Wells Dam
Template:Use mdy dates Script error: No such module "Type in location".Script error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters".Template:Main other
Wells Dam is a hydroelectric embankment dam located on the Columbia River, downstream from the confluence of the Okanogan River, Methow River, and the Columbia River in Washington state. The dam, associated structures, and machinery make up the Wells Hydroelectric Project. It is owned and operated by Douglas County Public Utility District.
It has produced electricity since August 22, 1967. Its operating license from the US Federal Energy Regulatory Commission is next up for renewal in 2052.[1] The Wells project has ten generating units rated at a combined 840 megawatts.[2] In addition to the Douglas County and Okanogan County public utility districts, the project provides electricity to Puget Sound Energy, Portland General Electric, PacifiCorp, Avista Corporation,[3] and the Confederated Tribes of the Colville Reservation.[4]
Its reservoir is named Lake Pateros. Just below and adjacent is Carpenter Island boat launch and fish hatchery river access. Lake Pateros is not deep but a high volume of water moves through it. Thus, low-head, high-volume Kaplan turbine runners drive generation.[5]
See also
<templatestyles src="Stack/styles.css"/>
Script error: No such module "Check for unknown parameters".
References
Template:Columbia River dams Script error: No such module "Navbox".
- Pages with script errors
- Pages with broken file links
- Buildings and structures in Chelan County, Washington
- Dams on the Columbia River
- Dams in Washington (state)
- Buildings and structures in Douglas County, Washington
- Hydroelectric power plants in Washington (state)
- United States local public utility dams
- Dams completed in 1967
- Energy infrastructure completed in 1967
- Gravity dams
- 1967 establishments in Washington (state)