Line 8 (Shanghai Metro)
Template:Short description Script error: No such module "infobox".Script error: No such module "Check for unknown parameters". Line 8 is a north-south line of the Shanghai Metro network. It runs from Template:Stl, in Yangpu District to Template:Stl, in Minhang. The line is colored blue on system maps.
History
The subway line's first phase began trial operation on September 17, 2007 and officially opened on December 29, 2007, running between Template:Stl and Template:Stl. The second phase, from Yaohua Road to Template:Stl began operation on July 5, 2009.
Two stations opened later than the rest of the line: Template:Stl in September 2012 and Template:Stl opened in April 2011.
On May 4, 2017 it was announced the third phase had been renamed the Pujiang line, and will be a new Script error: No such module "convert". long automated people mover line running from Shendu Highway station to Huizhen Road station. It will use rubber tire Bombardier Innovia APM 300 technology. On January 13 Bombardier delivered the first out of 44 autonomous people movers to Shanghai.[1] It opened on March 31, 2018.
| colspan="7" style="text-align: center" bgcolor=#Template:Rcr | Shanghai Metro Line 8 opening history | ||||||
|---|---|---|---|---|---|---|
| Segment | Commencement | Opened | Length | Station(s) | Name | Investment |
| Shiguang Road — Yaohua Road | 21 Dec 2001 | 29 Dec 2007 | Script error: No such module "convert". | 20 | Phase 1 | ¥14.493 billion |
| Yaohua Road — Shendu Highway | 27 Dec 2005 | 5 Jul 2009 | Script error: No such module "convert". | 8 | Phase 2 | ¥5.332 billion |
| Oriental Sports Center | 12 Apr 2011 | Infill station | 1 | |||
| China Art Museum | 28 Sep 2012 | Infill station | 1 | |||
Controversy
Script error: No such module "labelled list hatnote". Even though Line 8 is a heavy rail rapid transit line, Class C trains designed for light metro lines consisting of 6 or 7 cars are being used throughout the line. Due to the trains relatively smaller loading gauge and capacity compared to Class A trains used on other Shanghai Metro lines, the line is extremely crowded. This has caused much doubt among the public in Shanghai Metro's ability to accurately predict passenger flows for future lines.[2] It was revealed that Line 8 originally was forecasted to have a short term daily ridership of 400,000-500,000 people/day, which warrants the use of larger Class A trains on other Shanghai Metro lines. This is not surprising given Line 8 is planned to serve some of Shanghai's densest neighborhoods and several major attractions. However the forecast was revised many times and finally downgraded to 200,000 people/day through "internal negotiation and coordination", which allowed Shanghai Alstom, a company interested in manufacturing and selling Class C trains in Shanghai, to build trains for Line 8.[2] Chief designer Yu Jiakang noted that in addition to short term solutions such as operating 7 car trains and reducing headways, last resort is to rebuild Line 8 as the loading gauges of Class C trains are incompatible with Class C trains. Additionally, parallel relief bus services have started operating.[2] The initial 28 trainsets were 6-car consists. Due to overcrowding, subsequent train purchases (62 sets) were 7-car sets. There was a canceled plan to expand 08C01 stocks from the 6-car sets to 7-car sets.
Stations
Script error: No such module "labelled list hatnote".
Service routes
| colspan="12" style="text-align: center" bgcolor=#Template:Rcr | Shanghai Metro Line 8 service routes | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||
| Routes | Station name | Connections | Distance | Location | Open- ing |
Plat- form[3] | |||||
| M | C | P | EnglishScript error: No such module "Check for unknown parameters". | ChineseScript error: No such module "Check for unknown parameters". | kmScript error: No such module "Check for unknown parameters". | minScript error: No such module "Check for unknown parameters". | |||||
| ● | Template:Stl | Script error: No such module "Lang". | 0.00 | 0.00 | 0 | Yangpu | 29 Dec 2007[4] |
Underground Side | |||
| ● | Template:Stl | Script error: No such module "Lang". | 0.88 | 0.88 | 2 | ||||||
| ● | Template:Stl | Script error: No such module "Lang". | 1.07 | 1.95 | 5 | ||||||
| ● | Template:Stl | Script error: No such module "Lang". | 1.04 | 2.99 | 7 | ||||||
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | 0.85 | 3.84 | 9 | Underground Island | |||
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | 1.41 | 5.25 | 11 | ||||
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | Template:Rint | 1.04 | 6.29 | 14 | |||
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | 0.88 | 7.17 | 16 | ||||
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | Template:Rint | 0.81 | 7.98 | 17 | Hongkou | ||
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | 1.07 | 9.05 | 20 | Underground Side | |||
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | Template:Rint | 1.47 | 10.52 | 22 | Underground Island | ||
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | 1.27 | 11.79 | 25 | Jing'an | |||
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | 1.23 | 13.02 | 27 | ||||
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | Template:Rint | 1.19 | 14.21 | 30 | |||
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | Template:Rint Template:Rint | 1.18 | 15.39 | 32 | Huangpu | Underground Island & Side | |
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | Template:Rint | 0.74 | 16.13 | 34 | Underground Island | ||
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | Template:Rint | 0.96 | 17.09 | 36 | |||
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | Template:Rint | 0.85 | 17.94 | 38 | |||
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | Template:Rint | 1.12 | 19.06 | 40 | |||
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | 2.11 | 21.17 | 43 | Pudong | 28 Sept 2012[5] | ||
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | Template:Rint | 0.90 | 22.07 | 46 | 29 Dec 2007[4] |
Underground Side | |
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | Template:Rint | 0.90 | 22.97 | 48 | 5 July 2009[6] |
Underground Island | |
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | 1.13 | 24.10 | 50 | ||||
| ● | ● | ● | Template:Stl | Script error: No such module "Lang". | Template:Rint Template:Rint | 1.67 | 25.77 | 53 | 12 April 2011[7] | ||
| ● | ● | Template:Stl | Script error: No such module "Lang". | 1.83 | 27.60 | 57 | 5 July 2009[6] | ||||
| ● | ● | Template:Stl | Script error: No such module "Lang". | 2.57 | 30.17 | 60 | Minhang | ||||
| ● | ● | Template:Stl | Script error: No such module "Lang". | 2.61 | 32.78 | 64 | Elevated Island | ||||
| ● | ● | Template:Stl | Script error: No such module "Lang". | 1.39 | 34.17 | 66 | |||||
| ● | ● | Template:Stl | Script error: No such module "Lang". | 1.20 | 35.37 | 69 | |||||
| ● | ● | Template:Stl | Script error: No such module "Lang". | Template:Rint Template:RintFengpu BRT | 1.36 | 36.73 | 71 | ||||
Important stations
- Template:Stl - At this station, passengers can transfer to line 3. Previously they must exit and re-enter the station, but a new linkway has been built via the shopping center.
- Template:Stl - Passengers can interchange to lines 1 and 2. This is also a very important station, as it is located at a major financial district as well as near many tourist attractions.
- Template:Stl: The first platform to platform interchange station in the Shanghai Metro network. Interchange with line 4.
Station name change
- On May 7, 2011, Jiyang Road was renamed Template:Stl.
- On June 9, 2013, the Aerospace Museum was renamed Template:Stl.
Headways
| colspan="5" style="text-align: center" bgcolor=#Template:Rcr | Shanghai Metro Line 8 headway[8] | ||||||
|---|---|---|---|---|---|---|
| Time | Template:Stl - Template:Stl |
Template:Stl - Template:Stl |
Template:Stl - Template:Stl | |||
| Monday - Friday (Working Days) | ||||||
| AM peak | 7:15–9:20 | About 3 mins and 30 sec | About 2 min and 15 sec | |||
| Off-peak | 9:20–17:00 | About 8 min | About 4 min | About 8 min | ||
| PM peak | 17:00–19:20 | About 5 min and 30 sec | About 2 min and 45 sec | |||
| Other hours |
|
About 10 - 12 min | About 5 - 6 min | About 10 - 12 min | ||
| Saturday and Sunday (Weekends) | ||||||
| Peak | 8:00–19:00 | 3 min and 40 sec - 7 min and 20 sec |
About 3 min and 40 sec | 3 min and 40 sec - 7 min and 20 sec | ||
| Other hours |
|
About 10 - 12 min | About 5 - 6 min | About 10 - 12 min | ||
Technology
Signalling
From June 19 to July 1, 2009, during the second phase of line 8 signal commissioning (upgrade from fully manual driving to CBTC semi-automatic driving), the first phase of operation efficiency was unstable, and trains stopped frequently. As a result, the driving time was much longer than normal, resulting in passenger congestion and seven consecutive large-scale failures. After investigation by the Shanghai Metro, it was found that the main reason for the stoppage of the train on Line 8 was that the communication transmission time set by the CBTC on-board software was too short, which caused the train to transmit too much data to the central computer, and the train was unable to accurately receive wireless signals. On July 2, 2009, after all the on-board software of the train was updated to resolve this issue.[9]
Rolling Stock
The designed speed of the train is 80 km/h, the length is 19.49 meters (Tc)/19.44 meters (Mp, M) (compare to longer, more common Class A carriages at 23 meters), and the width is 2.6 meters (Class A carriages are wider at 3.0 meters).
| colspan="9" style="text-align: center" bgcolor="#Template:Rcr" | Shanghai Metro Line 8 rolling stock | ||||||||
|---|---|---|---|---|---|---|---|---|
| Fleet numbers | Manufacturer | Time of manufac- turing |
Class | No of car |
AssemblyTemplate:Efn-lr | Rolling stock | Number | Notes |
| 168 | Alstom France (0801) SATCOTemplate:Efn-lr (0802-0828) |
2006-2008 | CTemplate:Efn-lr | 6 | Tc+Mp+M+M+Mp+Tc | 08C01 | 0801-0828 (080011-081681) |
6 cars (080011-080061) built by CAF. Original name: AC07. |
| 126 | CRRC Changchun Railway Vehicles Co., Ltd. | 2009-2010 | CTemplate:Efn-lr | 7 | Tc+Mp+M+M+M+Mp+Tc | 08C02 | 0829-0846 (081691-082941) |
[10] Original name: AC15A. |
| 140 | CRRC Changchun Railway Vehicles Co., Ltd. | 2010-2011 | CTemplate:Efn-lr | 7 | Tc+Mp+M+M+M+Mp+Tc | 08C03 | 0847-0866 (082951-083341) |
[10] Original name: AC15B. |
| 168 | CRRC Changchun Railway Vehicles Co., Ltd. | 2018-2020 | CTemplate:Efn-lr | 7 | Tc+Mp+M+M+M+Mp+Tc | 08C04 | 08067-08090 (083351-085301) |
|
| Template:Notelist-lr | ||||||||
-
08C01 train
-
08C02 train
References
- ↑ Script error: No such module "citation/CS1".
- ↑ a b c Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1". Instructions: Script error: No such module "Lang".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ The second phase of the trial operation of Line 8 tomorrow will find and eliminate the cause of the previous operational disorder. (originally published in "Youth Daily"). news.xinmin.cn. 2009-07-04.
- ↑ a b Script error: No such module "citation/CS1".
Template:Shanghai Metro lines Script error: No such module "navbox".