Awaji Station

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Script error: No such module "Unsubst". Template:Use dmy dates Script error: No such module "Infobox".Template:Template otherScript error: No such module "Parameter validation".Script error: No such module "Check for unknown parameters".Script error: No such module "check for deprecated parameters". Script error: No such module "Nihongo". is a railway station in Higashiyodogawa-ku, Osaka, Japan, operated by the private operator Hankyu Railway.

Lines

Awaji Station is an intersection of the following two Hankyu Railway lines:

In March 2019, the nearby JR-Awaji Station of the Osaka Higashi Line owned by West Japan Railway Company (JR West) has been inaugurated.[1]

Station layout

This station has two island platforms with four tracks at ground level.

Track layout of Awaji Station
Kita-Senri ↑
Osaka-umeda ← Track layout of Awaji Station → Kawaramachi, Arashiyama
↓ Tenjimbashisuji rokuchōme, Tengachaya

Platforms

2, 3  Hankyu Kyoto Main Line for Kyoto (Template:STN, Template:STN) and Template:STN
 Hankyu Senri Line for Template:STN
4, 5  Hankyu Kyoto Main Line for Template:STN, Template:STN and Template:STN
 Hankyu Senri Line for Template:STN and Template:STN

History

Awaji Station opened on 1 April 1921.[2]

Station numbering was introduced to all Hankyu stations on 21 December 2013 with this station being designated as station number HK-63.[3]

Future plans

since 2025Template:Dated maintenance category (articles)Script error: No such module "Check for unknown parameters"., work is being done to elevate a Script error: No such module "convert". X-shaped section of track from Sōzenji Station to Kami-Shinjō Station on the Kyoto Line and from Kunijima Station to Shimo-Shinjō Station on the Senri Line (including Awaji station from which the aforementioned stations are adjacent stations).[4] Construction began in 2008 and was expected to be completed in 2017 with full operation on the elevated tracks beginning in 2020. However in 2015 it was determined that the original completion date can not be achieved, and the finish date was pushed back to 2024 with operations beginning that year.[5] Later, the completion date was pushed back to 2027. In 2022, Osaka City estimated that the project would not be completed until 2031 owing to the effects of the COVID-19 pandemic as well as delays in land acquisition.[6] As a result of the delays, the cost of the project has increased by as much as Template:JPYConvert.[6]

References

<templatestyles src="Reflist/styles.css" />

  1. 直結!おおさか東線 (Direct connection! Ōsaka Higashi Line) Template:Webarchive Template:In lang (The route map on the top page indicates Awaji Station.)
  2. Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. a b Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

Template:Sister project

Script error: No such module "Navbox".

Script error: No such module "Navbox".


Script error: No such module "Coordinates".