Track gauge conversion

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Template:Refimprove Template:Sidebar track gauge Script error: No such module "sidebar". Track gauge conversion is the changing of one railway track gauge (the distance between the running rails) to another. In general, requirements depend on whether the conversion is from a wider gauge to a narrower gauge or vice versa, on how the rail vehicles can be modified to accommodate a track gauge conversion, and on whether the gauge conversion is manual or automated.

Sleepers

If tracks are converted to a narrower gauge, the existing timber sleepers (ties) may be used. However, replacement is required if the conversion is to a significantly wider gauge. Some sleepers may be long enough to accommodate the fittings of both existing and alternative gauges. Wooden sleepers are suitable for conversion because they can be drilled for the repositioned rail spikes.

Concrete sleepers are unsuitable for conversion. Concrete sleepers may be cast with alternative gauge fittings in place, an example being those used during the conversion of the Melbourne–Adelaide railway from Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". to Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters".. Steel sleepers may have alternative gauge fittings cast at production, may be drilled for new fittings or may be welded with new fittings.

Structures

Conversion from a narrow to a wider gauge may require enlargement of the structure gauge of the bridges, overpasses and tunnels, embankments and cuts. The minimum curve radius may have a larger radius on broader gauges requiring route deviations to allow the minimum curve radius to be increased. Track centers at stations with multiple tracks may also have to be increased. Conversion from narrow to standard gauge can cause several changes not because of the gauge itself, but in order to be compatible with the structure gauge of standard gauge track, such as height of overpasses so that trains can be exchanged. The choice of train couplers may be a factor as well.

Rail vehicles

Script error: No such module "Labelled list hatnote".

Where vehicles move to a different gauge, they must either be prepared for bogie exchange or be prepared for wheelset exchange. For example, passenger trains moving between the Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". in France and the Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". gauge in Spain pass through an installation which adjusts their variable-gauge axles. This process is known as "gauge change". Goods wagons are still subject to either bogie exchange or wheelset exchange.

Steam locomotives

File:South Australian Railways locomotives Rx201 and 607 at Tailem Bend locomotive depot, 1952 (LEBates).jpg
In Australia, the multiplicity of track gauges prompted locomotive builders, after the early 1920s, to provide for a potential change of gauge. Three classes of large locomotives ordered by the South Australian Railways in 1924, including the 600 class pictured here (right), were configured to permit easy conversion from Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". broad gauge to Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". standard gauge. The older Rx class locomotive next to it was incapable of being converted because its frames were too wide for standard gauge.Template:Refn

Some steam locomotives were constructed to be reconfigured to a different gauge: for example, some East African Railways locomotives; Garratts; the large 500, 600 and 700 class locomotives of the South Australian Railways introduced by William Webb in 1926;[1] and the Victorian Railways J, N and R classes. In the Australian instances, conversion was anticipated from Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". broad gauge to Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". standard gauge. Conversion to a wider gauge was similarly anticipated for the large Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". narrow-gauge Western Australian Government Railways V class locomotive (to standard gauge).[2] Of these locomotives, only one R class was converted (when in preservation).[3] Two unanticipated conversions to occur were the ten locomotives of the South Australian Railways 740 class (from standard to broad gauge) and five Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". narrow-gauge T class locomotives, which became the Tx class on the broad gauge before they were eventually converted back again.[4]

Gauge-change in steam locomotives has a long lineage. In about 1860, the Bristol and Exeter Railway converted five Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". locomotives to Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". gauge, and later converted them back again. Also in the 19th century, in the United States, some Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". broad-gauge locomotives were designed for easy conversion to Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". gauge, and in the United Kingdom some Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". broad-gauge locomotive classes of the Great Western Railway were designed for easy conversion to Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". gauge.[5] After World War II, a number of captured German 03 class Pacifics locomotives were re-gauged to the Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". Russian gauge.

Diesel and electric locomotives and trains

Most diesel and electric rolling stock can undergo gauge conversion by replacement of their bogies. Engines with fixed wheelbases are more difficult to convert. In Australia, diesel locomotives are regularly re-gauged between broad, standard and narrow gauges.

Wagons and coaches

Gauge conversion of wagons and coaches involves the replacement of the wheelsets or the bogies. In May 1892, wagons and coaches were converted when the Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". gauge of the Great Western Railway was abandoned.

Gauge orphan

During or after gauge conversion work, some stations and branch lines may become "gauge orphans". This occurs especially when it is not considered economically worthwhile to go to the expense of gauge conversion. For example, after the main line of the Adelaide–Wolseley railway line between Adelaide and Melbourne was converted in 1995 to standard gauge, the broad gauge Victor Harbor branch line became a gauge orphan because it was too lightly trafficked to be converted; it now prospers as a heritage line, SteamRanger.

See also

Script error: No such module "Portal".

References

Notes

<templatestyles src="Reflist/styles.css" />

Script error: No such module "Check for unknown parameters".

Citations

<templatestyles src="Reflist/styles.css" />

  1. Cite error: Script error: No such module "Namespace detect".Script error: No such module "Namespace detect".
  2. Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

Template:Sister project Template:Sister project

Template:Navbox track gauge