Wigan Junction Railways
Template:Short description Script error: No such module "Unsubst". Template:Use British English Script error: No such module "infobox".Script error: No such module "Check for unknown parameters". Template:Wigan Junction Railway
The Wigan Junction Railways connected Glazebrook West Junction with the Lancashire Coalfields at Wigan.
History
Template:Short descriptionScript error: No such module "Infobox".Script error: No such module "Check for unknown parameters". The Wigan Junction Railways (WJR) was incorporated on 16 July 1874.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". The Company`s first chairman was Nathaniel Eckersley (1815-1892).[1] It was to link the coalfields around Wigan with the Cheshire Lines Committee (CLC) line at Glazebrook,Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". on the line between Liverpool Central and Manchester Central.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". Promoted by local businessmen, it came to the interest of the board of the Manchester, Sheffield and Lincolnshire Railway (MSLR) which suggested that it might become an extension of the CLC, in which the MSLR had a one-third share.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". However, of the MSLR's other two joint partners in the CLC, the Midland Railway (MR) were in favour, whereas the Great Northern Railway (GNR) were not. Accordingly, the MSLR and MR decided that its construction should be supported by both companies, and later on be formally added to the Sheffield and Midland Railway Companies' Committee (SMRCC), a body which was owned jointly by the MSLR and MR only.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
Construction began on 27 October 1876, the first sod being cut by the Home Secretary, the Rt. Hon. R. A. Cross,Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". who was also MP for South West Lancashire.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". The line was opened between Glazebrook and Strangeways for goods on 16 October 1879, and was extended to Wigan on 1 April 1884; passenger services also began on 1 April 1884.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". The trains were provided by the MSLR.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". Wigan Central railway station was opened on 3 October 1892.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
On 22 July 1885, the St. Helens and Wigan Junction Railway was incorporated to construct a branch to St Helens from the WJR at Lowton St. Marys:Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". This company was renamed in July 1889 the Liverpool, St Helens and South Lancashire Railway (LSHSL); The line was opened on 2 January 1900.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
The CLC constructed a curve from their line at Dam Lane Junction to the WJR line at Glazebrook Moss Junction; known as Glazebrook West Curve. Script error: No such module "convert". in length, it was authorised on 25 May 1900 and opened on 1 July 1900, creating a triangular junction at Glazebrook; by this means, trains from Wigan (and also St. Helens) could run to Warrington and Liverpool Central.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
On 4 August 1905 the GCR was authorised to absorb both the WJR and the LSHSL, which was formally carried out on 1 January 1906.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
Route
- Wigan Central
- Lower Ince[2]
- Hindley South
- Bickershaw and Abram[3]
- West Leigh and Bedford[4]
- Lowton St Mary's[5]
- Culcheth
- Newchurch Halt
- Glazebrook
In April 1884, there were seven trains in each direction per day, all running between Manchester Central and Wigan. Six of them called at all stations between Glazebrook and Wigan, and some also called at Urmston, Flixton and Irlam. There were two expresses: the 10:40 from Manchester reached Wigan at 11:15, calling only at Glazebrook; and the 12:00 from Wigan, which ran non-stop to Manchester in half an hour. The Sunday service was of just two trains in each direction, calling at Urmston, Flixton, Irlam and all stations between Glazebrook and Wigan.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
In the 1970s, part of the trackbed was converted to Culcheth Linear Park.
Future
In 2009 ATOC identified the south part of the line connecting Glazebrook with the Chat Moss line as a feasible link line for freight use.Template:ATOCConnectingCommunitiesReportS10
Notes
<templatestyles src="Reflist/styles.css" />
Script error: No such module "Check for unknown parameters".
References
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".