Steventon railway station

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Template:Use dmy dates Template:Use British English Script error: No such module "Infobox".Template:Template otherScript error: No such module "Parameter validation".Script error: No such module "Check for unknown parameters".Script error: No such module "check for deprecated parameters".

Steventon railway station was built when the Great Western Railway extended their main line from Reading to the village of Steventon, opening the line on 1 June 1840.Template:Sfn Two months later, on 20 July, it was extended to Faringdon Road,Template:Sfn and in December of that year, to Swindon.

Station for Oxford

For four years stagecoaches transported passengers between Steventon and Oxford, until 1844 when a branch was built to the city from Didcot; despite this, mail trains from the West continued to call at Steventon, rather than Didcot, in order to drop off mails for Oxford – this practice did not end until March 1962.Template:Sfn

On 7 December 1964 British Railways withdrew passenger services from Steventon and all other intermediate stations between Didcot and Swindon.Template:Sfn The station was demolished soon after closure and there is no evidence remaining, except for a house used briefly as the company headquarters of the Great Western Railway which still stands on the "up" (north) side of the line (see next section).

Headquarters of the GWR

Steventon was briefly the headquarters of the GWR: in October 1841, the Board decided to merge the previously-separate London and Bristol committees. Steventon was chosen as a suitable new location because it was close to the half-way point of the line (56 miles 22 chains from the old station at Paddington, 61 miles 71 chains from the old station at BristolTemplate:Sfn). A building for this purpose was erected: Brook House (now Grade II listed),Template:Sfn reputedly designed by the Engineer of the GWR, Isambard Kingdom Brunel in the Jacobean style, but modified by the Resident Engineer for the Reading/Swindon section of the line, J.H. Gandell (and subsequently built by him as contractor, after he resigned his post as Resident Engineer),Template:Sfn this building still survives on the north side of the line, set back slightly from the site of the station platforms. After a delay of several months, during which the accommodation was made ready, the weekly board meetings were held at Steventon from 21 July 1842 until 5 January 1843, when the permanent headquarters was established at Paddington.Template:Sfn

In 1966, a Brunel-designed building at Steventon station, described as "An imposing stone-built residence ... comprising 3 Reception, 4 Bedrooms, etc.", was placed on sale, and "offers in the region of £4,750" were invited.Template:Sfn

Accidents and incidents

  • On 21 January 1962, 68xx locomotive 6800 Arlington Grange was hauling a freight train that overran signals and was derailed.Template:Sfn

Route

Preceding station Historical railways Following station
Didcot
Line and station open
  British Rail
Western Region

Great Western Main Line
  Wantage Road
Line open, station closed

Template:Rail end

Notes

<templatestyles src="Reflist/styles.css" />
Script error: No such module "Check for unknown parameters".

References

  • Script error: No such module "Citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Template:National Heritage List for England
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".

Script error: No such module "Coordinates". Template:Closed stations Oxfordshire