Suvarnabhumi Airport

From Wikipedia, the free encyclopedia
(Redirected from VTBS)
Jump to navigation Jump to search

Template:Short description Script error: No such module "redirect hatnote". Template:Use dmy dates Template:Infobox airport

Suvarnabhumi Airport (Template:Comma separated entries)[1][2] is the main international airport serving Bangkok, the capital city of Thailand.[3][4] Located mostly in Racha Thewa commune, Bang Phli district, Samut Prakan province, it covers an area of Template:Convert, making it one of the biggest international airports in Southeast Asia and a regional hub for aviation. The airport is also a major Cargo Air Freight Hub (20th busiest in 2019), which has a designated Airport Free Zone, as well as road links to the Eastern Economic Corridor (EEC) on Motorway 7.[5]

Etymology

The name Suvarnabhumi is Sanskrit for "land of gold" (Devanagari:सुवर्णभूमि IAST: Suvarṇabhūmi; Suvarṇa[6] is "gold", Bhūmi[7] is 'land'; literally "golden land"). The name was chosen by King Bhumibol Adulyadej whose name includes Bhūmi, referring to the Buddhist golden kingdom, thought to have been to the east of the Ganges, possibly somewhere in Southeast Asia. In Thailand, government proclamations and national museums insist that Suvarnabhumi was somewhere on the coast of the central plains, near the ancient city of U Thong, which might be the origin of the Indianised Dvaravati culture.[8] Although the claims have not been substantiated, the Thai government named the new Bangkok airport Suvarnabhumi Airport, in celebration of this tradition.

History

File:Thai Airways International Airbus A340-541 (HS-TLA) at Suvarnabhumi International Airport.jpg
A Thai Airbus A340-500 (HS-TLA, Chiang Kham) at Suvarnabhumi Airport in 2008
File:HS-CPG (34341093312).jpg
A Siamland flying service (HS-CPG) smallest plane International Passengers[9][10] operations at Suvarnabhumi

The airport is currently the main hub for Thai Airways International and Bangkok Airways, as well as the operating base for Thai VietJet Air and Thai AirAsia. It also serves as a regional gateway and connecting point for various foreign carriers connecting to Asia, Oceania, Europe, and Africa.

Suvarnabhumi was officially opened for limited domestic flight service on 15 September 2006, and opened for most domestic and all international commercial flights on 28 September 2006.[11]

The airport is on what had formerly been known as Nong Nguhao (Template:Literal translation) in Racha Thewa in Bang Phli, Samut Prakan province, as well as the districts of Bang Kapi, Lat Krabang, Bang Na, and Prawet in the eastern side of Bangkok, about Template:Convert from downtown. The terminal building was designed by Helmut Jahn of Murphy/Jahn Architects. It was constructed primarily by ITO JV. The airport had the world's tallest free-standing control tower (Template:Convert) from 2006 to 2014[12] and for a time held the title for the world's fourth largest single-building airport terminal (Template:Convert).

Suvarnabhumi is the 17th busiest airport in the world,[13] eleventh busiest airport in Asia, and the busiest in the country, having handled 60 million passengers in 2017,[13] and is also a major air cargo hub, with a total of 95 airlines. On social networks, Suvarnabhumi was the world's most popular site for taking Instagram photographs in 2012.[14]

Suvarnabhumi was reassigned the IATA airport code, BKK, from Don Mueang after that airport ceased international commercial flights. Motorway 7 connects the airport, Bangkok, and the heavily industrial eastern seaboard of Thailand, where most export manufacturing takes place.

File:Bangkok - Suvarnabhumi International (BKK - VTBS) AN1907895.jpg
Check-in hall at Suvarnabhumi Airport, seen from the upper level

During the COVID-19 pandemic, the airport was temporarily converted to a hospital[15] and vaccination center.[16]

File:Aeroport de Bangkok.jpg
Check-in hall in night seen at Suvarnabhumi Airport
File:Arts-in-SBIA01.jpg
Art pieces at Suvarnabhumi Airport

Land purchase, initial early phase of construction

The need for the new airport was recognized in 1973 when Template:Convert of land was purchased Template:Convert east of Bangkok. The site, known as Cobra Swamp, was drained and named Suvarnabhumi, meaning "realm of gold".Script error: No such module "Unsubst". On 14 October 1973, student-led protests led to the overthrow of the military government of Prime Minister Thanom Kittikachorn and the project was shelved.Script error: No such module "Unsubst".

"The Japanese government would end up assisting the new airport project as ODA, and in 1996, the project took a step forward with the signing of a loan agreement between the Government of Thailand and the Japanese government. Then, in 1996, Second Bangkok International Airport Company Ltd. (SBIA) was established as the project implementation organization, and the project got underway."[17]

It was scheduled to finish by 2000.[17]

Airport tests and official opening

The airport was due to open in late 2004. Still, a series of budget overruns, construction flaws, and allegations of corruption plagued the project.

A further delay was caused by the discovery that the airport had been built over an old graveyard. Superstitious construction workers claimed to have seen ghosts there. On 23 September 2005, the Thai airport authority held a ceremony where 99 Buddhist monks chanted to appease the spirits.[18]

Full tests of the airport took place on 3 and 29 July 2006. Six local airlines — Thai Airways International, Nok Air, Thai AirAsia, Bangkok Airways, PBair, and One-Two-Go Airlines — used the airport as a base for twenty domestic flights.[19][20] The first international test flights were conducted on 1 September 2006. Two Thai Airways aircraft, a Boeing 747-400 and an Airbus A300-600, simultaneously departed the airport at 09:19 to Singapore and Hong Kong respectively. At 15:50 the same aircraft flew back and made simultaneous touchdowns on runways 19L and 19R. These test flights demonstrated the readiness of the airport to handle traffic.Script error: No such module "Unsubst".

On 15 September 2006, the airport started limited daily operations with Jetstar Asia operating three Singapore to Bangkok flights. Bangkok Airways moved to the airport on 21 September. AirAsia and Thai AirAsia followed on 25 September and on 26 September Nok Air moved to Suvarnabhumi Airport. During this initial phase, as well as in the previous tests, the airport used the temporary IATA code NBK.Script error: No such module "Unsubst".

Suvarnabhumi officially opened at 03:00 on 28 September 2006, taking over all flights from Don Mueang. The first flight to arrive was a Lufthansa Cargo flight LH8442 from Mumbai at 03:05.[21] The first commercial arrival was Japan Airlines at 03:30. The first passenger arrival was Aerosvit flight VV171 from Kyiv at 04:30, and the first cargo departure was Saudi Arabian Airlines flight SV-984 to Riyadh at 05:00.[22] Aerosvit also had the first passenger departure (VV172 to Kyiv) around 05:30.[23]

Initial difficulties

Difficulties were reported in the first few days of the airport's operation. On the first day alone, sluggish luggage handling was common—the first passenger arrival by Aerosvit took an hour for the luggage to start coming out, and some flights did not have their luggage coming out even after four hours. Flights were delayed (Thai Airways claimed that 17 of 19 flights were delayed that day), and there were failures with the check-in system.[24][25] Subsequent problems included the failure of the cargo computer system, and the departure boards displaying the wrong information, resulting in confused passengers (unlike Don Mueang, there were no "final calls" issued).[26]

Months after its opening, issues of congestion, construction quality, signage, provision of facilities, and soil subsidence continued to plague the project, prompting calls to reopen Don Mueang to allow for repairs to be made.[27] Expert opinions varied widely on the extent of Suvarnabhumi's problems as well as their root cause. Most airlines stated that damage to the airport was minimal.[28][29] Then Prime Minister Surayud Chulanont reopened Don Mueang for domestic flights voluntarily on 16 February 2007, with 71 weekly flights moved back initially, but no international flights.[30]

Capacity and safety issues

Tarmac problems

In January 2007, ruts were discovered in the runways at Suvarnabhumi.[31] The east runway was scheduled to close for repairs. Expert opinions varied as to the cause of the ruts.[28] Airport authorities and airline representatives maintained that the airport was still safe and resisted suggestions that the airport should be completely closed and all flights moved back to Don Mueang.[32]

On 27 January 2007, the Department of Civil Aviation declined to renew the airport's safety certificate, which had expired the previous day. The ICAO requires that international airports hold aerodrome safety certificates, but Suvarnabhumi continued to operate because the ICAO requirement had yet to be adopted as part of Thai law.[33]

As of early 2016, tarmac problems persisted at Suvarnabhumi. Soft spots on the tarmac, taxiways, and apron area had not been permanently fixed. Aircraft were getting stuck on the soft surfaces that are the result of sub-standard materials. "The constant resurfacing of the tarmac, taxiways and apron area with asphalt is an unacceptable patchwork solution. We literally need a "concrete" solution", said Tony Tyler, IATA's director general and CEO.[34]

Plans to re-open Don Mueang for domestic flights

File:VTBS-Tower.JPG
Airport traffic control tower (ATCT) at Suvarnabhumi Airport. At 132.2 meters, it is the world's third tallest ATC tower[35]

In January 2007, Thai Airways announced a plan to move some of its domestic operations back to Don Mueang International Airport due to overcrowding. Three days later, the Ministry of Transport recommended temporarily reopening Don Mueang while repair work on the runways at Suvarnabhumi proceeded. At that time, Thai Airways said it would shift most of its domestic flights back to Don Mueang while keeping flights with high international passenger connections such as Chiang Mai and Phuket at Suvarnabhumi. On 28 March 2009, Thai Airways discontinued all domestic flights from Don Mueang. Bangkok Airways and One-Two-GO Airlines had similar plans, but Bangkok Airways remained at Suvarnabhumi. Thai AirAsia said it would not move unless it could shift both its international and domestic operations, prompting them to stay at Suvarnabhumi for the time being. Nok Air and PBair were undecided, but Nok Air later relocated all flights to Don Mueang, where they operate today.[36][37] As of January 2010, only Nok Air and One-Two-GO operated domestic flights from Don Mueang Airport. PBair have ceased operations altogether. One-Two-GO was integrated into Orient Thai Airlines in July 2010, but continued to operate from Don Mueang Airport until liquidation in 2018. As of 1 October 2012, Air Asia has moved all of its Bangkok operations to Don Mueang International Airport (DMK) from Suvarnabhumi Airport (BKK).[38]

Repair and upgrades

Airports of Thailand found that the cost of fixing 60 identified problems at the airport would be less than one percent of the total airline cost and the problems could be fixed in four to five years. Dr Narupol Chaiyut, a member of a committee overseeing service problems at the new airport, estimated that 70 percent of the problems would be fixed in 2007. Twenty of the 60 problems were successfully fixed by February 2007.[39]

Architectural design

File:Suvarnabhumi Airport tug-of-war art.jpg
A depiction of the "Churning of the Ocean of Milk", Samudra manthana, at the airport
File:Suvarnabhumi architecture (31108307925).jpg
Concourse Design: 5-pin arch-truss-girders with glazed facades and a translucent fabric membrane set-up, spanning across to bridge the 27 m spacing between the glass facades

Suvarnabhumi Airport's main terminal roof is designed with structural elements and bays placed in a cantilevered, wavelike form to appear to "float" over the concourse beneath. This overall design principle was to express the former essence of the site, from which water had to be drained before construction could begin. The eight composite 2,710-ton trusses supporting the canopy of the main terminal are essentially diagrams of the bending moments acting on them, with the greatest depth at mid-span and over the supports.[40]

The result of Helmut Jahn's vision is a structure with performance materials serve in their total composition and in use more than in their conventional roles. This maximizes daylight use in comfort with substantial energy life-cycle cost savings. The installed cooling system reduced up to 50 percent compared to a conventional system. A translucent membrane with three layers was developed to mediate between the interior and exterior climate, dealing with noise and temperature transmission, while still allowing natural flow of daylight into building along with views of greenery outside.[41]

Airport ranking

The airport was ranked number 48 among the world's top 100 airports in 2020. Other ASEAN airports in 2020 were ranked: Changi Airport, 1; Kuala Lumpur International Airport, 63; Jakarta–Soekarno-Hatta, 35; Hanoi, 87.[42] Suvarnabhumi was ranked 46 in 2019,[43] 38 in 2017[44] and 36 in 2016.[45] According to the Thailand Development Research Institute (TDRI) in 2018, the airport's ranking had not improved over the past six years. Customer complaints included lengthy immigration waiting times, transit day room issues, insufficient numbers of chairs and phone charging points, insufficient English-speaking staff, and poor information displays.[46][47]

As of 18 April 2024, the airport was ranked 58th by the Skytrax World Airport Awards 2024.[48][49][50]

Events

  • On 25 January 2007, due to work upgrading the taxiways which suffered from small cracks, a few incoming flights were delayed and several flights were safely diverted to U-Tapao International Airport in Rayong Province.[51]
  • On 26 November 2008, an illegal occupation of the airport took place by People's Alliance for Democracy, closing the departure lounge and blocking exits and leaving almost 3,000 passengers stranded in the main terminal and another 350,000 stranded inside the country, as all flights were grounded. The People's Alliance for Democracy seized the control tower at 12:00.[52] On 2 December 2008, protesters agreed to leave the airport as they had been illegally protesting and permitted the resumption of flights. Security checks, clean-ups, and re-certification once the illegal occupation ended delayed the airport from being fully functional until 5 December 2008.[53]
  • On 5 January 2019, the airport gained international attention when a Saudi Arabian ex-Muslim, Rahaf Mohammed, fleeing an abusive family that punished children who did not follow their religion, was accosted by Thai authorities at the behest of Saudi Arabia and sent to one of the airport's hotels to await repatriation back to her family and country. Fearing that she could be killed for being a disgrace to her family and religion, she barricaded herself in the hotel room, opened a Twitter account to plead for her freedom, and requested assistance from United Nations agents to get her to the Western world, away from her family, as a resettled refugee. As her pleas for help went viral, Thai agents agreed to let her go to Canada to start a new life without Islam.[54]
  • In January 2021, a motorist drove his car through security gates and onto the tarmac at the airport while it was in use. It was later revealed that the driver had been under the influence of methamphetamine, which was also discovered in the trunk of the car. The driver claimed that he had taken a wrong turn.[55][56]
  • 31 January 2025. Emirates Airline open emirates lounge on 4 floor SAT-1 (Satellite 1 Terminal) it's the largest outside of Dubai and is located in the 4 floor Satellite 1 Terminal (SAT-1) [57]

Predatory irregularities

Petty thieves and confidence men, the majority of them illegal taxi drivers or tour guides, are known to prey on tourists in the arrival hall. They belong to politically well connected criminal groups: Kamnan Samruay, Boonruang Srisang, Sak Pakphanang, the Pattaya Mafia and Phuyai Daeng.[58] Evicting them has proved difficult as they allegedly are well connected. (The head of the Pirap gang is supposedly related to an Airports of Thailand executive, while the Phuyai Daeng has ties to influential civil servants in Samut Prakan.[58])

On 1 October 2010, two hundred armed men occupied the airport's parking area for an hour, blocking the building's entrances and seizing ticket booths to collect fares from motorists.[59] Airport security personnel failed to respond, reportedly because of an internal dispute within the parking management company, the firm contracted to run the parking facilities.[59]

Facilities

Airport terminal

Costing an estimated 155 billion baht (US$5 billion), the airport has three parallel runways (60 m wide, 4,000 m and 3,700 m long) and two parallel taxiways to accommodate simultaneous departures and arrivals.[60] It has a total of 120 parking bays (51 with contact gates and 69 remote gates), with five of these capable of accommodating the Airbus A380. Suvarnabhumi Airport has 72 jet bridges and 69 non-jet bridges. Additionally, flights are able to park at remote locations on the ramp, from which airport buses transport passengers to and from the terminal. Suvarnabhumi Airport has 18 jet bridges and 6 non-jet bridges for Airbus A380.Script error: No such module "Unsubst".

The airport's first two runways can accommodate 64 flights per hour. At peak times the runways average 63 flights per hour. In April 2019 the Thai cabinet approved a sum of 21.8 billion baht for the construction of a third runway. Construction was originally planned to start in 2019 and was completed in 2024 due to delays. The third runway (in phased trials) will accommodate a maximum of 30 flights per hour.

The main passenger terminal building, with a capacity of handling 76 flight operations per hour, co-locates the international and domestic terminals, though assigning them to different parts of the concourse. In the initial phase of construction, it was capable of handling 45 million passengers and three million tonnes of cargo per year. The airport's main passenger terminal was, at the time of construction, the world's largest passenger terminal ever constructed in one phase at Template:Convert. The airport air-traffic control tower was the tallest in the world at Template:Convert from 2006 to 2014.[12]

From the opening of Suvarnabhumi in 2006 to early 2017, eight people had fallen to their deaths from upper-floor walkways, prompting the airport to spend 33 million baht in 2013 building glass barriers to prevent people from falling and/or taking their lives.[61]

Hotel

A 600-room hotel, now operated as Hyatt Regency, is located above the underground rail link station and in front of the main passenger terminal building. It originally opened in 2006 as Novotel, but was rebranded as Hyatt Regency in February 2025.

Expansion plans

File:Suvarnabhumi airport map 2023.svg
Suvarnabhumi Airport map based on OSM graphics, actualized up to mid-2023

By mid-2015, the airport was handling more than 800 flights per day, higher than its 600-flight capacity. It has exceeded its capacity of 45 million passengers per year.[62]

Airports of Thailand (AOT) approved an investment budget for the expansion of Suvarnabhumi Airport and construction was expected to be completed by April 2023.[63] The plan was to strengthen Suvarnabhumi Airport's position as a regional aviation hub. Phase Two would raise the airport's capacity to 65 million passengers a year and would be undertaken in parallel with the construction of a new domestic terminal.[64] The new domestic terminal will be intended to accommodate more than 30 million passengers annually by 2027.[65]

The two expansion projects are part of the overall airport enlargement that would see Suvarnabhumi raise its annual passenger handling capacity to 125 million passengers, 90 million international and 35 million domestic passengers by 2024 at an estimated cost of 163 billion baht (US$5.25 billion/€3.62 billion). The expansion includes the construction of one additional runway of Template:Convert, subsequent enlargement of domestic and international terminals, and improvements to parking bays, car parks, and other airport infrastructure.[66]

In March 2024 Prime Minister Srettha Thavisin said the third runway would open in October 2024, with a long-term target capacity of 150 million passengers.[67] The runway was opened for full aircraft operations on 1 November 2024, increasing the operational capacity from 68 to 94 flights/hour.[68]

Midfield Satellite Concourse 1 (SAT-1)

Script error: No such module "Labelled list hatnote". A new midfield concourse called SAT-1 partially opened in September 2023[69] and is expected to fully open from early 2024.[70] It is linked to the current main terminal via an underground automated people mover (APM) system. The new people mover was provided by Siemens using the NeoVAL technology.[71] The new satellite terminal has a total of 28 gates, with eight for the Airbus A380 and Boeing 747-8[72] super jumbo jet.[73] Spanning around 251,400 square meters, it will increase the airport's annual passenger handling capacity from 45 million to 60 million.[72] The SAT-1 terminal was nominated as one of six airport terminals for the Prix Versailles World's Most Beautiful Airports Architectural Award for 2024, which was announced at UNESCO.[74][75]

Future Expansion Projects (2025 onwards)

On October 29, 2024, it was reported that Airports of Thailand Public Company Limited (AOT) revised Suvarnabhumi's masterplan for expansion. The revision included cancelling a planned second Midfield Satellite Concourse (which would have been south of the existing satellite concourse) in favor of a massive new terminal on the airport's southern end. AOT made the revision due to fears that a second Midfield Satellite Concourse would not be enough to meet future demand. The new South Terminal will cost 120 billion baht ($3.7 billion USD) and have a capacity of 70 million passengers annually. It is set to open by the end of 2031. Alongside the new South Terminal, AOT is also planning the east terminal expansion project, which will add 81,000 square meters of space for passengers. Lastly, AOT has confirmed a fourth runway to be constructed east of Runway 1/19. The new runway will cost 20 billion baht ($615 million USD) and will be at least 12,000 feet in length, similar to the other runways at Suvarnabhumi. Bidding for contracts for the fourth runway is set to open in 2027, likely meaning that the runway will be completed alongside the new South Terminal. When fully complete, these projects will allow Suvarnabhumi Airport to serve 150 million passengers every year.[76]

Airlines and destinations

Passenger

Template:Airport destination list

Cargo

Template:Airport destination list

Passenger traffic and statistics

Busiest international routes

Pre-COVID 19

Top 20 busiest international and domestic routes to and from Suvarnabhumi Airport by passenger volume (2019)[77]
Rank Airport Passengers
handled 2019
% change
2018/19
1 Template:Flagicon Hong Kong 3,756,449 Decrease 6.57
2 Template:Flagicon Phuket 3,358,876 Increase 0.03
3 Template:Flagicon Singapore 3,258,422 Increase 3.04
4 Template:Flagicon Chiang Mai 2,864,525 Decrease 1.61
5 Template:Flagicon Seoul–Incheon 2,689,306 Increase 4.93
6 Template:Flagicon Taipei–Taoyuan 1,928,536 Increase 3.58
7 Template:Flagicon Dubai–International 1,707,276 Decrease 11.82
8 Template:Flagicon Shanghai–Pudong 1,600,930 Increase 7.18
9 Template:Flagicon Samui 1,546,570 Decrease 8.22
10 Template:Flagicon Guangzhou–Baiyun 1,510,461 Increase 8.96
11 Template:Flagicon Ho Chi Minh City 1,238,942 Increase 2.52
12 Template:Flagicon Tokyo–Haneda 1,230,506 Increase 9.81
13 Template:Flagicon Manila 1,179,861 Increase 17.34
14 Template:Flagicon Doha 1,166,972 Increase 13.66
15 Template:Flagicon New Delhi 1,107,099 Increase 2.01
16 Template:Flagicon Tokyo-Narita 1,089,048 Decrease 8.70
17 Template:Flagicon Kuala Lumpur 1,078,045 Decrease 5.26
18 Template:Flagicon Phnom Penh 976,966 Increase 26.52
19 Template:Flagicon Beijing 956,320 Increase 0.51
20 Template:Flagicon Krabi 929,294 Increase 12.46

COVID-19 pandemic

Top 20 busiest international routes and domestic routes to and from Suvarnabhumi Airport by passenger volume (2023)[78][79]
Rank Airport Passengers handled 2023 % change
2022/23
1 Template:Flagicon Phuket 2,916,880 Increase 19.20
2 Template:Flagicon Seoul–Incheon 2,891,717 Increase 129.68
3 Template:Flagicon Singapore 2,838,693 Increase 19.20
4 Template:Flagicon Hong Kong 2,688,822 Increase 397.64
5 Template:Flagicon Chiang Mai 2,383,102 Increase 7.55
6 Template:Flagicon Taipei-Taoyuan 1,963,084 Increase 364.57
7 Template:Flagicon Samui 1,653,028 Increase 74.31
8 Template:Flagicon Dubai–International 1,398,078 Increase 101.68
9 Template:Flagicon Tokyo–Narita 1,355,815 Increase 93.79
10 Template:Flagicon Ho Chi Minh City 1,302,279 Increase 88.99
11 Template:Flagicon Doha 1,146,882 Increase 60.32
12 Template:Flagicon Phnom Penh 1,096,421 Increase 56.67
13 Template:Flagicon New Delhi–Indira Gandhi 1,008,263 Increase 53.75
14 Template:Flagicon Hanoi 968,508 Increase 127.38
15 Template:Flagicon Kuala Lumpur 965,222 Increase 82.28
16 Template:Flagicon Tokyo–Haneda 946,969 Increase 146.47
17 Template:Flagicon Manila 926,615 Increase 101.26
18 Template:Flagicon Krabi 796,900 Increase 29.64
19 Template:Flagicon Osaka-Kansai 774,562 Increase 428.36
20 Template:Flagicon Hat Yai 755,319 Decrease 24.62
Top 10 busiest international routes to and from Suvarnabhumi Airport by cargo volume (2019)[77]
Rank Airport Tons of cargo
handled 2019
% change
2018/19
1 Template:Flagicon Hong Kong 172,977 Decrease 13.50
2 Template:Flagicon Singapore 99,397 Decrease 9.29
3 Template:Flagicon Taipei–Taoyuan 92,475 Decrease 11.61
4 Template:Flagicon Tokyo–Narita 61,431 Decrease 15.68
5 Template:Flagicon Seoul–Incheon 50,125 Decrease 6.47
6 Template:Flagicon Doha 46,884 Increase 7.86
7 Template:Flagicon Shanghai–Pudong 39,479 Decrease 13.01
8 Template:Flagicon Tokyo–Haneda 39,042 Decrease 13.80
9 Template:Flagicon Dubai–International 27,479 Decrease 11.36
10 Template:Flagicon London–Heathrow 25,450 Decrease 9.44

Traffic by calendar year

Suvarnabhumi accounted for the largest share of air traffic at Thailand's airports in 2023, handling 51.7 million passengers in 2023, up by 80 percent from the previous year despite its passenger capacity of only 45 million a year.

Template:Airport-Statistics

Comparison of passenger volume, aircraft movements and cargo volume at Suvarnabhumi Airport, by year
Year Passengers Change from
previous year
Movements Cargo
(tons)
Notes
2007 41,210,881 1,220,001
2008 38,603,490 Decrease6.3251% 1,173,084
2009 40,500,224 Increase4.9133% 1,045,194
2010 42,784,967 Increase5.6413% 1,310,146
2011 47,910,744 Increase11.9803% 299,566
2012 53,002,328 Increase10.6272% 312,493 Airports Council International[80]
low-cost airlines moved

their hubs to DMK in October 2012

2013 51,363,451 Decrease3.0921% 288,004 1,236,223
2014 46,423,352 Decrease9.6179% 289,568 1,234,176
2015 52,902,110 Increase13.9558% 317,066 1,230,563 [81]
2016 55,892,428 Increase5.6530% 336,356 1,306,435 [82]
2017 60,860,704 Increase8.8884% 350,508 1,439,913 [83]
2018 63,379,077 Increase4.1379% 369,476 1,494,599 [84]
2019 65,425,879 Increase3.2294% 380,051 1,324,268 [85]
2020 16,706,235 Decrease74.4654% 152,614 904,362 [86]
2021 5,663,701 Decrease66.0983% 111,729 1,120,357 [87]
2022 28,754,350 Increase407.6954% 221,331 1,184,157 [88]
2023 51,699,104 Increase79.7957% 307,505 1,137,373 [89]
2024 62,234,693 Increase16.15% 357,181 1,388,272 [89]

Incidents and accidents

Ground transportation

Airport Rail Link (ARL)

Template:Excerpt

Bus

File:VTBS-Shuttle bus.JPG
Shuttle bus to Downtown Bangkok

A free bus service connecting Suvarnabhumi Airport and Don Mueang Airport operates from 05.00 until midnight. S1 bus route is an air-conditioned bus route operated by Bangkok Mass Transit Authority (BMTA). The route traverse between the airport and Sanam Luang, with stops around Democracy Monument and Lan Luang Road. There are also direct buses between the airports operated by an airport shuttle bus.

More buses route can be accessed at Suvarnabhumi Public Transport Center, the airport's main bus terminal.

Taxi

Level 1 (ground level) is where the public taxis are located. A ticket printed from the ticket queue machine (located on the same floor) is required before queuing up for a taxi.

Car

File:Suvarnabhumi Airport Terminal Building Departures Level.jpg
Departure dropoff curb

The airport has five main access routes. Among these the most convenient route is via the Bangkok Chon Buri Motorway (Motorway 7). Another main airport entrance is in Samut Prakan Province via the expressway from Bang Na to Bang Pakong.

The airport has seven different car park zones, with zones 2 and 3 having direct access to the departure/arrival terminal. Located northeast of the airport is the Longterm Car Park Zone, next to the Bus Terminal.

The airport has five entrance routes. The main route is via the motorway in the north of Bangkok, directly connecting Bangkok's downtown and Chonburi Province, the industrial and harbor city in eastern Thailand. However, another main airport entrance is in Samut Prakan Province, connecting an elevated highway in the south of Bangkok from Bang Na to Bang Pakong.

Sky Lane Cycle Track

File:Suvarnabhumi Sky Lane.jpg
Sky Lane at Suvarnabhumi Airport

In December 2015, Airports of Thailand introduced the Sky Lane (Template:Langx), a cycling track around the Suvarnabhumi airport perimeter. The entrance to the Sky Lane is located in the northeastern corner of the airport area. Cyclists can bring their bicycles and bike here for free. The Sky Lane is a controlled-access, one-direction, two-lane track built only for cycling, so the riders can be ensured that they will not be bothered by any vehicle. The Sky Lane's length is 23.5 km, making it the longest in Asia.[101] Sky Lane's facilities, which are specially designed for cyclists, include medical facilities, shops, food & beverage, track, parking lot and a rest area. The entrance gate is open from 06:00 to 18:00.[102] On 23 November 2018, King Vajiralongkorn presided over the official opening of cycling lane at Suvarnabhumi airport and denominated the track as Happy and Healthy Bike Lane (Template:Langx).[103]

References

Template:Reflist

External links

Template:Commons category-inline
Template:Wikivoyage inline

Template:Portal bar Template:Airports in Thailand Template:Authority control

  1. Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. Script error: No such module "citation/CS1".
  5. An Update on the Progress of the High-Speed Railway connecting Three Airports
  6. Script error: No such module "citation/CS1".
  7. Script error: No such module "citation/CS1".
  8. Damrong Rachanubhab, "History of Siam in the Period Antecedent to the Founding of Ayuddhya by King Phra Chao U Thong", Miscellaneous Articles: Written for the Journal of the Siam Society by His late Royal Highness Prince Damrong, Bangkok, 1962, pp. 49–88, p. 54; Promsak Jermsawatdi, Thai Art with Indian Influences, New Delhi, Abhinav Publications, 1979, pp. 16–24. William J. Gedney, "A Possible Early Thai Route to the Sea", Journal of the Siam Society, Volume 76, 1988, pp. 12–16. [1]
  9. HS-CPG Bangkok to Kuching 1 June 2025
  10. HS-CPG 20 May 2025
  11. "Bangkok's new airport opens to first commercial flights", USA Today, 15 September 2006.
  12. a b Script error: No such module "citation/CS1".
  13. a b Script error: No such module "citation/CS1".
  14. "Suvarnabhumi, Paragon top Instagram places list". Bangkok Post, 29 December 2012.
  15. Script error: No such module "citation/CS1".
  16. Script error: No such module "citation/CS1".
  17. a b Script error: No such module "citation/CS1".
  18. Richard Lloyd Parry, "Poo Ming – a blue ghost who haunts $4bn airport", The Times, 27 September 2006
  19. ThaiDay, "THAI discounts tickets for historic test flights", 1 July 2006.
  20. "PM Thaksin says Suvarnabhumi Airport ready in two months", MCOT, 29 July 2006. Template:Webarchive
  21. Pennapa Hongthong, Just listen to our noisy nightmare Template:Webarchive, The Nation, 28 September 2006
  22. Petchanet Pratruangkrai, Suchat Sritama, Exporters pan new export fees Template:Webarchive, The Nation, 27 September 2006
  23. Kurt Hofmann, LH Cargo set to be first into Suvarnabhumi, ATW, 28 September 2006 Template:Webarchive
  24. Suchat Sritma, Touch down...into chaos Template:Webarchive, 29 September 2006
  25. e-Travel Blackboard, Baggage ruffles up some feathers, but Suvarnabhumi still a success, 29 September 2006 Template:Webarchive
  26. The Nation, Airport shippers hit by computer failure Template:Webarchive, 2 October 2006
  27. Some flight services will likely return the Don Muang Airport, The Nation, 29 January 2007.
  28. a b The Nation, Engineers unable to agree on root cause of airport cracks Template:Webarchive, 10 February 2007
  29. The Nation, THAI baulks at moving to Don Muang, 15 February 2007
  30. Thailand backtracks on plan for second international airport, Channel NewsAsia, 16 February 2007 Template:Webarchive
  31. A Rough Takeoff for Bangkok's New Airport, Time, 25 January 2007
  32. New airport's east runway to close for repairs, return to Don Muang mooted, Thai News Agency, MCOT, 27 January 2007. Template:Webarchive
  33. "Bangkok airport officially unsafe", CNN, 27 January 2007 Template:Webarchive
  34. Script error: No such module "citation/CS1".
  35. Script error: No such module "citation/CS1".
  36. Use Don Muang during repairs: 2 airlines Template:Webarchive, The Nation, 27 January 2007.
  37. Move to use 2 airports gets mixed reception Template:Webarchive, The Nation, 31 January 2007.
  38. AirAsia moves to Don Mueang Airport (1 October 2012), Air Asia, 13 August 2012. Template:Webarchive
  39. B1bn needed to fix terminal problems over four to five years, Bangkok Post, 16 February 2007Template:Dead link
  40. Suvarnabhumi Airport, September 2008. University of Cincinnati. Template:Webarchive
  41. E-Architect, Suvarnabhumi Airport Bangkok, 15 August 2008
  42. Script error: No such module "citation/CS1".
  43. Script error: No such module "citation/CS1".
  44. Script error: No such module "citation/CS1".
  45. Script error: No such module "citation/CS1".
  46. Script error: No such module "citation/CS1".
  47. Script error: No such module "citation/CS1".
  48. Script error: No such module "citation/CS1".
  49. Script error: No such module "citation/CS1".
  50. Script error: No such module "citation/CS1".
  51. Script error: No such module "citation/CS1".
  52. Script error: No such module "citation/CS1".
  53. Script error: No such module "citation/CS1".
  54. Script error: No such module "citation/CS1".
  55. Script error: No such module "citation/CS1".
  56. Script error: No such module "citation/CS1".
  57. Emirates open its most expansive lounge second only to dubai at Bangkok-Suvarnabhumi
  58. a b "Crackdown fails to stop airport gangs". Bangkok Post 6 September 2009 Template:Webarchive
  59. a b "AoT orders firm to end dispute after car park seizure". Bangkok Post 2 October 2010
  60. New Bangkok Airport – Now Aiming For July 2006 Opening, 2005. Bangkok Post. Template:Webarchive
  61. Script error: No such module "citation/CS1".
  62. Script error: No such module "citation/CS1".
  63. Script error: No such module "citation/CS1".
  64. Script error: No such module "citation/CS1".
  65. Script error: No such module "citation/CS1".
  66. Script error: No such module "citation/CS1".
  67. Script error: No such module "citation/CS1".
  68. Script error: No such module "citation/CS1".
  69. Script error: No such module "citation/CS1".
  70. Script error: No such module "citation/CS1".
  71. Script error: No such module "citation/CS1".
  72. a b Script error: No such module "citation/CS1".
  73. Script error: No such module "citation/CS1".
  74. Script error: No such module "citation/CS1".
  75. Script error: No such module "citation/CS1".
  76. Script error: No such module "citation/CS1".
  77. a b Script error: No such module "citation/CS1".
  78. Script error: No such module "citation/CS1".
  79. Script error: No such module "citation/CS1".
  80. Script error: No such module "citation/CS1".
  81. Page6 2015 Air Traffic Report AOT
  82. 2016 Air Traffic Report AOT
  83. 2017 Air Traffic Report AOT
  84. 2018 Air Traffic Report AOT
  85. 2019 Air Traffic Report AOT
  86. 2020 Air Traffic Report AOT
  87. 2021 Air Traffic Report AOT
  88. 2022 Air Traffic Report AOT
  89. a b Script error: No such module "citation/CS1".
  90. Script error: No such module "citation/CS1".
  91. a b Script error: No such module "citation/CS1".
  92. Script error: No such module "citation/CS1".
  93. Script error: No such module "citation/CS1".
  94. Script error: No such module "citation/CS1".
  95. Script error: No such module "citation/CS1".
  96. Script error: No such module "citation/CS1".
  97. Script error: No such module "citation/CS1".
  98. Script error: No such module "citation/CS1".
  99. Script error: No such module "citation/CS1".
  100. Script error: No such module "citation/CS1".
  101. Script error: No such module "citation/CS1".
  102. Script error: No such module "citation/CS1".
  103. Script error: No such module "citation/CS1".