BritNed

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Script error: No such module "Unsubst". Script error: No such module "Infobox".Script error: No such module "Check for unknown parameters". BritNed is a 1,000Script error: No such module "String".MW high-voltage direct-current (HVDC) submarine power cable between the Isle of Grain in Kent, the United Kingdom; and Maasvlakte in Rotterdam, the Netherlands.

The BritNed interconnector would serve as a link for the foreseeable European super grid project.

History

File:HVDC Europe.svg
<templatestyles src="Legend/styles.css" />
  Existing links
<templatestyles src="Legend/styles.css" />
  Under construction
<templatestyles src="Legend/styles.css" />
  Proposed
See also the List of HVDC project in Europe, which would eventually be part of European Supergrid

The project was announced in May 2007.[1] The installation of the first section of cable link started on 11 September 2009,[2] The entire Script error: No such module "convert". cable was completed in October 2010.[3] It began operation on 1 April 2011,[4][5] and as of January 2012, electricity flow has mostly been from the Netherlands to the UK.[6]

Technical description

The Script error: No such module "convert". long bi-pole 450Script error: No such module "String".kV interconnector consists of two HVDC cables, which are bundled together. The capacity of the cable is 1,000Script error: No such module "String".MW. The interconnector has two converter stations for connecting the link with the British and Dutch high-voltage electricity transmission systems.[7] The cable was produced by ABB and laid by Global Marine Systems, while the BAM Nuttall/Siemens consortium was responsible for the construction and equipping of the converter stations.[7][8] BritNed was completed on time and within the budget of €600Script error: No such module "String".million.[5]

Operators

The respective transmission system operators of the United Kingdom and the Netherlands - National Grid plc and TenneT; formed a joint venture to fund and operate the interconnection, independently from National Grid and TenneT's regulated businesses.[9]

Outages

BritNed suffered a number of outages due to undersea cable faults in 2020/21. A significant outage happened on 9 March 2021 and the connection was scheduled to be restored on 8 May 2021, but this was later delayed until 7 June 2021.[10]

Coordinates

Site Coordinates
Grain Static Inverter Plant Script error: No such module "Coordinates".
Maasvlakte Static Inverter Plant Script error: No such module "Coordinates".

See also

References

<templatestyles src="Reflist/styles.css" />

  1. Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".Script error: No such module "Unsubst".
  4. Script error: No such module "citation/CS1".
  5. a b Script error: No such module "citation/CS1".
  6. Justin Wilkes et al. The European offshore wind industry key 2011 trends and statistics p22 European Wind Energy Association, January 2012. Accessed: 26 March 2012.
  7. a b Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".
  9. Script error: No such module "citation/CS1".
  10. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

Template:GeoGroupTemplate

Template:National Grid Template:Energy in the United Kingdom