Styal line

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Template:Use dmy dates Template:Use British English Template:Refimprove Template:Infobox rail line Template:Styal Line The Styal line is a suburban commuter railway line which runs through south Manchester, England; it commences at Slade Lane Junction, Template:Convert south of Template:Rws, and ends Template:Convert south at Template:Rws.

Opened in 1909, by the London and North Western Railway company,Template:Sfn it takes its name from the Cheshire station of Template:Rws, the last stop before the junction at Wilmslow. A branch line to Template:Rws was built in 1993, accessed via a triangular junction between Template:Rws and Styal; it is also referred to as the Airport line.[1]

Journeys into Manchester on the line have risen sharply since the 1990s and the opening of Manchester Airport station in 1993 fuelled an increase in express services from Northern England and beyond. As a result, it is now one of the most congested lines on the National Rail network, with services frequently susceptible to delays and cancellations.[2]

Between May 2018 and December 2022, the line operated on a skip-stop basis, with each station having a dedicated express service to Liverpool Lime Street, Preston, Blackpool North and Windermere. This was to maximise the number of train slots between Manchester Piccadilly and Manchester Airport; however, due to poor performance and falling passenger numbers, the service reverted to half-hourly calling at all stations in December 2022, with one service running between Template:Rws and Manchester Piccadilly and the other running between Manchester Airport and Liverpool Lime Street.[3] The three busiest stations (Heald Green, Template:Rws and Template:Rws) retain a third hourly express service in addition to the stopping services. As only one train per hour runs between Manchester Airport and Wilmslow, Styal station is served hourly.

History

File:Gatley station - up side - geograph.org.uk - 827101.jpg
When operated by British Rail, the line was served by Class 304 electric multiple units

In the early twentieth century, the line between Manchester London Road (now called Piccadilly station) and Stockport became unable to cope with the increasing traffic. To solve the problem, a new route avoiding Stockport was constructed by the London and North Western Railway; it ran from Slade Lane Junction, located in Longsight, to Wilmslow through what was then mainly a rural area. The primary purpose was to provide a bypass for express trains, but a few wooden stations were built on the line to encourage suburban development. In practice, very few expresses latterly used the line, as it was necessary for most trains to serve the important station at Stockport. The line opened in 1909 and, from 1923, was operated by the London Midland and Scottish Railway.

In the 1950s, as part of British Rail's Modernisation Plan, the British Transport Commission identified the Styal line as a suitable test track to prove its new electrification scheme; the line was electrified in 1959. Some of the stations were rebuilt using the Mod-X system at this time.[4] Following the Styal line tests, it was decided to adopt the 25 kV system across the electrified Great Britain rail network, outside the Southern Region.[5] There was a half-hourly electric service (Monday - Saturday) between Template:Rws and Template:Rws, operated by Class 304 EMUs.Template:Sfn Services were extended to Template:Rws when the MSJAR was re-electrified at 25 kV AC in 1971 and operated in this way until the line between Altrincham and Manchester was transferred to Manchester Metrolink in 1990.

In the 1970s, the Styal line was included in a proposal to create an underground railway across Manchester City Centre. The Picc-Vic tunnel was planned to connect the two major mainline railway termini, Manchester Piccadilly and Template:Rws; it would have enabled Styal line trains to run directly across the city to Template:Rws and Template:Rws. The Picc-Vic scheme was abandoned in 1977, due to funding difficulties.[6]

In 1993, a short spur line to Manchester Airport was opened, branching away the Styal line between Heald Green and Styal. Initially, services ran via Heald Green only, until a triangular junction was added a few years later which provided a link towards Styal.Template:Sfn Many services were then diesel powered until 2014. The introduction of Class 350s by First TransPennine Express on the Edinburgh-Manchester Airport line in December 2013 and Class 319s by Northern Rail in early 2015 curtailed the use of diesel trains on the line; this allowed for a 100 mph service compared with 75 mph limit for many diesel trains, such as the Class 156 and the now-retired Class 142 Pacer trains.Script error: No such module "Unsubst".

In 2006, the platforms at Mauldeth Road, Burnage, East Didsbury and Gatley stations were all reconstructed, as well as access improvements at Heald Green; patronage on the line increased after this investment. At the time, most platforms were future-proofed and extended to allow six carriage operation; however, it was not until 2019, with the arrival of the Class 195 and Class 331 units, that this platform capacity was fully utilised on Northern routes to Liverpool (Mauldeth Road) and Blackpool North (Burnage, East Didsbury and Gatley) which operate with six coaches.Script error: No such module "Unsubst".

In recent years, usage of the line has surged with growing commuter patronage, along with non-stopping services which use the line between Manchester Piccadilly and Manchester Airport. Nowadays, most services on the line operate via the airport. There are a couple of services each day (mainly long-distance trains) which take the direct route from Styal to Heald Green; that is to say, from Heald Green South Junction to Heald Green North Junction, for train crew route knowledge retention purposes northbound. However, the only services on the junction southbound are either freight or a Transport for Wales service which doesn't stop at either station and only operates on Sundays. This route can also be used for diversions if the Stockport route is closed for engineering work or is blocked due to an operational incident.Script error: No such module "Unsubst".

Stations

Styal line stations (with 5 year patronage statistics)
Station Image Location National services Annual
entry/exit
(millions)
1997/98[7]
Annual
entry/exit

1999/00[7]
Annual
entry/exit

2004/05[7]
Annual
entry/exit

2009/10[7]
Annual
entry/exit

2014/15[7]
Annual
entry/exit

2019/20[7]
Mauldeth Road File:Mauldeth Road railway station (3).JPG Ladybarn Northern Trains 87,054 Decrease 82,723 Increase 118,566 Increase 239,796 Increase 321,878 Decrease 305,762
Burnage File:Burnage railway station (1).JPG Burnage Northern Trains 71,774 Decrease 70,803 Increase 92,908 Increase 158,674 Increase 186,778 Increase 213,780
East Didsbury File:East Didsbury Railway Station (July 2015).jpg Didsbury Northern Trains
Transport for Wales
87,893 Decrease 86,832 Increase 124,511 Increase 272,656 Decrease 254,256 Increase 296,966
Gatley File:Gatley railway station.jpg Gatley Northern Trains
TransPennine Express
121,459 Increase 130,086 Increase 151,681 Increase 238,096 Increase 309,926 Decrease 338,506
Heald Green File:Heald green railway station.jpg Heald Green Northern Trains 191,537 Increase 204,190 Increase 245,950 Increase 379,956 Increase 497,988 Decrease 482,318
Manchester Airport File:The Station - geograph.org.uk - 511890.jpg Ringway Northern Trains
TransPennine Express
Transport for Wales
1,132,740 Increase 1,259,513 Increase 1,576,260 Increase 2,620,252 Increase 3,460,854 Increase 5,747,000
Styal File:Styal railway station, Cheshire - geograph.org.uk - 2333614.jpg Styal Northern Trains 679 Increase 1,332 Increase 3,719 Decrease 2,206 Increase 5,668 Decrease 21,670
Total 1,693,136 Increase 1,835,479 Increase 2,313,595 Increase 3,911,609 Increase 5,037,348 Increase 7,406,002

Services

Stopping services

All stations on the line are served by two stopping services per hour operated by Northern Trains: one runs between Liverpool Lime Street and Manchester Airport and the other runs between Manchester Piccadilly and Crewe. On Sundays, this is reduced to one train per hour which runs between Liverpool Lime Street and Wilmslow. These services are usually operated by a Template:Brc electric multiple unit (EMU).

The busier stations (East Didsbury, Gatley and Heald Green) are served by an additional third express train every hour. Early morning, late evening and peak services sometimes make additional stops to provide additional services; for example, Gatley is served by a Blackpool North train at 07:43 on Sunday mornings.

Mauldeth Road, Burnage and Heald Green are served exclusively by Northern Trains.

East Didsbury is also served by Transport for Wales Rail and Gatley is also served by TransPennine Express services.[8]

Styal line off-peak services (as of December 2021)
Station tph Stopping service Express service Additional express service
Template:Rws 2 Half hourly 'stopping' service
Template:Rws to Template:Rws
Template:Rws to Template:Rws
calling at all stations on the Styal line
Template:Rws 2
Template:Rws 3 style="background:#Template:National Rail colour; color:white; width:10px;"| Template:Rws to Template:Rws
(Transport for Wales)
style="background:#Template:Northern colour; color:white; width:10px;"| Template:Rws to Template:Rws/Template:Rws
Template:Rws 3 style="background:#Template:Northern colour; color:white; width:10px;"| Template:Rws to Template:Rws/Template:Rws style="background:#Template:National Rail colour; color:white; width:10px;"| Template:Rws to Template:Rws
(TransPennine Express)
Template:Rws 3 style="background:#Template:Northern colour; color:white; width:10px;"| Template:Rws to Template:Rws style="background:#Template:Northern colour; color:white; width:10px;"| Template:Rws to Template:Rws/Template:Rws
Template:Rws 7 style="background:#Template:National Rail colour; color:white; width:10px;" | to Template:Rws, Template:Rws and Template:Rws style="background:#Template:National Rail colour; color:white; width:10px;"| to Template:Rws, Edinburgh and Template:Rws
Template:Rws 1

Express services

TransPennine Express run through services, via Manchester Piccadilly, from across the north of England; these include to Template:Rws, via Template:Rws and Template:Stnlnk, operated by Class 185s. Their trains also operate from Template:Stnlnk/Template:Rws (both two-hourly) via Preston and Manchester Piccadilly.[9] These were operated by Class 185 diesel multiple units until December 2013, when they were replaced with Class 350 EMUs.[10] which were transferred to London Northwestern Railway in 2020, following replacement by Class 397 EMUs.

Transport for Wales Rail run an hourly service between the Airport and Template:Stnlnk via Template:Rws, using Class 197 units.[11]

See also

References

Citations

Template:Reflist

Sources

  • Script error: No such module "citation/CS1".

External links

Template:Sister project

Template:Railway lines in North West England Template:Airport rail links in the United Kingdom

Template:Authority control

  1. Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. a b c d e f Script error: No such module "citation/CS1".
  8. Template:NRtimes
  9. Script error: No such module "citation/CS1".
  10. Script error: No such module "citation/CS1".
  11. Script error: No such module "citation/CS1".