STS-111

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Script error: No such module "Unsubst". Template:Infobox spaceflight

STS-111 was a space shuttle mission to the International Space Station (ISS) flown by Space Shuttle Endeavour. STS-111 resupplied the station and replaced the Expedition 4 crew with the Expedition 5 crew. It was launched on 5 June 2002, from Kennedy Space Center, Florida.

Crew

File:ISS Expedition 5 crew.jpg
Launched Expedition 5 crew
File:ISS Expedition 4 crew.jpg
Landed Expedition 4 crew
Position Launching Astronaut Landing Astronaut
Commander Template:Flagicon Kenneth D. Cockrell
Fifth and last spaceflight
Pilot Template:Flagicon Paul S. Lockhart
First spaceflight
Mission Specialist 1 Template:Flagicon Philippe Perrin, CNES
Only spaceflight
Mission Specialist 2
Flight Engineer
Template:Flagicon/Template:Flagicon Franklin Chang-Díaz
Seventh and last spaceflight
Mission Specialist 3 Template:Flagicon Valery G. Korzun, RKA
Expedition 5
Second and last spaceflight
ISS Commander/Soyuz Commander
Template:Flagicon Yury I. Onufriyenko, RKA
Expedition 4
Second and last spaceflight
ISS Commander/Soyuz Commander
Mission Specialist 4 Template:Flagicon Peggy A. Whitson
Expedition 5
First spaceflight
ISS Flight Engineer
Template:Flagicon Carl E. Walz
Expedition 4
Fourth and last spaceflight
ISS Flight Engineer
Mission Specialist 5 Template:Flagicon Sergey Y. Treshchov, RKA
Expedition 5
Only spaceflight
ISS Flight Engineer
Template:Flagicon Daniel W. Bursch
Expedition 4
Fourth and last spaceflight
ISS Flight Engineer

Mission highlights

File:STS-111 launch.jpg
STS-111 launches from Kennedy Space Center, 5 June 2002.
File:Space Shuttle Endeavour touches down on the runway at Edwards Air Force Base, California to conclude International Space Station construction and supply mission STS-111 (EC02-0131-1).jpg
STS-111 lands at Edwards Air Force Base, 19 June 2002.

STS-111, in addition to providing supplies, rotated the crews aboard the International Space Station, exchanging the three Expedition 4 members (1 Russian, 2 American) for the three Expedition 5 members (2 Russian, 1 American).

The Multi-Purpose Logistics Module (MPLM) carried experiment racks and three stowage and resupply racks to the station. The mission also installed a component of the Canadarm2 called the Mobile Base System (MBS) to the Mobile Transporter (MT) (which was installed during STS-110); This was the second component of the Canadian Mobile Servicing System, or MSS. This gave the mechanical arm the capability to "inchworm" from the U.S. Lab fixture to the MBS and travel along the Truss to work sites.

STS-111 was the last flight of a CNES astronaut, the French agency having disbanded its astronaut group and transferred them to the ESA.

Crew seat assignments

Seat[1] Launch Landing File:Space Shuttle seating plan.svg
Seats 1–4 are on the flight deck.
Seats 5–7 are on the mid-deck.
1 Cockrell
2 Lockhart
3 Perrin Unused
4 Chang-Diaz
5 Whitson Perrin
6 Korzun Walz
7 Treshchov Onufriyenko
8 Unused Bursch

Spacewalks

File:STS-111 approach with MPLM.jpg
Endeavour carrying the Multi-Purpose Logistics Module on its approach to the ISS on STS-111
File:ISSAfterSTS111.jpg
Illustration of the International Space Station during STS-111
Mission Spacewalkers Start – UTC End – UTC Duration Mission
39. STS-111
EVA 1
Franklin R. Chang-Diaz
Philippe Perrin
9 June 2002
15:27
9 June 2002
22:41
7 h, 14 min Attached Power and Data Grapple Fixture to P6 Truss
40. STS-111
EVA 2
Franklin R. Chang-Diaz
Philippe Perrin
11 June 2002
15:20
11 June 2002
20:20[2][3]
5 h, 00 min Attached Mobile Base System to Mobile Transporter
41. STS-111
EVA 3
Franklin R. Chang-Diaz
Philippe Perrin
13 June 2002
15:16
13 June 2002
22:33
7 h, 17 min Replace Canadarm2 wrist joint
Attempt Planned Result Turnaround Reason Decision point Weather go (%) Notes
1 Script error: No such module "sort". Scrubbed Weather Script error: No such module "sort". Template:Zwsp(T−00:09:00 hold) 40% Thunderstorms and electrical activity.[4] Due to a post 9/11 security policy, NASA did not reveal the exact launch time until 24 hours before liftoff.[5]
2 Script error: No such module "sort". Scrubbed 0 days 23 hours 37 minutes Weather Script error: No such module "sort". 20% Scrubbed before tanking had begun, concerns of continued bad weather including hail.[6]
3 Script error: No such module "sort". Scrubbed 2 days 20 hours 38 minutes Technical Script error: No such module "sort". 20% Nitrogen valve problems.[7] The exact launch time had not been released, with NASA only stating that launch would occur between 4:00 PM and 8:00 PM.[8]
4 Script error: No such module "sort". Success 2 days 1 hour 23 minutes Initially 60%, later improved.

Media

See also

Script error: No such module "Portal".

References

Template:Include-NASA

<templatestyles src="Reflist/styles.css" />

  1. Script error: No such module "citation/CS1".
  2. NASA.gov
  3. NASA.gov
  4. Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

Script error: No such module "Side box".

Script error: No such module "Navbox". Script error: No such module "Navbox".

Script error: No such module "Navbox". Template:Orbital launches in 2002

Template:Use American English