Ting Kau Bridge
Template:Use Hong Kong English Template:Use dmy dates
Template:Short description Template:Infobox Bridge Template:Chinese Ting Kau Bridge is a Script error: No such module "convert". long cable-stayed bridge in Hong Kong that spans from the northwest of Tsing Yi Island and Tuen Mun Road.[1] It is near the Tsing Ma Bridge which also serves as a major connector between the Hong Kong International Airport on Lantau Island and the rest of Hong Kong. It was completed on 5 May 1998.[2] The bridge is toll-free.
The bridge is part of Route 3, connecting the northwest New Territories with Hong Kong Island. Other major structures on the road include the Tai Lam Tunnel, the Cheung Tsing Tunnel, the Cheung Tsing Bridge and the Western Harbour Crossing. The Ting Kau Bridge carries the heaviest traffic volume of the bridges on the Lantau Link, with many container trucks travelling between mainland China and the Hong Kong container port. A chromatic study and specially designed architectural lighting are intended to set the bridge off in its surroundings.
Design
Ting Kau Contractors Joint Venture designed and built Ting Kau Bridge between 1995 and 1998. The joint venture consisted of lead partners Cubiertas Y Mzov (22%) and Entrecanales Y Tavora (22%), both of Spain (now both part of Acciona, S.A); Germany's Ed. Züblin (22%); Australia's Downer and Co (22%); and Hong Kong's Paul Y (12%). Constructing engineers were Schlaich Bergermann & Partner.[3]
The design and construction cost of the bridge was HK$1.94 billion. It is one of the longest cable-stayed bridges in the world. Along with the Tsing Ma and Kap Shui Mun bridges, it is closely monitored by the Wind and Structural Health Monitoring System (WASHMS).
Ting Kau Bridge is the world's first major 4-span cable-stayed bridge. This meant that the central tower had to be stabilised longitudinally, which was accomplished using the longest cable stays ever used in a bridge (Script error: No such module "convert".). The design of this bridge contains special features such as single leg towers, which are stabilised by transverse cables like the masts of a sailboat. The Ting Kau Bridge and approach viaducts link the western New Territories and the mainland to the Lantau Fixed Crossing expressway, which connects the airport to Kowloon and Hong Kong. It meets the Lantau Fixed Crossing on Tsing Yi Island, Script error: No such module "convert". from the Tsing Ma Bridge.
The Ting Kau Bridge and Approach Viaduct are Script error: No such module "convert". long while the triple Tower Bridge has an overall length of Script error: No such module "convert".. The three towers were specially designed to withstand extreme wind and typhoon conditions, and have heights of Script error: No such module "convert"., Script error: No such module "convert"., and Script error: No such module "convert"., located on the Ting Kau headland, on a reclaimed island in Rambler Channel (which is Script error: No such module "convert". wide), and on the northwest Tsing Yi shoreline, respectively. The arrangement of separate decks on both sides of the 3 towers contributes to the slender appearance of the bridge, while helping it act favourably under heavy wind and typhoon loads. Each deck carries 3 traffic lanes and a hard shoulder.
Smart system
A smart highway system was to become operational at Ting Kau Bridge in late December 2024, which could detect traffic accidents, and make appropriate arrangements to ensure a smooth traffic flow.[4]
Measurements
- Total length: Script error: No such module "convert".[5]
- Length of main spans: Script error: No such module "convert". and Script error: No such module "convert".[5]
- Main tower height: Script error: No such module "convert".
- Ting Kau tower height: Script error: No such module "convert".
- Tsing Yi tower height: Script error: No such module "convert".
- Deck surface area: Script error: No such module "convert".
- Deck cable steel weight: 2,800 tonnes
- Structural steel deck weight: 8,900 tonnes
- Weight of concrete panels 29,000 tonnes
- Distance of wind give: Script error: No such module "convert".
- Reinforcement deckScript error: No such module "Unsubst".: Script error: No such module "convert".
- Reinforcement towersScript error: No such module "Unsubst".: Script error: No such module "convert".
- Span lengths: Script error: No such module "convert".[5]
- Number of stay cables: 384
- Movements
- Vertical at mid-span: Script error: No such module "convert".
- Lateral at mid-span: Script error: No such module "convert".
- Longitudinal at End Pier or Tsing Yi Abutment: Script error: No such module "convert".
See also
References
<templatestyles src="Reflist/styles.css" />
- ↑ Script error: No such module "citation/CS1".
- ↑ Structurae database
- ↑ Schlaich Bergermann & Partner website
- ↑ Script error: No such module "citation/CS1".
- ↑ a b c Script error: No such module "Citation/CS1".
Script error: No such module "Check for unknown parameters".
Further reading
- Script error: No such module "Citation/CS1".
| Preceded by Cheung Tsing Highway |
Hong Kong Route 3 File:HK Route3.svg Ting Kau Bridge |
Succeeded by Tai Lam Tunnel |
Template:Bridges in Hong Kong Script error: No such module "Navbox".