Twitchell Reservoir

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Use mdy dates Script error: No such module "Infobox".Template:Template otherScript error: No such module "Infobox body of water tracking".Script error: No such module "Check for unknown parameters".

File:TwitchellDam.jpeg
Twitchell Dam and Reservoir
File:A230701 0014.JPG
Aerial: Twitchell Dam (top left)
File:B230701 0022.jpg
Aerial view: Twitchell Reservoir


Twitchell Reservoir is a reservoir in southern San Luis Obispo County and northern Santa Barbara County in California. The reservoir has a capacity of Script error: No such module "convert". and is formed by Twitchell Dam on the Cuyama River about Script error: No such module "convert". from its headwaters in the Chumash Wilderness Area. About Script error: No such module "convert". below the dam, outflow joins the Sisquoc River near Garey, CA to form the Santa Maria River.

Twitchell Dam was built by the United States Bureau of Reclamation between 1956; Template:Years or months ago (1956)Script error: No such module "Check for unknown parameters". and 1958; Template:Years or months ago (1958)Script error: No such module "Check for unknown parameters".. The original names were Vacquero Dam and Vacquero Reservoir, but they were changed to honor T. A. Twitchell of Santa Maria, a proponent of the project. The dam and reservoir provide flood control and water conservation.

The Central Coast of California only receives significant amounts of rainfall during the winter, this area averaging Script error: No such module "convert". per year. The water is stored in the reservoir during big winter storms and released as quickly as possible while still allowing it to percolate into the soil and recharge the groundwater.[1] This means that the reservoir is usually far from full. It is estimated that the project increases recharge by Script error: No such module "convert". annually.Script error: No such module "Unsubst".

Sedimentation is a problem for the reservoir, as the reservoir is being filled 70 percent faster than expected. This reduces its capacity and blocks the water inlet to the control gates. Some sediment has been removed by flushing it out during releases, but much of it is simply deposited immediately downstream, interfering with flows.

There is no public access to the dam or reservoir.[2]

See also

Notes

<templatestyles src="Reflist/styles.css" />

  1. Script error: No such module "citation/CS1".
  2. From U.S. Government Bureau of Reclamation web site.

Script error: No such module "Check for unknown parameters".

References

Template:Authority control