Central Circular Route

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Template:Use dmy dates Script error: No such module "Infobox".Template:Template otherTemplate:Main otherScript error: No such module "Infobox road/errors".Template:Main otherScript error: No such module "Check for unknown parameters".Template:Main other

File:Shuto expressway kasai jct.jpg
Kasai JCT
File:Shuto expressway ogiohashi.jpg
Ōgi-ōhashi exit
File:Shuto expressway senjushinbashi.jpg
Senju-shinbashi exit
File:Shuto expressway kohoku jct.jpg
Kohoku JCT

The Script error: No such module "Nihongo"., signed as Route C2, is one of the routes of the Shuto Expressway system serving the central part of the Greater Tokyo Area. The route is a circumferential highway running through the outer wards of Tokyo. The route is the middle of four ring expressways planned for the city; the other three being the C1 Inner Circular Route, the C3 Tokyo Gaikan Expressway, and the C4 Ken-Ō Expressway.

Route description

The Central Circular Route has a total length of Template:Convert.

It is a ring that lies approximately Template:Convert from the center of the city and goes through the wards of Edogawa, Katsushika, Adachi, Kita, Itabashi, Toshima, Shinjuku, Nakano, Shibuya, Meguro, and Shinagawa.

File:Shutoko-YamateTunnel.JPG
Yamate Tunnel

The eastern half is an elevated structure and the western half is an underground one. The Yamate Tunnel is a deep tunnel constructed beneath Yamate Street, the first section over Template:Convert in length, was opened to traffic on 22 December 2007. From 2010, the tunnel extended the Central Circular Route south from near Ikebukuro to Ohashi Junction connecting with Route 3. The last Template:Convert through Meguro and Shinagawa was opened to traffic on 7 March 2015.[1] When this last section of the tunnel opened the Yamate Tunnel formed Japan's longest, and the world's second longest road tunnel.[2] During the tunnel's first week of operations, traffic volume on the Inner Circular Route was reduced by seven percent from the previous week, and congestion on expressways inside the Central Circular Route (an index measured by recording segments where average traffic speed is less than Template:Convert, and multiplying the affected distance by the affected time) was approximately halved from the previous week.[3]

The C2 begins and ends at the Bayshore Route, which serves to close the southeastern part of the loop.

History

The first section of the Central Circular Route was opened to traffic on 30 March 1982. Since then, the expressway was completed in phases. Construction work on underground sections of the route began in 1992. Given the extensive tunneling and engineering challenges involved, construction costs for the route were estimated to be 2 trillion yen.[4] The Central Circular Route was completed on 7 March 2015.[5]

Exit list

Template:JPNinttop Template:JPNint Template:Jcttunnel Template:JPNint Template:JPNint Template:JPNint Template:JPNint Template:JPNint Template:JPNint Template:JPNint Template:JPNint Template:Jcttunnel Template:JPNint Template:JPNint Template:JPNint Template:JPNint Template:Jcttunnel Template:JPNint Template:JPNint Template:JPNint Template:JPNint Template:JPNint Template:JPNint Template:Jcttunnel Template:JPNint Template:JPNint Template:JPNint Template:JPNint Template:JPNint Template:JPNint Template:JPNint Template:JPNint Template:JPNint Template:Jctbtm

References

Template:Reflist

Template:Shuto Expressway

Template:Coord missing

  1. Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".