Sparkasse Hagen Tower

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Use dmy dates Script error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters".

The Sparkasse Hagen Tower (Template:Langx[1][2][3]), often referenced as Langer Oskar[4][3][5] (Long Oskar) by locals, was a Script error: No such module "convert". skyscraper in the city centre of Hagen, North Rhine-Westphalia, Germany. The building served as the main office tower and part of the headquarters of the resident Sparkasse, Sparkasse Hagen. Built in the early 1970s it was a regional landmark for nearly three decades until demolition in 2004. It was replaced by a lower building complex, called Sparkassen-Karree Hagen,[6] which was inaugurated in 2006.

Construction

Construction began 1 August 1972 and finished on 29 November 1975. It was inaugurated on 29 November 1975. It was named after the director of the savings bank at that time, Oskar Specht. The architect of the building was Karl-Heinz Zernikow from Hagen.

The cultivated surface amounted to Script error: No such module "convert". the effective area Script error: No such module "convert". (office surface: Script error: No such module "convert".. The building had 22 storeys, of it 2 basements, the building height over the upper edge of the area was Script error: No such module "convert"., the building length of Script error: No such module "convert"., the building width approximately Script error: No such module "convert"..

The front consisted of a pre-hung aluminum construction with a surface of Script error: No such module "convert".. The converted area amounted to Script error: No such module "convert".. A characteristic was the constant reinforced concrete slab, which served the balance of the building for the elevator pits: Script error: No such module "convert"., and Script error: No such module "convert". thick.

Water leakage penetrated, and damaged building insulation. Repairs would have required further measures, including improvements to the air conditioning system and installation of a second stairway for fire safety reasons. Repair costs were estimated at €42 million. It was estimated that demolition would cost 5 million euro and construction of a new building would cost €16.8 million. Therefore, it was decided to demolish the current building and construct a new one.

Demolition

The building was explosively imploded at 10:53 on 7 March 2004, in the then-largest and riskiest breakup of a multistoried building in Europe. 1,450 explosive charges weighing 250 kilograms were used in timed sequence to cause 26,000 tons concrete and steel to first fold and then collapse into a predetermined Script error: No such module "convert". bed without damaging neighboring structures. The successful breakup is considered as master achievement of the specialty firm from Thuringia and receives an entry in the Guinness World Records.

References

<templatestyles src="Reflist/styles.css" />

  1. Cite error: Script error: No such module "Namespace detect".Script error: No such module "Namespace detect".
  2. Script error: No such module "citation/CS1".
  3. a b Script error: No such module "citation/CS1".
  4. Cite error: Script error: No such module "Namespace detect".Script error: No such module "Namespace detect".
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

Template:Tallest buildings in Germany Template:Authority control Template:Portal bar