Susitna River Bridge
Script error: No such module "Distinguish". Script error: No such module "Unsubst". Template:Use American English Script error: No such module "Infobox".Script error: No such module "Check for unknown parameters". The Susitna River Bridge, also known as the Gold Creek Bridge, was the longest bridge span on the United States Government Railway in Alaska. The steel Script error: No such module "convert". through-truss channel spans the Susitna River. It was completed in February, 1921. The crossing of the Susitna includes two 121-ft. combination Howe truss flanking spans and two Script error: No such module "convert". combination pony Howe truss end spans, with Script error: No such module "convert". of trestle at the southern approach and Script error: No such module "convert".. at the northern approach, making a total length of Script error: No such module "convert".. It is located Script error: No such module "convert". north of Anchorage, and Script error: No such module "convert". north of the terminus at Seward.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". The bridge was listed on the National Register of Historic Places in 1977.[1]
Study and design
In a study of the river under summer and winter conditions as a preliminary to the design of the bridge, high-water marks and ice scars on trees indicated the elevation reached by the ice while in motion. The spring break-up occurs usually before the ice has become soft, and in passing downstream massive pieces jam against the islands and bars and against the shore at points where the river takes a sharp turn, the water then rising until its pressure breaks the dams. It appeared evident that such rushes of accumulated water and ice would carry out any timber pier and that a concrete pier would be exposed not only to the tremendous pressure of the ice jam but also to undermining by the scour that would result from the creation of an ice dam against the pier. A comparative estimate for the structure over the main channel to consist of two Script error: No such module "convert". steel spans on three concrete piers (with one pier near the center of the channel) or a single Script error: No such module "convert". steel span on two concrete shore piers, slightly favored the long span, which therefore was adopted.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
The combination of steel trusses and timber trusses in the same bridge is considered to be justified by the high price of bridge steel and concrete work at the time of construction, it being cheaper to build all approach spans of timber and to make provision for possible renewal with steel and concrete when the life of the timber has reached its limit. For this reason the main piers were designed to support Script error: No such module "convert". steel flanking spans at some future time, each to replace the present Script error: No such module "convert". and Script error: No such module "convert". spans.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
The Cooper E60 loading was adopted for the Script error: No such module "convert". span, E50 for the timber and E44 for the trestling, which has Script error: No such module "convert". spans. In the design of the steel span the 1910 specifications of the American Railway Engineering Association were followed mainly. Wind loading was an exception to this; the bottom lateral system was designed for Script error: No such module "convert". on the area of train and floor in elevation, and on li times the area of truss members of one truss not covered by train and floor, while the top laterals were designed for Script error: No such module "convert". of span.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
Pier foundations and construction
Test holes Script error: No such module "convert". deep to determine the character of foundation for the concrete piers disclosed compact sand, gravel and large boulders in layers of varying thicknesses, suitable for carrying pier loading without foundation piles.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
Pier construction started in May, 1920, when the head of track was Script error: No such module "convert". south of the bridge site. Supplies were freighted by sleds on the ice until the river broke and then by boats and wagons. Transportation difficulties were practically overcome when the track reached the river in September, 1920. At that time excavation for the south pier was complete and that for the north pier had been begun. A temporary trestle Script error: No such module "convert". downstream from the bridge site permitted track laying to proceed and facilitated erection of the bridge without interference to traffic and to other construction work north of the river. Piles for the trestle bents, piers and abutments had been driven and the falsework for the steel span had been started from the north end before the track reached the site.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
An open caisson was used for the north pier excavation, and a cofferdam of Wakefield triple-lap sheet piling for the south pier. Excavation was started in the wet with orangepeel buckets operated by two stiff-leg derricks until hard material was struck; then the holes were pumped out and work was continued by laborers.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
Concrete work
Considerable difficulty was encountered in finding sand and gravel suitable for the concrete piers. Aggregate taken from pits in the vicinity of the bridge was not satisfactory, as samples showed humus. Several deposits along the railway line all showed the presence of this constituent in various amounts, except samples from a pit in a glacial moraine in front of Spencer Glacier, 56 miles north of Seward. This deposit tested clear and was used; 7 per cent of sand was added to the bank aggregate, which was deficient in this respect.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
After a partial failure in one of the piers during September, 1920, caused by poor cement, the presence of humus in the aggregate and the low temperature of the air and water, special measures were resorted to in placing concrete in main piers.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
When the cofferdam was unwatered, the bottom of the enclosure was under a Script error: No such module "convert". head of water from the river, and owing to the porous nature of the boulder and gravel formation considerable water was forced through the floor of the pit. The enclosure was Script error: No such module "convert". and it was found impracticable to partition it off and place and hold concrete in the dry against the flow of water. As the low temperature of the water (35 deg. F. in November) and the large area (Script error: No such module "convert".) made it impracticable to place concrete under water by bucket or pipe methods, the following plan was devised to meet the conditions of cold running water and low air Fig. 4. temperature. A large sheet of canvas was prepared in one piece, sufficient to entirely cover the bottom area and extend about Script error: No such module "convert". up the sides of the enclosure. This canvas was "formed-in" by wooden forms along the sides and ends, to provide a runway for water around the edges. Steam coils were placed around the sides of the pit enclosure and the entire spaced was housed in and made warm. Sand and gravel delivered on cars were heated by being dumped on a platform holding perforated steam pipe coils, and hot water was used in mixing.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
Concrete was poured at the south pier, containing Script error: No such module "convert"., from October 24 to November 11, 1920, during which time temperature readings ranged from —2 deg. to -j-48 deg. F. At the north pier, containing Script error: No such module "convert"., the pouring was from December 1 to December 18, 1920, when temperatures ranged from —12 deg. to -(-34 deg. F. The pit was kept unwatered, and the concrete was placed from chutes and pipes leading from mixer to pier. All concrete was given sufficient time to set before allowing cold water to come in contact with it.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
Erection of steel channel span
To hasten erection of the Script error: No such module "convert". span, it was necessary to proceed without waiting for completion of the piers. Falsework for this span, as mentioned, had been driven from the north end. The north approach trestle, piers and falsework for timber spans were driven and a temporary deck laid. One of the Script error: No such module "convert". pony spans was used temporarily to span the excavation for the north pier, thus permitting the construction of this foundation.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
Erection of steel started November 8, 1920, from the north end at panel point No. 2, a yard having been constructed on the north side of the river which was reached by means of the temporary trestle. Erection was continued to the south end and all steel except for the two north panels was assembled by December 15, 1920. Steel in these two panels which did not interfere with the Script error: No such module "convert". pony span was placed after December 25. As soon as this temporary span was removed, the rest of the steel was placed, completing the erection on January 8, 1921.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
A 100-ton locomotive crane with a boom having extensions to make a total length of Script error: No such module "convert". was used for the erection, being supplemented in the yard by a 35-ton locomotive crane with Script error: No such module "convert". boom. The total weight of steel in the span is 1,803 tons. Only a little riveting was done until after December 20, 1920, when over 90 per cent of the span was in place, but the work was then pushed until completion on February 9, 1921, during which time temperatures ranged from —42 to -(-34 deg. F. On some cold and windy days the riveters did not work; but on one occasion rivets were driven when it was —42 deg. in the morning and —12 deg. at quitting time. Rivets driven during very low temperatures were retested several times later in warmer weather and showed first class work. The total number of field rivets was about 42,200.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
The span was swung February 2, 1921, and the first train passed over on February 6. The work of erecting the timber spans and finishing the trestle progressed simultaneously with the steel erection, so that the bridge was entirely completed and ready for service on February 16. General supervision of the work was under Col. F. Mears, chairman and chief engineer of the Alaskan Engineering Commission. The preliminary design of the Script error: No such module "convert". steel span and the design and details of the timber spans and foundation work were made by W. J. H. Fogelstrom, former bridge engineer for the Commission, assisted by F. H. Chapin, assistant bridge engineer. Final design and details of the Script error: No such module "convert". steel span were made by the American Bridge Co., which also fabricated and erected the steel. All designs and detail plans of steel work were checked and approved by Modjeski & Angier, consulting engineers, Chicago; Hildreth & Co., Chicago, performed the inspection of steel at mill and shop.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
See also
- National Register of Historic Places listings in Matanuska-Susitna Borough, Alaska
- List of bridges on the National Register of Historic Places in Alaska
References
- Public Domain This article incorporates text from this source, which is in the public domain: McGraw-Hill's Engineering News-record (1921)
<templatestyles src="Reflist/styles.css" />
- ↑ Cite error: Script error: No such module "Namespace detect".Script error: No such module "Namespace detect".
Script error: No such module "Check for unknown parameters".
Bibliography
- Script error: No such module "citation/CS1".
External links
Script error: No such module "Navbox". Script error: No such module "Navbox".
- Pages with script errors
- Pages with reference errors
- Pages using infobox bridge with extra
- Pages using infobox bridge with empty coordinates parameter
- Pages with broken file links
- Source attribution
- 1921 establishments in Alaska
- Alaska Railroad
- Bridges completed in 1921
- Railroad bridges on the National Register of Historic Places in Alaska
- Railroad bridges in Alaska
- Buildings and structures on the National Register of Historic Places in Matanuska-Susitna Borough, Alaska
- Steel bridges in the United States
- Trestle bridges in the United States
- Buildings and structures in Matanuska-Susitna Borough, Alaska