Yokohama Municipal Subway Green Line
Template:Short description Script error: No such module "Unsubst". Script error: No such module "infobox".Script error: No such module "Check for unknown parameters".
The Script error: No such module "Nihongo". is a rapid transit line serving Yokohama in Kanagawa Prefecture, Japan. It is the shorter of the two lines in the Yokohama Municipal Subway system operated by Yokohama City Transportation Bureau. Its formal designation is Line 4, and it is the first section to be opened of a proposed Script error: No such module "Nihongo"..
The Green Line links Template:STN on the JR East Yokohama Line and Template:STN on the Tokyu Toyoko Line with Script error: No such module "convert". of track and 10 stations. Construction began in 2001 and the new line started operating on 30 March 2008.[1] It uses linear motor propulsion and a full journey takes approximately 21 minutes one way.
Stations
Platforms are above ground at Kawawachō, Center-Kita, and Center-Minami stations and underground at other stations.
| No. | Station | Japanese | Distance (km) | Transfers | Location (in Yokohama) |
|---|---|---|---|---|---|
| G01 | Template:STN | 中山 | 0.0 | Template:JRLS Yokohama Line | Midori-ku |
| G02 | Template:STN | 川和町 | 1.7 | Tsuzuki-ku | |
| G03 | Template:STN | 都筑ふれあいの丘 | 3.1 | ||
| G04 | Template:STN | センター南 | 4.8 | File:Yokohama Municipal Subway Blue Line symbol.svg Yokohama Municipal Subway Blue Line (Line 3, B29) | |
| G05 | Template:STN | センター北 | 5.7 | File:Yokohama Municipal Subway Blue Line symbol.svg Yokohama Municipal Subway Blue Line (Line 3, B30) | |
| G06 | Template:STN | 北山田 | 7.4 | ||
| G07 | Template:STN | 東山田 | 8.8 | ||
| G08 | Template:STN | 高田 | 10.3 | Kōhoku-ku | |
| G09 | Template:STN | 日吉本町 | 11.6 | ||
| G10 | Template:STN | 日吉 | 13.0 | Template:Plainlist |
Rolling stock
The Green Line is operated by 17 4-car 10000 series EMUs. In 2018, it was announced that 10 of these would be lengthened to six cars each by 2024 as a measure to ease overcrowding on the Green Line.[2] By April 2023, lengthening of 4-car trains to 6-car trains had commenced, and by the end of fiscal year 2024, there will be 10 x 6-car trains.[3][4]
References
- Japan Railfan Magazine, January 2008 issue (Vol 48, No. 561), p62-63
<templatestyles src="Reflist/styles.css" />
Script error: No such module "Check for unknown parameters".
External links
Script error: No such module "navbox".