Wavertree Technology Park railway station
Template:Short description Template:Use dmy dates Template:Use British English Script error: No such module "Infobox".Template:Template otherScript error: No such module "Parameter validation".Script error: No such module "Check for unknown parameters".Script error: No such module "check for deprecated parameters".
Wavertree Technology Park railway station is in the suburbs of Liverpool, at the western end of Olive Mount cutting, on the original Liverpool-Manchester line. The station opened on 13 August 2000,[1] at a cost of £2 million. Train services are operated by Northern Trains.
Since 5 March 2015, trains through the station have used overhead wire electric traction,[2] as part of the electrification of George Stephenson's original Liverpool and Manchester Railway and the branch line to Wigan.
Facilities
The station has a ticket office (located on the bridge above the platforms) that is staffed throughout the hours of service, seven days per week (05:15 - midnight Monday to Saturday, 08:00 - 23:45 Sunday). Waiting shelters are provided at platform level on each side, with digital display screens, customer help points and an automated public address system to provide train running information. Both platforms have lifts from the footbridge (which has ramped access from the main entrance and car park), so are fully accessible for mobility-impaired users.[3]
Services
There are three trains per hour in each direction Monday to Saturday, with two on Sunday. All services are operated by Northern Trains:[4]
Eastbound
- 1tph to Manchester Airport via Template:Rws (extended to Template:Rws on Sundays)
- 2tph to Wigan North Western (on Sundays, 1tph runs on this route to Template:Rws)
In peak times, some additional services run between Template:Rws and Template:Rws. Fast services to the Airport and regular locals to Victoria both ended at the May 2018 timetable change. This timetable change was also when TransPennine Express introduced Liverpool-North East services, which run via Manchester Victoria. These pass through the station without stopping.
Westbound
- Three trains per hour to Liverpool Lime Street (two trains per hour on Sundays)
All of these call at Template:Rws on weekdays; on Sundays all run non-stop to Lime Street.
Gallery
-
The station during the evening.
-
A Northern Rail Class 156 waits at the station.
-
The view towards the Olive Mount cutting.
-
Platform information and signage.
References
<templatestyles src="Reflist/styles.css" />
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Wavertree Technology Park station facilities National Rail Enquiries; Retrieved 11-01-2017
- ↑ Template:NRtimes
Script error: No such module "Check for unknown parameters".
External links
- Train times and station information for Wavertree Technology Park railway station from National Rail
| Preceding station | National Rail National Rail | Following station | ||
|---|---|---|---|---|
| Northern Trains | ||||
| Northern Trains | ||||
Template:Merseytravel City Line Template:Merseyside railway stations
Script error: No such module "Coordinates".
- Pages with script errors
- Pages with broken file links
- Articles using Infobox station with markup inside name
- Articles using Infobox station with links or images inside name
- Pages with no open date in Infobox station
- Railway stations in Liverpool
- DfT Category F1 stations
- Railway stations opened by Railtrack
- Railway stations in Great Britain opened in 2000
- Railway stations served by Northern