Tunnel hole-through

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Script error: No such module "Unsubst".

File:TBM S-210 Alptransit Faido East.jpg
Dismantling the tunnel boring machine 10 days after the hole-through on the Gotthard Base Tunnel in Switzerland.

Tunnel hole-through, also called breakthrough, is the time, during the construction of a tunnel built from both ends, when the ends meet,[1] and the accuracy of the survey work becomes evident. Many tunnels report breakthroughs with an error of only a few inches, for example:

See also

References

Template:Reflist

External links


Template:Asbox

  1. Script error: No such module "citation/CS1".
  2. Lotschberg
  3. Script error: No such module "citation/CS1".