Upper Salmon Hydroelectric Development
Jump to navigation
Jump to search
Template:More citations needed The Upper Salmon Hydro Development is a hydroelectric plant in Newfoundland and Labrador. It utilises a portion of the residual head between Meelpaeg Lake Reservoir and Round Pond within the watershed of the Bay d'Espoir Hydroelectric Development.[1]
The plant operates at a normal supply level of 241 m under a net head of 51 metres. The average rated flow of 189.5 m3/s is used to generate 84 megawatts (MW) of electrical power with an average annual production of 541 GWh. The unit, which is equipped with a Francis turbine, was first synchronized on January 19, 1983.
References
Template:Newfoundland-struct-stub
Template:Canada-powerstation-stub
- ↑ Script error: No such module "citation/CS1".