transit 52.57% Distance based 2020[14]
Singapore SMRT Corporation (Singapore) 101% Distance based 2018[15]
China Beijing Subway 22% Flat rate[16] 2013[17]
35.08% Distance based 2021[18]
China Shenzhen Metro 82.20%[19] Distance based 2021[20]
China Guangzhou Metro 77.05%[21][22] Distance based 2021[21]

Europe

Country Region / City System Ratio Fare system Year
Austria Vienna Vienna U-Bahn 49% Flat rate 2008[23]
Germany Berlin Berliner Verkehrsbetriebe 70% Zone based 2010[24]
Belgium Brussels Brussels Intercommunal Transport Company 35% 2007[25]
Czechia Prague Prague Integrated Transport 53% Flat rate 2013[26]
Denmark Copenhagen Copenhagen Metro 93.5% Zone based 2023[27]
France Paris Île-de-France Mobilités 29% Flat rate for passes
Distance based for tickets
2018[28]
Germany Munich Munich Transport and Tariff Association 70% Zone based 2010[29]
Italy Milan Milan Transportation System 49% 2016[27]
Italy Rome Rome Metro 36% 2007[25]
Netherlands Amsterdam Gemeentelijk Vervoerbedrijf Amsterdam 88% Distance based 2018[30]
Netherlands Rotterdam Rotterdamse Elektrische Tram 99% Distance based 2018[31]
Poland Warsaw ZTM 37% 2019[32]
Spain Catalonia Metropolitan lines of Ferrocarrils de la Generalitat de Catalunya (Catalonia) 93% Zone based 2014[33]
Spain Madrid Madrid Metro 41% 2007[25]
Sweden Stockholm Storstockholms Lokaltrafik 52% Flat rate 2017[34]
Sweden Östergötland County Östgötatrafiken 43% Zone based 2023[35]
Switzerland Zurich Zürich S-Bahn 60% Zone based 2014[27]
Finland Helsinki Helsinki Regional Transport Authority 49%[36] Zone based 2019
Turkey Istanbul Metro Istanbul A.S. 90% Flat rate 2019[37]
United Kingdom London London Underground 129.50%[38] Zone based 2022-2023[38]
London Overground and Docklands Light Railway 94%[39] Zone based 2018–19[39]

North America

Canada

Canada Farebox recovery rate
Region Operator Fare Revenue Operating Expenses Ratio Fare System Year
Nationwide VIA Rail 51% Distance & demand based 2016[40]
Brampton Brampton Transit 50% Flat rate 2019[41]
Calgary Calgary Transit 50% Flat rate 2012[42]
Edmonton Edmonton Transit System 39% Flat rate
Mississauga MiWay 46% Flat rate 2011[43]
Montreal Société de transport de Montréal 46% Flat rate 2016[44]
Ottawa OC Transpo 45% Flat rate 2019[45]
Quebec City Réseau de transport de la Capitale 39% Flat rate 2011[43]
Toronto and Hamilton Toronto Transit Commission 26.2% Flat rate 2021[46]
GO Transit 20.13%[47] Distance based 2022-23[48]
Vancouver TransLink 43.7% Zone based; transition to distance based upcoming 2022[49]
Victoria BC Transit (Victoria regional transit system) 28.4% Flat rate 2022[50]
Winnipeg Winnipeg Transit 60% Flat rate 2011[43]
York York Region Transit 40% Flat rate 2015[51]

United States

Region System Operator Fare Revenue Operating Expenses Ratio Fare System Year
Nationwide Amtrak 95% Distance & demand based 2017[52]
Montgomery County MD, DC RideOn $5,276,327 $178,136,970 3% Flat Rate 2023[53]
Northern Virginia, DC VRE (Virginia Railway Express) $28,000,000 $190,000,000 15% Distance based 2023[54]
Boston, MA-NH-RI MBTA $545,414,783.00 $1,556,792,859.00 20.5% Flat rate[55] 2023[56]
New York-Newark, NY-NJ-CT NYC Ferry 29% Flat Rate 2017[57]
MTA Bus $95,403,036.00 $712,036,903.00 13.40% 2020[58]
MTA Long Island Rail Road $272,532,791.00 $1,464,445,571.00 18.61% Zone based[59] 2020[58]
MTA Metro-North $243,671,760.00 $1,207,182,081.00 20.19% Distance based[59] 2020[58]
MTA New York City Transit $2,018,495,902.00 $8,258,335,723.00 24.44% Flat rate[59] 2020[58]
MTA Staten Island Railway 11% Flat rate 2019[59]
PATH $73,263,022.00 $448,244,536.00 16.34% Flat rate[60] 2020[58]
NYCDOT $1,342,638.00 $144,618,026.00 0.93% Free (Staten Island Ferry) 2020[58]
NJTransit $743,742,067.00 $2,325,547,904.00 31.98% Zone based on most Buses and all commuter trains
Flat Rate on some buses and all light rails[60]
2020[58]
Bee-Line Bus System $18,698,988.00 $161,250,867.00 11.60% 2020[58]
Chicago, IL-IN CTA $236,301,686.00 $1,436,453,698.00 16.45% Flat rate[61] 2020[58]
METRA $102,350,491.00 $710,195,494.00 14.41% Zone based[60] 2020[58]
Atlanta, GA Metropolitan Atlanta Rapid Transit Authority $100,300,226.00 $492,839,897.00 20.35% Flat rate[60] 2020[58]
Portland, OR-WA TriMET $94,456,931.00 $518,451,362.00 18.22% Flat rate[60] 2020[58]
Baltimore, MD MTA $102,029,183.00 $805,145,982.00 12.67% Variable[62] 2020[58]
San Diego, CA SDMTS $78,709,562.00 $291,553,478.00 27.00% Flat rate[60] 2020[58]
Houston, TX Houston Metro $37,305,222.00 $587,595,095.00 6.35% 2020[58]
Miami, FL County of Miami-Dade (Transportation & Public Work) $47,456,089.00 $553,336,216.00 8.58% Flat rate[60] 2020[58]
Denver-Aurora, CO RTD $76,264,572.00 $623,982,843.00 12.22% Zone Based[63] 2020[58]
Pittsburgh, PA PRT $79,071,495.00 $434,687,600.00 18.19% 2020[58]
Dallas-Fort Worth-Arlington, TX DART $43,547,629.00 $569,628,198.00 7.64% Flat rate[64] 2020[58]
Honolulu, HI City and County of Honolulu (Department of Transportation Services) $46,815,334.00 $278,447,442.00 16.81% 2020[58]
San Francisco-Oakland, CA SFMTA $153,699,058.00 $903,485,983.00 17.01% Flat rate[65] 2020[58]
BART $341,586,797.00 $681,983,690.00 50.09% Distance based[66] 2020[58]
AC Transit $66,561,904.00 $501,047,399.00 13.28% 2020[58]
Oakland Airport Connector 96% Flat rate 2015–2016[67]
Minneapolis-St. Paul, MN-WI Metro Transit $40,804,932.00 $413,038,880.00 9.88% Flat rate with rush hour and express surcharges[60] 2020[58]
Los Angeles-Long Beach-Anaheim, CA Orange County Transportation Authority $42,450,631.00 $268,394,220.00 15.82% 2020[58]
LA Metro $199,728,314.00 $1,841,473,552.00 10.85% Flat rate[60] 2020[58]
Long Beach Transit $10,201,475.00 $92,339,794.00 11.05% 2020[58]
Phoenix-Mesa, AZ Valley Metro $21,292,051.00 $208,489,994.00 10.21% 2020[58]
San Antonio, TX VIA Metropolitan Transit $15,033,510.00 $222,032,078.00 6.77% Flat rate[60] 2020[58]
St. Louis, MO-IL St. Louis Metro $30,986,092.00 $282,175,101.00 10.98% 2020[58]
San Jose-Sunnyvale-Santa Clara, CA VTA $28,886,823.00 $403,260,461.00 7.16% 2020[58]
Buffalo, NY NFTA $34,814,699.00 $141,163,925.00 24.66% 2020[58]
Salt Lake City-West Valley City, UT UTA $32,521,480.00 $319,885,004.00 10.17% 2020[58]
Austin-Round Rock- San Marcos, TX CapMetro $15,298,332.00 $229,551,099.00 6.66% Flat rate[60] 2020[58]
Charlotte, NC-SC CATS $21,018,416.00 $162,317,729.00 12.95% 2020[58]
Detroit–Warren–Dearborn, MI DDOT $13,954,074.00 $101,100,585.00 13.80% Flat rate[60] 2020[58]
Miami–Fort Lauderdale–West Palm Beach, FL BCT $13,814,362.00 $158,832,625.00 8.70% 2020[58]
Milwaukee–Waukesha, WI MCTS $16,739,398.00 $141,752,155.00 11.81% 2020[58]
Orlando–Kissimmee–Sanford, FL Lynx $13,596,128.00 $139,097,081.00 9.77% Flat rate[60] 2020[58]
Sacramento, CA SacRT $21,517,225.00 $173,873,225.00 12.38% 2020[58]
Cleveland–Elyria, OH RTA $26,194,783.00 $259,797,759.00 10.08% Flat rate[60] 2020[58]
Washington, DC-VA-MD Washington Metropolitan Area Transit Authority $492,953,775.00 $2,028,885,121.00 24.30% Distance based[68] 2020[58]
Montgomery County, Maryland $13,387,860.00 $127,225,668.00 10.52% 2020[58]
Seattle, WA King County Metro bus 8.9% Flat[69] 2022[70]
Washington State Ferries 51% Route Based 2023[71]
Sound Transit Express Bus $14,403,774 $144,174,454 10% Zone & distance based 2023[72]
Sound Transit Link Light Rail $32,358,465 $205,314,451 16% Zone & distance based 2023[73]
Sound Transit Sounder Regional Rail $4,966,273 $65,649,821 8% Zone & distance based 2023[74]
Pierce Transit $54,164,161 $127,654,974 42% Flat rate 2021[75]
Albany-Schenectady, NY CDTA $20,804,704.00 $93,755,632.00 22.19% 2020[58]
Harrisburg, PA Capital Area Transit $2,398,430 $20,278,765 17% Flat rate 2022[76]
Las Vegas-Henderson, NV Las Vegas Monorail 56% Flat rate 2016[66]
RTC $51,823,479.00 $227,523,119.00 22.78% 2020[58]
Philadelphia, PA-NJ-DE-MD SEPTA $353,276,517.00 $1,301,894,928.00 27.14% Flat rate[60] 2020[58]
PATCO $15,542,809 $63,349,398 25% Distance based 2023[77]
Orlando, FL SunRail 7% Distance based 2018[78]
Peninsula Corridor Joint Powers Board (Caltrain) 70% Zone based 2019[79]
Santa Clara Valley Transportation Authority 10% Express surcharges 2016[80]
Southern California Regional Rail Authority (Metrolink) 34% Distance based 2019[81]

Oceania

Country Region System Ratio Fare system Year
Australia Canberra ACTION 8% Flat rate 2021[82]
Australia Melbourne Melbourne 30% Zone & time based 2014[83]
Australia Sydney Sydney Trains 20% Distance based 2016[84]
Australia Sydney Metropolitan Bus System 25% Distance based 2016[84]
Australia Sydney Sydney Ferries 32% Distance based 2016[84]
New Zealand Auckland Auckland 44% Zone based 2012–13[85]
New Zealand Christchurch Christchurch 35% Zone based 2012–13[85]
New Zealand Dunedin Dunedin 60% Zone based 2015–16[85]
New Zealand Hamilton Hamilton 34% Flat rate 2012–13[85]
New Zealand Wellington Wellington 57% Zone based 2012–13[85]

South America

Template:Empty section

References

Template:Reflist

Template:Public transport

  1. a b Script error: No such module "citation/CS1".
  2. Dr. Jean-Paul Rodrigue, The Geography of Transport Systems, Third Edition, 2013
  3. "JR&私鉄全路線の収支 「営業係数」計算式を大公開", 週刊東洋経済臨時増刊 鉄道完全解明2014, p.61-62, February 20, 2014
  4. Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. a b Script error: No such module "citation/CS1".
  7. Combined both Franchise 1 & and Franchise 2.
  8. a b Script error: No such module "citation/CS1".
  9. a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah ai aj ak al am an ao 鉄道統計年報[平成30年度]:(5)-2 鉄・軌道業営業損益:((旅客収入 + 貨物収入) / 営業費合計(諸税・減価償却費を除く) ) * 100% (((Passenger revenue + Freight revenue)/(Operation cost before taxes and depreciation))*100%)
  10. Script error: No such module "citation/CS1".
  11. a b Dr. Kenichi Shoji, "Lessons from Japanese Experiences of Roles of Public and Private Sectors in Urban Transport" Template:Webarchive, Japan Railway & Transport Review, December 2001
  12. Script error: No such module "citation/CS1".
  13. Script error: No such module "citation/CS1".
  14. Script error: No such module "citation/CS1".
  15. Script error: No such module "citation/CS1".
  16. Fare schedule was adjusted from flat rate to distance-based on 2014 (Template:Section link)
  17. 地铁票背后的"算计" Template:Webarchive(in Chinese) 01 Dec 2014
  18. Fare revenue / Associated costs (票款收入/票款成本). Associated costs (票款成本) includes depreciation. Script error: No such module "citation/CS1".
  19. Total expenses to fare revenue ratio -1 (成本费用占营业收入的比重)
  20. Script error: No such module "citation/CS1".
  21. a b 1/(100%-gross margin of passenger service) (1/(100%-地铁运营业务毛利率)) Script error: No such module "citation/CS1".
  22. 85.0% if divide Operating Revenues by Total Operating Cost (营业收入/营业总成本). Operating Revenues include fare, advertisement, real estate, R&D, government subsidy etc. Total Operating Cost includes capital expenses. Script error: No such module "citation/CS1".
  23. Script error: No such module "Citation/CS1".
  24. Script error: No such module "citation/CS1".
  25. a b c Script error: No such module "citation/CS1".
  26. Script error: No such module "citation/CS1".
  27. a b c Script error: No such module "citation/CS1".
  28. Script error: No such module "citation/CS1".
  29. Script error: No such module "citation/CS1".
  30. Script error: No such module "citation/CS1".
  31. Script error: No such module "citation/CS1".
  32. Script error: No such module "citation/CS1".
  33. Script error: No such module "Citation/CS1".
  34. Script error: No such module "citation/CS1".
  35. Script error: No such module "citation/CS1".
  36. Script error: No such module "citation/CS1".
  37. Script error: No such module "citation/CS1".
  38. a b Script error: No such module "citation/CS1".
  39. a b Script error: No such module "citation/CS1".
  40. Script error: No such module "citation/CS1".
  41. Script error: No such module "citation/CS1".
  42. Script error: No such module "citation/CS1".
  43. a b c Script error: No such module "citation/CS1".
  44. Annual report 2016 stm.info
  45. Script error: No such module "citation/CS1".
  46. Script error: No such module "citation/CS1".
  47. The ratio has been calculated by the article editor using the provided operating cost of $1,532,900,000 and the provided fare revenue of $308,500,000
  48. Script error: No such module "citation/CS1".
  49. Script error: No such module "citation/CS1".
  50. Script error: No such module "citation/CS1".
  51. Script error: No such module "citation/CS1".
  52. Script error: No such module "citation/CS1".
  53. Script error: No such module "citation/CS1".
  54. Script error: No such module "citation/CS1".
  55. Script error: No such module "citation/CS1".
  56. Script error: No such module "citation/CS1".
  57. Script error: No such module "citation/CS1".
  58. a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah ai aj ak al am an ao ap aq ar as at Script error: No such module "citation/CS1".
  59. a b c d Script error: No such module "citation/CS1".
  60. a b c d e f g h i j k l m n o Script error: No such module "citation/CS1".
  61. Script error: No such module "citation/CS1".
  62. Script error: No such module "citation/CS1".
  63. Script error: No such module "citation/CS1".
  64. Script error: No such module "citation/CS1".
  65. Script error: No such module "citation/CS1".
  66. a b Script error: No such module "citation/CS1".
  67. Script error: No such module "citation/CS1".
  68. Script error: No such module "citation/CS1".
  69. [1]
  70. Script error: No such module "citation/CS1".
  71. [https://wsdot.wa.gov/sites/default/files/2024-02/WSF-RouteStatements-FY2023.pdf Route Statements For Fiscal Years 2018 to 2023 ]
  72. 2023 fare revenue report
  73. 2023 fare revenue report
  74. 2023 fare revenue report
  75. Script error: No such module "citation/CS1".
  76. Script error: No such module "citation/CS1".
  77. Script error: No such module "citation/CS1".
  78. Script error: No such module "citation/CS1".
  79. Script error: No such module "citation/CS1".
  80. Script error: No such module "citation/CS1".
  81. Script error: No such module "citation/CS1".
  82. Script error: No such module "citation/CS1".
  83. Urban passenger transport: Updated trends Bureau of Infrastructure & Transport Research Economics
  84. a b c Cost recovery Independent Pricing and Regulatory Tribunal
  85. a b c d e Script error: No such module "citation/CS1".