Template:Use Australian English Template:Short description Template:Use dmy dates Template:Infobox power station Tarong North Power Station is a 443 megawatt coal fired power station on the same site as Tarong Power Station in the South Burnett. The Queensland Government commissioned the construction of the power station in November 1999.[1] Construction work began in 2000. The power station was initially owned by a 50/50 joint venture between Tarong Energy and TM Energy.[2] Full ownership of the power station by Tarong Energy was obtained in November 2009.[2]
The plant was opened in 2003 and is based on an energy efficient supercritical design.[2] The Steam Generator was supplied by IHI and the steam turbine was manufactured by Toshiba.[3] Particulate emissions at the power station are reduced by bag filter technology.[2]
It is expected to close in 2036 or 2037 as part of Australia's coal phase out.[4]
Boondooma Dam was purpose-built to provide water to both Tarong and Tarong North power stations.[5] Coal is supplied from the nearby Meandu Mine.[3]
See also
Script error: No such module "Portal".
References
- ↑ Power station runs on time by Wal Baker. 12 February 2002. Retrieved on 31 May 2007. Template:Webarchive
- ↑ a b c d Tarong North Power Station Template:Webarchive. Retrieved on 3 January 2014.
- ↑ a b Power Technology Project Page for Tarong North
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".