Template:Infobox industrial process The Shell in situ conversion process (Shell ICP) is an in situ shale oil extraction technology to convert kerogen in oil shale to shale oil. It is developed by the Shell Oil Company.

History

Shell's in situ conversion process has been under development since the early 1980s.[1] In 1997, the first small scale test was conducted on the Template:Convert Mahogany property test site, located Template:Convert west of Denver on Colorado's Western Slope in the Piceance Creek Basin. Since 2000, additional research and development activities have carried on as a part of the Mahogany Research Project.[2] The oil shale heating at Mahogany started early 2004.[3] From this test site, Shell has recovered Template:Convert of shale oil.[4][5]

Process

File:Shell Freeze Wall Oil Shale.png
Shells Freeze Wall for in situ shale oil production

The process heats sections of the vast oil shale field in situ, releasing the shale oil and oil shale gas from the rock so that it can be pumped to the surface and made into fuel. In this process, a freeze wall is first to be constructed to isolate the processing area from surrounding groundwater.[1] To maximize the functionality of the freeze walls, adjacent working zones will be developed in succession. Template:Convert wells, eight feet apart, are drilled and filled with a circulating super-chilled liquid to cool the ground to Template:Convert.[4][6][7] Water is then removed from the working zone. Heating and recovery wells are drilled at Template:Convert intervals within the working zone. Electrical heating elements are lowered into the heating wells and used to heat oil shale to between Template:Convert and Template:Convert over a period of approximately four years.[2][6] Kerogen in oil shale is slowly converted into shale oil and gases, which then flow to the surface through recovery wells.[4][6]

Energy consumption

A RAND study in 2005 estimated that production of Template:Convert of oil (5.4 million tons/year) would theoretically require a dedicated power generating capacity of 1.2 gigawatts (10 billion kWh/year), assuming deposit richness of Template:Convert per ton, with 100% pyrolysis efficiency, and 100% extraction of pyrolysis products.[1] If this amount of electricity were to be generated by a coal-fired power plant, it would consume five million ton of coal annually (about 2.2 million toe).[8]

In 2006, Shell estimated that over the project life cycle, for every unit of energy consumed, three to four units would be produced.[4][6] Such an "energy returned on energy invested" would be significantly better than that achieved in the Mahogany trials. For the 1996 trial, Shell applied 440,000 kWh (which would require about 96 toe energy input in a coal-fired plant), to generate Template:Convert of oil (37 toe output).[9]

Environmental impacts

Shell's underground conversion process requires significant development on the surface. The separation between drilled wells is less than five meters and wells must be connected by electrical wiring and by piping to storage and processing facilities. Shell estimates that the footprint of extraction operations would be similar to that for conventional oil and gas drilling.[4][6] However, the dimensions of Shell's 2005 trial indicate that a much larger footprint is required. Production of 50,000 bbl/day would require that land be developed at a rate on the order of Template:Convert per year.[10]

Extensive water use and the risk of groundwater pollution are the technology's greatest challenges.[11]

Current implementations

In 2006, Shell received a Bureau of Land Management lease to pursue a large demonstration with a capacity of Template:Convert; Shell has since dropped those plans and is planning a test based on ICP that would produce a total of minimum Template:Convert, together with nahcolite, over a seven-year period.[12][13]

In Israel, IEI, a subsidiary of IDT Corp. is planning a shale pilot based on ICP technology. The project would produce a total of 1,500 barrels. However, IEI has also announced that any subsequent projects would not use ICP technology, but would instead utilize horizontal wells and hot gas heating methods.[14]

In Jordan, Shell subsidiary JOSCO plans to use ICP technology to achieve commercial production by the "late 2020s."[15] In October, 2011, it was reported that JOSCO had drilled more than 100 test holes over the prior two years, apparently for the sake of testing shale samples.[16]

The Mahogany Oil Shale Project has been abandoned by Shell in 2013 due to unfavorable project economics [17]

See also

References

Template:Reflist

External links

Template:Shell oil

  1. a b c Script error: No such module "citation/CS1".
  2. a b Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. a b c d e Template:Cite report
  5. Script error: No such module "citation/CS1".
  6. a b c d e Script error: No such module "citation/CS1".
  7. Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".
  9. Template:Cite patent See discussions related to Figs. 104, 175, and 176.
  10. The trial produced a total of 1800 barrels over the course of a year from wells spaced over an area of Template:Convert. For 50,000 bbl/day, the calculated land area per year is 365*50,000*100/1800 = 1 million m2, or 1 km2.
  11. Script error: No such module "Citation/CS1".
  12. Script error: No such module "citation/CS1".
  13. Script error: No such module "Citation/CS1".
  14. Script error: No such module "citation/CS1".
  15. Script error: No such module "citation/CS1".
  16. Script error: No such module "citation/CS1".
  17. Denver Post. Available in: <http://www.denverpost.com/breakingnews/ci_24167353/shell-abandons-western-slope-oil-shale-project> Page visited on 30 May 2015.