View of Fântânele-Cogealac Wind Farm
The Fântânele-Cogealac Wind Farm

As of 2013, there was an installed capacity of 2,599 megawatts (MW) of wind power in Romania,[1] up from the 7 MW installed capacity in 2007.[2][3] Until December 2010, Romania added around 440 MW to its installed wind capacity from two wind farms: Fântânele-Cogealac and the EDP Peștera.[4] The Fântânele-Cogealac Wind Farm has been completed in 2012 and at the time was the largest in Europe.[5]

Romania has a wind-power potential of around 14,000 MW,[6] and an energy-generating capacity of 23 terawatt-hours.[6] The country's wind power capacity that can be assimilated by the national transport grid is between 3,000 MW and 9,000 MW,[7] while only in the last two years the total power of the requests for connecting to it was about 22.800 MW.[8] The Dobrogea region, which consists of Constanța and Tulcea counties, has the second-highest wind potential in Europe.[9]

Several companies are interested in investing in wind farms in Romania. The Italian company Enel Green Power, a subsidiary of Enel, plans to build several wind farms with a total capacity of 350 MW.[10] The Swiss conglomerate Cofra Group plans to build two large wind farms, one that will have a capacity of 700 MW in Dobruja and one that will have a capacity of 400 MW in Neamț and Suceava counties; the total investment will amount to $1.65 billion.[11] In 2008, Iberdrola bought 50 wind farm projects, with a combined installed capacity 1,600 MW, from two companies for $450 million.[12] Romanian companies interested in building wind farms include Electrica and Green Energy, which have plans to build wind farms that will have an installed capacity of 310 MW with total investments of $420 million.[13][14] The Hungarian company Sinus Holding will build five wind farms in the Northern Moldavia region, having an installed capacity of 700 MW and totaling $800 million in capital investment, that will be built by December 2009.[15]

Under development

The forthcoming 600 MW wind project, Dunarea East and West, situated in southeastern Romania, is scheduled to commence operations in 2026. This project's significant scale is compared with the nearby Fântânele-Cogealac wind power plant, currently the largest onshore wind facility in Europe, with a capacity of 600 MW.[16]

Romania is expected to establish its first wind farms in the Black Sea by 2027-2028, following a public consultation by the Ministry of Energy on a draft law for offshore wind energy. The plan includes auctioning 3 GW of offshore wind under a contract-for-difference scheme.[17]

Largest projects

Script error: No such module "Unsubst". These are the most important wind farm projects in Romania (larger than 10 MW):

Project name Sponsoring company Installed capacity (MW) County Status Completed/
Notes
Activ Business Casimcea Activ Business Script error: No such module "sort". Tulcea Approved [18]
Eco Power Eco Power Script error: No such module "sort". Buzău Approved [19]
EDP Dobrogea Energias de Portugal Script error: No such module "sort". Tulcea Approved [20]
EDP Peștera Wind Farm Energias de Portugal Script error: No such module "sort". Constanța Commissioned [21]
EDP Cernavodă Wind Farm Energias de Portugal Script error: No such module "sort". Constanța Commissioned [22]
Enel Agighiol Enel Green Power Script error: No such module "sort". Tulcea Commissioned [23]
Babadag I & II Martifer 42 Tulcea Commissioned [24]
Blue Investment BaiaScript error: No such module "Unsubst". Blue Investment Script error: No such module "sort". Tulcea Under construction [25]
Blue Planet BaiaScript error: No such module "Unsubst". Blue Planet Investments Script error: No such module "sort". Tulcea Under construction [26]
Fălciu-Berezeni E.ON Script error: No such module "sort". Vaslui Under construction [27]
Călimani West Wind Script error: No such module "sort". Suceava Approved [28]
Oravița Local authorities Script error: No such module "sort". Caraș-Severin Commissioned [29]
Enel Corugea Enel Green Power Script error: No such module "sort". Tulcea Under construction [30]
Eolgen Racovițeni Eolgen Script error: No such module "sort". Buzău Proposed [31]
Roșiești E.ON Script error: No such module "sort". Vaslui Approved [27]
EOL Săcele Electrica and Holrom Script error: No such module "sort". Constanța Approved [32]
Eolica Baia Eolica Dobrogea Script error: No such module "sort". Tulcea Approved [33]
Eolica Beidaud Eolica Dobrogea Script error: No such module "sort". Tulcea Approved [33]
Eolica Casimcea Eolica Dobrogea Script error: No such module "sort". Tulcea Approved [33]
Eolica Ceamurlia South Eolica Dobrogea Script error: No such module "sort". Tulcea Approved [33]
Eolica Cogealac Eolica Dobrogea Script error: No such module "sort". Constanța Approved [33]
Corbița Energycum Script error: No such module "sort". Vrancea Approved [34]
Eolica Corbu Eolica Dobrogea Script error: No such module "sort". Constanța Approved [33]
Fântânele-Cogealac CEZ Group Script error: No such module "sort". Constanța Commissioned 2012[4]
Eolica Grădina Eolica Dobrogea Script error: No such module "sort". Constanța Approved [33]
Eolica Istria Eolica Dobrogea Script error: No such module "sort". Constanța Approved [33]
Eolica Kogălniceanu Eolica Dobrogea Script error: No such module "sort". Constanța Approved [33]
Eolica Mihai Viteazu Eolica Dobrogea Script error: No such module "sort". Constanța Under construction [35]
Eolica Pantelimon Eolica Dobrogea Script error: No such module "sort". Constanța Approved [33]
Eolica Săcele Eolica Dobrogea Script error: No such module "sort". Constanța Approved [33]
Eolica Sarichioi Eolica Dobrogea Script error: No such module "sort". Tulcea Approved [33]
Eolica Târgușor Eolica Dobrogea Script error: No such module "sort". Constanța Approved [33]
Vetrișoaia E.ON Script error: No such module "sort". Vaslui Approved [27]
Eolus Vind Eolus Vind Script error: No such module "sort". Constanța Approved [36]
Europp Galați Europp Energocons Script error: No such module "sort". Galați Approved [18]
Eximprod Galați Eximprod Buzău Script error: No such module "sort". Galați Approved [18]
Green Energy Green Energy Script error: No such module "sort". Tulcea Approved [37]
Liteni-Dolhasca Ulli Rowind Script error: No such module "sort". Suceava Under construction [38]
Market Expert Tulcea Market Expert Script error: No such module "sort". Tulcea Approved [18]
Mărișelu Local authorities Script error: No such module "sort". Cluj Approved [39]
Moldova Noua Enel Green Power Script error: No such module "sort". Caraș-Severin Commissioned 2012[40]
New Energy Constanța New Energy Group Script error: No such module "sort". Constanța Under construction [41]
New Energy Tulcea New Energy Group Script error: No such module "sort". Tulcea Approved [41]
Orșova Toplet Energy Script error: No such module "sort". Mehedinți Under construction [42][43]
Romwind Constanța Romwind Script error: No such module "sort". Constanța Approved [18]
Sălbatica I Enel Green Power Script error: No such module "sort". Tulcea Commissioned 2011[44]
Sălbatica II Enel Green Power Script error: No such module "sort". Tulcea Commissioned 2012[45]
Sibioara Sibioara Wind Farm Script error: No such module "sort". Vaslui Approved [18]
Sinus Holding Sinus Holding Script error: No such module "sort". Vaslui/Suceava/Neamț Approved [15]
Tarcău Eolo Energy Script error: No such module "sort". Neamț Approved [46]
Tomis Team Dobrogea Tomis Team Script error: No such module "sort". Tulcea/Constanța Under construction [47]
Valea Nucarilor Enel Green Power Script error: No such module "sort". Tulcea Commissioned 2012[48]
Văcăreni Energie Investments Group Script error: No such module "sort". Tulcea Proposed [49]
Verbund Casimcea Verbund Script error: No such module "sort". Tulcea Commissioned [50]
Scobinți-Iași ACK srl Romania Script error: No such module "sort". Iași Approved [51]
Ruginoasa-Iași Moldova-Eolian srl Romania Script error: No such module "sort". Iași Proposed [52]
Siminoc - Murfatlar Zar Twins Energy Script error: No such module "sort". Constanța Approved
Nalbant Tulcea Philro Energia Script error: No such module "sort". Tulcea Approved [53]

Totals

Category status Total capacity
Commissioned Script error: No such module "sort".
Under construction Script error: No such module "sort".
Approved Script error: No such module "sort".
Proposed Script error: No such module "sort".
All Stages Script error: No such module "sort".

See also

<templatestyles src="Stack/styles.css"/>

Script error: No such module "Portal".

Script error: No such module "Check for unknown parameters".

References

<templatestyles src="Reflist/styles.css" />

  1. Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. a b Script error: No such module "citation/CS1".
  5. Sally Bakewell: "CEZ Commissions All GE Turbines at Europe’s Largest Wind Farm" in Bloomberg, 14 December 2012
  6. a b Script error: No such module "citation/CS1".
  7. Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".
  9. Script error: No such module "citation/CS1".
  10. Script error: No such module "citation/CS1".
  11. Script error: No such module "citation/CS1".
  12. Script error: No such module "citation/CS1".
  13. Script error: No such module "citation/CS1".
  14. Script error: No such module "citation/CS1".
  15. a b Script error: No such module "citation/CS1".
  16. Script error: No such module "citation/CS1".
  17. Script error: No such module "citation/CS1".
  18. a b c d e f Script error: No such module "citation/CS1".
  19. Script error: No such module "citation/CS1".
  20. Script error: No such module "citation/CS1".
  21. Script error: No such module "citation/CS1".
  22. Script error: No such module "citation/CS1".
  23. Script error: No such module "citation/CS1".
  24. Script error: No such module "citation/CS1".
  25. Script error: No such module "citation/CS1".
  26. Script error: No such module "citation/CS1".
  27. a b c Script error: No such module "citation/CS1".
  28. Script error: No such module "citation/CS1".
  29. Script error: No such module "citation/CS1".
  30. Script error: No such module "citation/CS1".
  31. Script error: No such module "citation/CS1".
  32. Script error: No such module "citation/CS1".
  33. a b c d e f g h i j k l m Script error: No such module "citation/CS1".
  34. Script error: No such module "citation/CS1".
  35. BR Review: "Eolica Dobrogea administrator sues Transelectrica and ANRE for EUR 118 mln prejudice", February 21, 2012
  36. Script error: No such module "citation/CS1".
  37. Script error: No such module "citation/CS1".
  38. Script error: No such module "citation/CS1".
  39. Script error: No such module "citation/CS1".
  40. Script error: No such module "citation/CS1".
  41. a b Script error: No such module "citation/CS1".
  42. Script error: No such module "citation/CS1".Script error: No such module "Unsubst".
  43. Script error: No such module "citation/CS1".
  44. Script error: No such module "citation/CS1".
  45. Script error: No such module "citation/CS1".
  46. Script error: No such module "citation/CS1".
  47. Script error: No such module "citation/CS1".
  48. Script error: No such module "citation/CS1".
  49. Script error: No such module "citation/CS1".
  50. Script error: No such module "citation/CS1".
  51. Script error: No such module "citation/CS1".
  52. Script error: No such module "citation/CS1".Script error: No such module "Unsubst".
  53. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".