Line 8 (Shanghai Metro)

From Wikipedia, the free encyclopedia
(Redirected from Shanghai Metro Line 8)
Jump to navigation Jump to search

Template:Short description Script error: No such module "infobox".Script error: No such module "Check for unknown parameters". Line 8 is a north-south line of the Shanghai Metro network. It runs from Template:Stl, in Yangpu District to Template:Stl, in Minhang. The line is colored blue on system maps.

History

The subway line's first phase began trial operation on September 17, 2007 and officially opened on December 29, 2007, running between Template:Stl and Template:Stl. The second phase, from Yaohua Road to Template:Stl began operation on July 5, 2009.

Two stations opened later than the rest of the line: Template:Stl in September 2012 and Template:Stl opened in April 2011.

On May 4, 2017 it was announced the third phase had been renamed the Pujiang line, and will be a new Script error: No such module "convert". long automated people mover line running from Shendu Highway station to Huizhen Road station. It will use rubber tire Bombardier Innovia APM 300 technology. On January 13 Bombardier delivered the first out of 44 autonomous people movers to Shanghai.[1] It opened on March 31, 2018.

colspan="7" style="text-align: center" bgcolor=#Template:Rcr | Shanghai Metro Line 8 opening history
Segment Commencement Opened Length Station(s) Name Investment
Shiguang Road — Yaohua Road 21 Dec 2001 29 Dec 2007 Script error: No such module "convert". 20 Phase 1 ¥14.493 billion
Yaohua Road — Shendu Highway 27 Dec 2005 5 Jul 2009 Script error: No such module "convert". 8 Phase 2 ¥5.332 billion
Oriental Sports Center 12 Apr 2011 Infill station 1
China Art Museum 28 Sep 2012 Infill station 1

Controversy

Script error: No such module "labelled list hatnote". Even though Line 8 is a heavy rail rapid transit line, Class C trains designed for light metro lines consisting of 6 or 7 cars are being used throughout the line. Due to the trains relatively smaller loading gauge and capacity compared to Class A trains used on other Shanghai Metro lines, the line is extremely crowded. This has caused much doubt among the public in Shanghai Metro's ability to accurately predict passenger flows for future lines.[2] It was revealed that Line 8 originally was forecasted to have a short term daily ridership of 400,000-500,000 people/day, which warrants the use of larger Class A trains on other Shanghai Metro lines. This is not surprising given Line 8 is planned to serve some of Shanghai's densest neighborhoods and several major attractions. However the forecast was revised many times and finally downgraded to 200,000 people/day through "internal negotiation and coordination", which allowed Shanghai Alstom, a company interested in manufacturing and selling Class C trains in Shanghai, to build trains for Line 8.[2] Chief designer Yu Jiakang noted that in addition to short term solutions such as operating 7 car trains and reducing headways, last resort is to rebuild Line 8 as the loading gauges of Class C trains are incompatible with Class C trains. Additionally, parallel relief bus services have started operating.[2] The initial 28 trainsets were 6-car consists. Due to overcrowding, subsequent train purchases (62 sets) were 7-car sets. There was a canceled plan to expand 08C01 stocks from the 6-car sets to 7-car sets.

Stations

Script error: No such module "labelled list hatnote".

Service routes

colspan="12" style="text-align: center" bgcolor=#Template:Rcr | Shanghai Metro Line 8 service routes
Routes Station name Connections Distance Location Open-
ing
Plat-
form[3]
M C P EnglishScript error: No such module "Check for unknown parameters". ChineseScript error: No such module "Check for unknown parameters". kmScript error: No such module "Check for unknown parameters". minScript error: No such module "Check for unknown parameters".
● Template:Stl Script error: No such module "Lang". 0.00 0.00 0 Yangpu 29 Dec
2007[4]
Underground Side
● Template:Stl Script error: No such module "Lang". 0.88 0.88 2
● Template:Stl Script error: No such module "Lang". 1.07 1.95 5
● Template:Stl Script error: No such module "Lang". 1.04 2.99 7
● ● ● Template:Stl Script error: No such module "Lang". 0.85 3.84 9 Underground Island
● ● ● Template:Stl Script error: No such module "Lang". 1.41 5.25 11
● ● ● Template:Stl Script error: No such module "Lang". Template:Rint 1.04 6.29 14
● ● ● Template:Stl Script error: No such module "Lang". 0.88 7.17 16
● ● ● Template:Stl Script error: No such module "Lang". Template:Rint 0.81 7.98 17 Hongkou
● ● ● Template:Stl Script error: No such module "Lang". 1.07 9.05 20 Underground Side
● ● ● Template:Stl Script error: No such module "Lang". Template:Rint 1.47 10.52 22 Underground Island
● ● ● Template:Stl Script error: No such module "Lang". 1.27 11.79 25 Jing'an
● ● ● Template:Stl Script error: No such module "Lang". 1.23 13.02 27
● ● ● Template:Stl Script error: No such module "Lang". Template:Rint 1.19 14.21 30
● ● ● Template:Stl Script error: No such module "Lang". Template:Rint Template:Rint 1.18 15.39 32 Huangpu Underground Island & Side
● ● ● Template:Stl Script error: No such module "Lang". Template:Rint 0.74 16.13 34 Underground Island
● ● ● Template:Stl Script error: No such module "Lang". Template:Rint 0.96 17.09 36
● ● ● Template:Stl Script error: No such module "Lang". Template:Rint 0.85 17.94 38
● ● ● Template:Stl Script error: No such module "Lang". Template:Rint 1.12 19.06 40
● ● ● Template:Stl Script error: No such module "Lang". 2.11 21.17 43 Pudong 28 Sept
2012[5]
● ● ● Template:Stl Script error: No such module "Lang". Template:Rint 0.90 22.07 46 29 Dec
2007[4]
Underground Side
● ● ● Template:Stl Script error: No such module "Lang". Template:Rint 0.90 22.97 48 5 July
2009[6]
Underground Island
● ● ● Template:Stl Script error: No such module "Lang". 1.13 24.10 50
● ● ● Template:Stl Script error: No such module "Lang". Template:Rint Template:Rint 1.67 25.77 53 12 April
2011[7]
● ● Template:Stl Script error: No such module "Lang". 1.83 27.60 57 5 July
2009[6]
● ● Template:Stl Script error: No such module "Lang". 2.57 30.17 60 Minhang
● ● Template:Stl Script error: No such module "Lang". 2.61 32.78 64 Elevated Island
● ● Template:Stl Script error: No such module "Lang". 1.39 34.17 66
● ● Template:Stl Script error: No such module "Lang". 1.20 35.37 69
● ● Template:Stl Script error: No such module "Lang". Template:Rint Template:RintFengpu BRT 1.36 36.73 71


Important stations

  • Template:Stl - At this station, passengers can transfer to line 3. Previously they must exit and re-enter the station, but a new linkway has been built via the shopping center.
  • Template:Stl - Passengers can interchange to lines 1 and 2. This is also a very important station, as it is located at a major financial district as well as near many tourist attractions.
  • Template:Stl: The first platform to platform interchange station in the Shanghai Metro network. Interchange with line 4.

Station name change

Headways

colspan="5" style="text-align: center" bgcolor=#Template:Rcr | Shanghai Metro Line 8 headway[8]
Time Template:Stl -
Template:Stl
Template:Stl -
Template:Stl
Template:Stl -
Template:Stl
Monday - Friday (Working Days)
AM peak 7:15–9:20 About 3 mins and 30 sec About 2 min and 15 sec
Off-peak 9:20–17:00 About 8 min About 4 min About 8 min
PM peak 17:00–19:20 About 5 min and 30 sec About 2 min and 45 sec
Other
hours
Before 7:30
After 20:00
About 10 - 12 min About 5 - 6 min About 10 - 12 min
Saturday and Sunday (Weekends)
Peak 8:00–19:00 3 min and 40 sec -
7 min and 20 sec
About 3 min and 40 sec 3 min and 40 sec -
7 min and 20 sec
Other
hours
Before 8:00
After 19:00
About 10 - 12 min About 5 - 6 min About 10 - 12 min

Technology

Signalling

From June 19 to July 1, 2009, during the second phase of line 8 signal commissioning (upgrade from fully manual driving to CBTC semi-automatic driving), the first phase of operation efficiency was unstable, and trains stopped frequently. As a result, the driving time was much longer than normal, resulting in passenger congestion and seven consecutive large-scale failures. After investigation by the Shanghai Metro, it was found that the main reason for the stoppage of the train on Line 8 was that the communication transmission time set by the CBTC on-board software was too short, which caused the train to transmit too much data to the central computer, and the train was unable to accurately receive wireless signals. On July 2, 2009, after all the on-board software of the train was updated to resolve this issue.[9]

Rolling Stock

The designed speed of the train is 80 km/h, the length is 19.49 meters (Tc)/19.44 meters (Mp, M) (compare to longer, more common Class A carriages at 23 meters), and the width is 2.6 meters (Class A carriages are wider at 3.0 meters).

colspan="9" style="text-align: center" bgcolor="#Template:Rcr" | Shanghai Metro Line 8 rolling stock
Fleet numbers Manufacturer Time of
manufac-
turing
Class No
of
car
AssemblyTemplate:Efn-lr Rolling stock Number Notes
168 Alstom France (0801)
SATCOTemplate:Efn-lr (0802-0828)
2006-2008 CTemplate:Efn-lr 6 Tc+Mp+M+M+Mp+Tc 08C01 0801-0828
(080011-081681)
6 cars (080011-080061) built by CAF.
Original name: AC07.
126 CRRC Changchun Railway Vehicles Co., Ltd. 2009-2010 CTemplate:Efn-lr 7 Tc+Mp+M+M+M+Mp+Tc 08C02 0829-0846
(081691-082941)
[10] Original name: AC15A.
140 CRRC Changchun Railway Vehicles Co., Ltd. 2010-2011 CTemplate:Efn-lr 7 Tc+Mp+M+M+M+Mp+Tc 08C03 0847-0866
(082951-083341)
[10] Original name: AC15B.
168 CRRC Changchun Railway Vehicles Co., Ltd. 2018-2020 CTemplate:Efn-lr 7 Tc+Mp+M+M+M+Mp+Tc 08C04 08067-08090
(083351-085301)
Template:Notelist-lr

References

  1. ↑ Script error: No such module "citation/CS1".
  2. ↑ a b c Script error: No such module "citation/CS1".
  3. ↑ Script error: No such module "citation/CS1". Instructions: Script error: No such module "Lang".
  4. ↑ a b Script error: No such module "citation/CS1".
  5. ↑ Script error: No such module "citation/CS1".
  6. ↑ a b Script error: No such module "citation/CS1".
  7. ↑ Script error: No such module "citation/CS1".
  8. ↑ Script error: No such module "citation/CS1".
  9. ↑ The second phase of the trial operation of Line 8 tomorrow will find and eliminate the cause of the previous operational disorder. (originally published in "Youth Daily"). news.xinmin.cn. 2009-07-04.
  10. ↑ a b Script error: No such module "citation/CS1".

Template:Shanghai Metro lines Script error: No such module "navbox".