Yizhuang line

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Script error: No such module "For".

Script error: No such module "infobox".Script error: No such module "Check for unknown parameters". The Yizhuang Line of the Beijing Subway (Template:Zh) is a rapid transit line that connects the Yizhuang Development Area with Beijing's subway network. The line is Script error: No such module "convert". long with 14 stations, including six underground and eight elevated.[1] It runs from Songjiazhuang in Fengtai District to Yizhuang Railway Station in Tongzhou District and passes through the southern Chaoyang and northern Daxing Districts.[2] Total investment for the line was estimated at ¥1.2 billion.[1] Construction began on December 8, 2007[3] and the line opened on December 30, 2010.[1] Yizhuang line's color is magenta.

Template:Rapid transit OSM map

List of stations

Station Name Connections Nearby Bus Stops Distance
kmScript error: No such module "Check for unknown parameters".[4]
Location
EnglishScript error: No such module "Check for unknown parameters". ChineseScript error: No such module "Check for unknown parameters".
Template:Stl Script error: No such module "Lang". Template:Rint Template:Rint 2 39 84 139 141 366 511 524 526 555 576 581 990 快速直达专线116 快速直达专线211 夜28 专62 专189Script error: No such module "Check for unknown parameters". 0.000 0.000 Fengtai
Template:Stl Script error: No such module "Lang". 25 93 128 400 400快 602 665 680 820 821 985 990 快速直达专线13 快速直达专线182 夜23 专196Script error: No such module "Check for unknown parameters". 2.631 2.631 Chaoyang
Template:Stl Script error: No such module "Lang". 352 985 专196Script error: No such module "Check for unknown parameters". 1.275 3.906
Template:Stl Script error: No such module "Lang". 599 685 825 926 997 兴15 兴42 兴72 兴73 兴75 兴76 专25Script error: No such module "Check for unknown parameters". 2.366 6.272 Daxing
Template:Stl Script error: No such module "Lang". 492 599 652 665 685 821 846 927 997 快速直达专线120 快速直达专线188 兴15 兴42 兴72 兴76Script error: No such module "Check for unknown parameters". 1.982 8.254
Template:Stl Script error: No such module "Lang". 快速直达专线13 专181Script error: No such module "Check for unknown parameters". 0.993 9.247
Template:Stl Script error: No such module "Lang". 324 492 652 821 927 975 976 快速直达专线120 T66 兴15Script error: No such module "Check for unknown parameters". 1.728 10.975
Template:Stl Script error: No such module "Lang". 492 523 652 665 846 快速直达专线120 快速直达专线188 兴15 兴76 兴78 专185Script error: No such module "Check for unknown parameters". 1.090 12.065
Template:Stl Script error: No such module "Lang". Template:Rint 324 453 542 578 580 652 665 826 846 913 快速直达专线1 快速直达专线120 快速直达专线188 T31 T63 兴16 兴32 兴38 兴43 兴47 兴48 兴49 兴50 兴51 兴56 兴58 兴76 兴78 专41 专96 专181 专183 专184 专185 专187 专188Script error: No such module "Check for unknown parameters". 1.355 13.420
Template:Stl Script error: No such module "Lang". 542 821 846 927 975 976 913 快速直达专线166 T12 T28 T54 T63 T66 T67 T69 兴32 兴43 兴51 兴58 专41 专96 专184 专188Script error: No such module "Check for unknown parameters". 2.337 15.757 Tongzhou
Template:Stl Script error: No such module "Lang". 523 快速直达专线166 T28 T29 T56 T68 T68区 T87 专47 专159 专182 专184 专188 专232Script error: No such module "Check for unknown parameters". 2.301 18.058
Template:Stl Script error: No such module "Lang". 专207Script error: No such module "Check for unknown parameters". 2.055 20.113
Template:Stl Script error: No such module "Lang". Template:Rint 637 820 986 T11 T56 T87 专159 专207Script error: No such module "Check for unknown parameters". 1.281 21.394
Template:Stl Script error: No such module "Lang". 913 T110 专232Script error: No such module "Check for unknown parameters". 1.334[4] 22.728

History

Segment Commencement Length Station(s) Name
Songjiazhuang — Ciqu 30 December 2010 Script error: No such module "convert". 13 (initial phase)
Ciqu — Yizhuang Railway Station 30 December 2018 Script error: No such module "convert". 1 one-station extension

Accidents and Incidents

On March 26, 2015, train YZ021 was testing when it derailed around Taihu. No passengers were on board and the driver faced leg injuries.[5][6][7]

Future development

In 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022–2027) announced to reform the connection tracks between Yizhuang line, the line 5 and the line 10, so that trains of Yizhuang line can operate through trains with lines 5 and 10. It will require a maximum of Template:Cvt new tracks near Songjiazhuang train depot, between Songjiazhuang stations of Yizhuang line and line 5, and Chengshousi station of line 10, it will also require to rebuild 0.5 km tracks for train storages within Songjiazhuang depot.[8]

Rolling Stock

Model Image Manufacturer Year Built Amount in Service Fleet Numbers Depot
DKZ32 File:YZ014 at Rongchang Dongjie Station.jpg CRRC Changchun Railway Vehicles 2010 23 YZ 001–YZ 023 Songjiazhuang
Taihu
CED5001 File:YZ024 entering Rongchang Dongjie (20241212085305).jpg Beijing CRRC Changke Erqi 2023 4 YZ 024–YZ 027

References

  1. a b c Script error: No such module "citation/CS1".
  2. (Chinese) Yizhuang Line Information Page BII Template:Webarchive
  3. Script error: No such module "citation/CS1".
  4. a b Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".

Template:Sister project Template:Beijing transit Template:Beijing Subway Station