Staines–Windsor line
Template:Short description Template:Use dmy dates Template:Infobox rail line
The Staines–Windsor line is a Template:Cvt railway line in Berkshire and Surrey, England. It branches from the Waterloo–Reading line at Staines-upon-Thames and runs to its western terminus at Windsor via intermediate stations at Template:Rws, Template:Rws and Template:Rws. All of the stations are managed by South Western Railway, which operates all passenger trains. Most services run between Windsor & Eton Riverside station and Template:Rws via Richmond and Template:Rws.
The line was promoted by the Windsor, Staines and South Western Railway (WSSWR). The first section, between Template:Rws and Datchet, opened on 22 August 1848. It was extended to a temporary station at Windsor on 1 December 1849. The permanent terminus, now known as Windsor & Eton Riverside station, was designed by William Tite and opened on 1 May 1851. The London and South Western Railway, which had operated all passenger services from the outset, took over the WSSWR in June 1850. The Southern Railway was responsible for electrifying the line with the 750 V DC third-rail system in 1930.
Infrastructure and services
Template:Staines to Windsor Line The Staines–Windsor line is a railway line in Berkshire and Surrey, England. It runs for Template:Cvt from its terminus at Windsor & Eton Riverside station to an at-grade junction with the Waterloo–Reading line at the west end of Staines station, Template:Cvt down the line from Template:Rws. There are intermediate stations at Template:Rws, Template:Rws and Template:Rws,Template:Sfn and the maximum permitted speed is Template:Cvt.Template:SfnTemplate:Sfn The line is electrified using the 750 V DC third-rail system and is double tracked throughout. Signalling is controlled by Basingstoke rail operating centre and Track Circuit Block is in operation.Template:SfnTemplate:Sfn Between Windsor & Eton Riverside and Datchet stations, there are two level crossings and the line crosses the River Thames at Black Potts Railway Bridge.Template:SfnTemplate:Sfn
The stations on the branch are managed by South Western Railway, which operates all services.[1] All stations have two operational platforms each.Template:SfnTemplate:Efn The buffer stop at Windsor & Eton Riverside is Template:Cvt down the line from London Waterloo, when measured via Template:Rws.Template:Sfn The off-peak service pattern is two trains per hour in each direction calling at all stations between Windsor & Eton Riverside and Twickenham, then Richmond, Template:Rws, Template:Rws, Template:Rws and London Waterloo. Off-peak trains from Windsor & Eton Riverside typically reach Staines in around 15 minutesTemplate:Sfn and London Waterloo in around 55 minutes.[1]
| Station | Distance from Waterloo via TwickenhamTemplate:Sfn |
Opened | Closed | Original name | Ref. |
|---|---|---|---|---|---|
| Template:Rws | Template:Cvt | Template:Date table sorting | Windsor | Template:Sfn | |
| Template:Rws | Template:Cvt | Template:Date table sorting | Datchett | Template:Sfn | |
| Template:Rws | Template:Cvt | Template:Date table sorting | Template:Sfn | ||
| Template:Rws | Template:Cvt | Template:Date table sorting | Template:Sfn | ||
| Template:Rws | Template:Cvt | Template:Date table sorting | Template:Date table sorting | Template:Sfn |
History
Script error: No such module "Labelled list hatnote".
Proposals and authorisation
The first proposal for a railway to Windsor was made by the Windsor, Slough and Staines Atmospheric Railway (WSSAR) company. Its engineer, Charles Vignoles, proposed two lines, one linking the town to Slough and the other to Staines, which would have crossed the Thames together at Romney Island.Template:SfnTemplate:Efn A bill was prepared and was given its first reading in the House of Commons on 13 February 1846.Template:Sfn After scrutiny by a select committee, parliament declined to consider the scheme any further on 19 May of that year.Template:Sfn
In the late 1840s, there was an intense rivalry between the London and South Western Railway (LSWR) and the Great Western Railway (GWR), both of which wanted to be first to open a railway to Windsor.Template:Sfn The board of the WSSAR joined with representatives of the LSWR and the Staines and Richmond Railway, to propose a standard gauge line to Windsor via Staines.Template:Sfn The new company, known as the Windsor, Staines and South Western Railway (WSSWR), employed Joseph Locke to design the new railway. Locke proposed two separate undertakings: a railway line from Richmond to Datchet via Staines and a loop line connecting Template:Rws and Template:Rws.Template:SfnTemplate:Efn
In early 1847, the GWR and WSSWR submitted separate bills to parliament for railways to Windsor. The GWR bill was rejected on 11 June, but the second scheme was approved two weeks later.Template:SfnTemplate:Efn Thomas Brassey was paid £111,700 to construct the WSSWR from Richmond to Datchet.Template:Sfn The LSWR agreed to lease the line for a 4.5% capital return and payment of half of the operating profits.Template:Sfn
Opening
The first section of the Staines–Windsor line opened on 22 August 1848. The western terminus was at Datchet and passengers for Windsor were required to catch a stagecoach to complete their journeys.Template:SfnTemplate:SfnTemplate:Efn The initial weekday service, operated by the LSWR, was 15 daily trains to London Waterloo and 12 trains to Windsor.Template:Sfn A provisional agreement between the WSSWR and the Crown to continue the line to Windsor was reached that month, but was not formalised until 14 February 1849, by which time the extension was under construction.Template:SfnTemplate:Efn Formal powers for the Datchet–Windsor section were granted on 26 June of that year.Template:Sfn
The WSSWR hoped to be able to open the extension to Windsor during August 1849, but on the 9th of that month, a crack appeared in one of the girders of the Black Potts Railway Bridge, requiring urgent structural repairs.Template:SfnTemplate:SfnTemplate:Efn As a result of the delay, the GWR, which had obtained authorisation for its own line, opened the first railway station in Windsor on 8 October that year.Template:SfnTemplate:Sfn The WSSWR finally opened its temporary terminus in Windsor on 1 December 1849.Template:SfnTemplate:Sfn
The LSWR, which had leased the line from the outset, took over the WSSWR on 30 June 1850.Template:SfnTemplate:Sfn The permanent terminus at Windsor opened on 1 May 1851.Template:SfnTemplate:Sfn Designed by William Tite in the Tudor-Gothic style, it included a private waiting room provided for Queen Victoria and her attendants.[2]Template:Sfn The three Template:Cvt platforms were spanned by a single roof and the enlarged signal box had 44 levers.Template:Sfn Initially trains stopped outside of the trainshed to allow the locomotives to be detached, before the carriages were hauled by rope into the station. This practice ceased in June 1868, following an accident in which a set of carriages crashed into the buffer stop.Template:Sfn
Later history
The two original intermediate stations on the line were rebuilt after their initial openings. In April 1861, Wraysbury station was resited around Template:Cvt southeast of its original site. A new brick-built station building was opened at Datchet on 10 October 1888, replacing the original timber structure.Template:Sfn
The Staines West Curve was opened with Staines High Street station on 1 July 1884.Template:Sfn[3] It enabled direct trains to run between Windsor and Template:Rws, without the need for reversal. From 1 May 1889, the service was extended southwestwards to Template:Rws via Template:Rws. By 1911, there were only four timetabled passenger trains using the curve on weekdays.Template:Sfn Staines High Street station closed on 30 January 1916.Template:Sfn The Staines West Curve was used again between 1921 and 1930 for a Windsor-Waterloo via Chertsey service, but the High Street station did not reopen.Template:Sfn Sunnymeads station, configured with a single island platform, opened on 10 July 1927.Template:SfnTemplate:Sfn
Electric trains began running on the Staines–Windsor line on 6 July 1930.Template:Sfn Initially the off-peak service was half-hourly to Waterloo with trains running non-stop east of Richmond. Additional services ran via Hounslow at peak times.Template:Sfn From summer 1936, 2-NOL electric multiple units worked the line,Template:SfnTemplate:Sfn but were replaced by 4-SUB units in December 1957. The latter had a brief tenure on the line, being replaced by Class 415 units the following May. Class 414 units were also used on the line from the late 1950s.Template:Sfn Class 707 trains were introduced in August 2017[4] and the first Class 701 units ran in passenger service on the line in January 2024.[5]
Between 1897 and 1940, coal was delivered from the Staines-Windsor line to the Metropolitan Water Board pumping station in London Road, Staines, via a Template:Cvt private siding.Template:Sfn The goods yards on the line closed in the early 1960s;Template:SfnTemplate:Sfn the shutting of the yard at Wraysbury in 1962, was followed by the closure of the signal box in March 1965.Template:Sfn A major resignalling project took place in the mid-1970s, which resulted in the line being controlled from Feltham area signalling centre. The scheme was commissioned on 8 September 1974Template:Sfn and the signal box at Windsor and Eton Riverside closed the same day.Template:Sfn Datchet signal box was retained for three months to operate the level crossing, but closed on 17 December 1974 when control was transferred to Feltham.Template:Sfn A second major resignalling project took place in the early 2020s. when control of the line was transferred to Basingstoke rail operating centre.[6][7]
Connections to the Staines and West Drayton line
The LSWR opposed a junction with the Staines & West Drayton Railway but three separate connections have existed. The earliest was through the sidings of the Staines Linoleum CompanyTemplate:Sfn and would have required use of turntables or reversals to pass wagons between the lines. During the Second World War, a single-track spur was laid from just south of Template:Rws to just west of the site of Staines High Street station, to provide an alternative should cross-London routes be blocked by bomb damage;Template:Sfn this link existed from 23 June 1940 to 16 December 1947 but was little used.Template:Sfn The last, laid in 1981 when the Staines West branch was severed by the M25 motorway, was to an oil terminal built in the former goods yard of Staines West stationTemplate:Sfn and lasted until 1991.
Proposed enhancements
The AirTrack scheme, proposed in 2008 to provide a new link to Heathrow Airport, included a station near the site of the former Staines High Street station.[8] The Windsor Link Railway also proposed a route for southern rail access to Heathrow, as well as linking the line to Template:Rws via a tunnel in Windsor.[9]
Notes
References
Bibliography
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
External links
Script error: No such module "Navbox".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Template:NHLE
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Template:Cite magazine
- ↑ Script error: No such module "citation/CS1".
- ↑ Template:Cite magazine
- ↑ Template:Cite magazine