Tarraleah Power Station
Template:Short description Template:Use Australian English Template:Use dmy dates Script error: No such module "Type in location".Script error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters".Expression error: Unexpected < operator.
The Tarraleah Power Station is a hydroelectric power station located in the Central Highlands, Tasmania, Australia. It is part of the Upper Derwent Hydro Scheme and is operated by Hydro Tasmania.
History
The Upper River Derwent hydroelectric scheme was developed at a time in 1934 when the former Hydro-Electric Commission had only two working power stations.[1]Template:Rp In 1934 the Derwent Valley Power Development power scheme was approved by the Parliament of Tasmania with the Tarraleah Power Station as the first completed power station of that scheme.[2]
Ticklebelly Flat, the nickname for the married quarters at Tarraleah Camp number 2 in the 1930s, is a name for the history of Hydro Tasmania by Heather Fenton, known as Ticklebelly Tales.[3]
Power station
Part of the Derwent scheme that now comprises eleven hydroelectric power stations, the Tarraleah Power Station is located aboveground on the west bank of the Nive River downstream from the village of Tarraleah and a short distance from the Lyell Highway. The station draws its water from a variety of sources. Water from the concrete arched Clark Dam across the River Derwent that forms Lake King William flows from the lake and also from the Butlers Gorge Power Station around Script error: No such module "convert". via the Tarraleah Canals.[4][5][6]
The power station was opened in July 1938[7][8][9][10] and has six Pelton-type turbines, with a generating capacity of Script error: No such module "convert". of electricity. The station output is fed to the transmission grid via 11 kV metal clad switchgear and two 11 /110 kV 75MVA 3-phase power transformers.[5]
In March 2023, an upgrade of the power station commenced.[11][12]
Engineering heritage award
The Tarraleah hydro-electric development received a Historic Engineering Marker from Engineers Australia as part of its Engineering Heritage Recognition Program.[13]
References
<templatestyles src="Reflist/styles.css" />
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ $123M upgrade to Tasmania's hyrdopower icon begins Energy Magazine 20 March 2023
- ↑ Revamp of 85 year old Tarraleah power station blows out to $1 billion The Examiner 4 December 2024
- ↑ Script error: No such module "citation/CS1".
Script error: No such module "Check for unknown parameters".
External links
- Script error: No such module "citation/CS1".