Southport and Cheshire Lines Extension Railway
Template:Use dmy dates Template:Use British English Template:Infobox rail line The Southport and Cheshire Lines Extension Railway was an early British railway company operating in the then county of Lancashire. It was constructed to link the Cheshire Lines Committee railway at Aintree to Southport. It operated from 1884 to 1952.
History
Template:Short descriptionScript error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters". Template:Short descriptionScript error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters". The Southport and Cheshire Lines Extension Railway was authorised by two acts of Parliament, the Template:Visible anchor (44 & 45 Vict. c. cxciii) of 11 August 1881 and the Template:Visible anchor (45 & 46 Vict. c. cclxi) of 18 August 1882, the first authorising the line as far as Birkdale and the second the remaining section to Southport Lord Street.Template:Sfn It was promoted by the Cheshire Lines Committee (CLC) and was a natural extension of their North Liverpool Extension Line to Southport.Template:SfnTemplate:Sfn
Template:Short descriptionScript error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters". Template:Short descriptionScript error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters". Template:Short descriptionScript error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters". The Template:Convert line was built as a double track railway opening on 1 September 1884. The line was worked by the CLC under arrangements made in its acts of Parliament, these acts were ratified and amended by the Template:Visible anchor (52 & 53 Vict. c. lxx) to allow working with other companies.Template:Sfn
The railway remained independent until nationalisation in 1948.Template:Sfn
Route
- North Liverpool Extension Line
- Aintree Central, Aintree. 13 July 1880 – 7 November 1960.
- Southport Junction
- Junction with Liverpool, Ormskirk and Preston Railway
- Sefton and Maghull, Maghull. 1884–1952.
- Lydiate, Lydiate. 1884–1952.
- Altcar and Hillhouse, Altcar 1884–1952.
- Junction with Liverpool, Southport and Preston Junction Railway 1884.
- Mossbridge 1884–1917.
- Woodvale, Woodvale. 1884–1952.
- Ainsdale Beach, Ainsdale. 1901–1952.
- Birkdale Palace, Birkdale. 1884–1952.
- Southport Lord Street, Southport. 1884–1952.
Closure
Passenger services ended 7 January 1952 and goods six months later.Template:Sfn The line remained in intermittent use from Aintree to Altcar and Hillhouse to provide access to private sidings until May 1960, when the line was finally lifted.
The route today
The trackbed forms part of National Cycle Network Route 62, the Trans Pennine Trail. From Woodvale northwards the trail is joined by the Southport Coastal Road.
In January 2019, the Campaign for Better Transport released a report identifying the line which was listed as Priority 2 for reopening. Priority 2 is for those lines which require further development or a change in circumstances (such as housing developments).[1]
References
- Footnotes
- Sources
- Template:Awdry-RailCo
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".