Sheringham railway station

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Script error: No such module "For". Template:Use dmy dates Template:Use British English Script error: No such module "Infobox".Template:Template otherScript error: No such module "Parameter validation".Script error: No such module "Check for unknown parameters".Script error: No such module "check for deprecated parameters".

Sheringham railway station is the northern terminus of the Bittern Line in Norfolk, England, serving the town of Sheringham. It is Script error: No such module "convert". down the line from Template:Rws, including the reversal at Template:Rws. The station is situated on the southern edge of the town centre, but within walking distance of the beach. It is currently managed by Greater Anglia, which also operates all trains serving it.

History

It was opened by British Rail on 2 January 1967 replacing the original station in Sheringham opened by the Midland and Great Northern Joint Railway, which is located across the road, enabling the closure of the level crossing there. The original station subsequently became the terminus of the North Norfolk Railway heritage line.

At the time of opening, the railway itself was listed for closure; the basic timber platform provided was intended to cover only the last months of the line's operation.[1]

Rebuild

File:Sheringhamplatform.jpg
A view of the old platform, intended as a temporary structure when the line was scheduled for closure. This photograph was taken before the restoration of the level crossing, showing the buffer stops that marked the limit of operation at that time.

With the pending introduction of longer Stadler FLIRT Class 755 units by Abellio Greater Anglia, the temporary station platform was finally scheduled to be replaced. The replacement platform would be doubled in length to 80 metres and fitted with improved lighting and shelter. The station was due to be closed between Sunday 31 March and Sunday 5 May 2019 for the works to be completed.[2] In April, it was reported that the reopening of the station would be delayed due to a fault with supplied components.[3] Further delays were then caused by issues with signalling.[4] The station finally reopened in late May 2019.[5]

Services

All services at Sheringham are operated by Greater Anglia using Template:Brc BMUs.

The typical service on all days of the week is one train per hour to and from Norwich via Cromer.[6]

Preceding station National Rail National Rail Following station
TerminusGreater Anglia
Heritage Railways  Heritage railways

Template:S-text

Script error: No such module "Check for unknown parameters".

Connection with the North Norfolk Railway

File:The second train to use the crossing at Sheringham 24 04 2010 (3).JPG
The second train to use the new level crossing in April 2010

Between 2007 and 2010, work was undertaken to reinstate the original level crossing across the road to allow trains from Norwich to run onto the North Norfolk Railway (NNR) heritage line tracks. In December 2007, the BBC reported that Network Rail supported the plans to allow occasional crossing of the tracks for trains onto the heritage route. Work began in January 2010, with the moving of the NNR headshunt to slew into line with the National Rail section. The link was reinstated in March 2010, when the first passenger train over the new crossing was hauled by steam locomotive Oliver Cromwell from London Liverpool Street.[7][8] Occasional uses by charter trains and visiting rolling stock are anticipated not to exceed 12 times a year.

The North Norfolk Railway also operate a number of dining trains over the entire surviving section of the M&GN, between Holt and Cromer, during summer months.[9] Services began in 2016, working in partnership with the North Yorkshire Moors Railway, who were already a licensed operator on Network Rail;[10] these trains do not stop at the national railway station.

References

<templatestyles src="Reflist/styles.css" />

  1. Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. Template:NRtimes
  7. NNR Sheringham Level Crossing Template:Webarchive.
  8. Script error: No such module "citation/CS1".
  9. Script error: No such module "citation/CS1".
  10. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

Template:Sister project

  • Script error: No such module "Ordnance Survey coordinates". for Sheringham railway station

Template:Norfolk Railway Stations Template:Railway stations served by Abellio Greater Anglia

Script error: No such module "Coordinates".