The Rubicon Hydroelectric Scheme is a small run-of-the-river hydroelectric scheme located on the Rubicon and Royston Rivers, north east of Melbourne, Template:Convert south-west of Alexandra, Victoria, Australia. The scheme commenced in 1922, and was the first state-owned hydroelectric scheme to generate electricity in mainland Australia, and among the first in the world to be remotely controlled.[1] For the first ten years of its operation it supplied on average 16.9% of electricity generated by the State Electricity Commission of Victoria.[1] It is now owned and operated by AGL Energy and contributes approximately 0.02% of Victoria's energy supply.[2]

History

In the 1920s, the State Electricity Commission of Victoria investigated hydroelectric power generation, in parallel with work on brown coal-fired power stations at Yallourn. In 1922, a report was delivered by Messrs J.M. and H.E. Coane relating to the development of potential hydro-electric power on the Goulburn River and the Cerberean Range. Their findings were submitted to the Parliament of Victoria for funding,[3] with the more cost effective project[1] approved in 1922.[4]

Known as the Sugarloaf – Rubicon Project, the initial plan involved five power stations, with total turbine capacity of Template:Convert. It was to be the largest power scheme on the State Rivers and Water Supply Commission of Victoria's ongoing construction of the Sugarloaf storage reservoir for irrigation. Greatly enlarged in the 1950s, the reservoir is now called Lake Eildon. The four other power stations comprised two on the Rubicon, one on the Royston, and one on Snobs Creek. The plans were later altered, with the Snobs Creek station being deleted, and an additional station provided at Rubicon Falls, bringing the installed turbine capacity to over Template:Convert.[4] The Sugarloaf Power Station generated electricity during the irrigation season from October to April, when water released from the dam could also be used for power generation. The other four power stations were used during the wetter seasons of winter and spring.[4]

Work started in 1922 and, by 1928, the mountain stream section of the project was complete, with the Sugarloaf power station on the Eildon Weir following in 1929.[5] Rubicon 'A' power station has a pipeline with a Template:Convert drop over its Template:Convert length. That station remotely controlled the other ones in the project.[4] Minor enlargements were carried out at one station in 1954–55.[1]

In the 1950s, the Template:Convert Sugarloaf Power Station on the Goulburn River was replaced by the larger Eildon Power Station, after the weir was replaced by a much higher dam wall at the same site. The turbines were upgraded and reused.[5]

Details of the Rubicon Hydroelectric Scheme

Today, the scheme consists of three small run-of-river dams, four power stations, and associated raceways and penstocks.[6] The total generating capacity of the scheme is approximately 13 megawatts, which is achieved during the winter months.[2]

Royston Power Station

Script error: No such module "Type in location".Script error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters".Template:Main other The Royston Dam is a Template:Convert concrete slab and buttress on the Royston River. It diverts water into an aqueduct that carries water for Template:Convert into the neighbouring Rubicon Valley to the Royston Power Station forebay. The Royston penstock consists of Template:Convert of woodstave pipe on the upper section and Template:Convert of steel pipe on the lower section. The lower part of the woodstave section is now encased in concrete. The Royston Power Station has a capacity of Template:Convert. Water from the power station outlet discharges into the Rubicon aqueduct about halfway along its length.[1]

Component Location Notes
Royston Dam Template:Coord Template:Convert concrete slab and buttress dam[1]
Royston aqueduct Template:Coord Template:Convert[1]
Royston Power Station forebay Template:Coord
Royston Power Station penstock Template:Coord Template:Convert diameter. Template:Convert of woodstave pipe on the upper section and Template:Convert of steel pipe on the lower section.[1]
Royston Power Station Template:Coord 0.8 MW[7]

Rubicon Power Station

Script error: No such module "Type in location".Script error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters".Template:Main other The Rubicon Dam is a Template:Convert concrete-arch dam on the Rubicon River. It diverts water into the Rubicon aqueduct for Template:Convert to the site of the Royston Power Station, where it collects the water diverted through the power station from the Royston River. It then travels a further Template:Convert to the Rubicon Power Station forebay. The Rubicon penstock has a Template:Convert drop over its Template:Convert length. The Rubicon Power Station has two Template:Convert horizontal single-jet Pelton wheel generators.[1]

Component Location Notes
Rubicon Dam Template:Coord Template:Convert concrete arch dam[1]
Rubicon aqueduct Template:Coord Template:Convert from Rubicon Dam to site of Royston Power Station[1]
Rubicon aqueduct Template:Coord Template:Convert from Royston Power Station to Rubicon Forebay[1]
Rubicon Power Station forebay Template:Coord
Rubicon Power Station penstock Template:Coord
Rubicon Power Station Template:Coord 9.2 MW,[7] 2 turbines[1]

Lower Rubicon Power Station

Script error: No such module "Type in location".Script error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters".Template:Main other Water discharged from the Rubicon Power Station flows along a Template:Convert aqueduct, then through a Template:Convert, Template:Convert diameter penstock to the Lower Rubicon Power Station. This comprises a single Template:Convert horizontal generator. The discharge water from the power station is returned to the Rubicon River.[1]

Component Location Notes
Lower Rubicon aqueduct Template:Coord Template:Convert[1]
Lower Rubicon Power Station forebay Template:Coord
Lower Rubicon Power Station penstock Template:Coord Template:Convert of Template:Convert diameter riveted steel pipeline[1]
Lower Rubicon Power Station Template:Coord 2.7 MW,[7] 1 turbine[1]

Rubicon Falls Power Station

Script error: No such module "Type in location".Script error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters".Template:Main other The Rubicon Falls Dam is on the Rubicon River below the Rubicon Dam. It diverts water around the Rubicon Falls into the Rubicon Falls Power Station through a Template:Convert penstock. The power station has a single Template:Convert horizontal twin-jet Pelton wheel.[1]

Component Location Notes
Rubicon Falls Dam Template:Coord Template:Convert concrete slab and buttress dam[1]
Rubicon Falls Power Station penstock Template:Coord Template:Convert reinforced-concrete and steel pipeline[1]
Rubicon Falls Power Station Template:Coord 0.3 MW,[7] 1 turbine[1]

Tramway

A Template:Convert-gauge steel tramway was built for construction access between Rubicon Power Station and Rubicon Dam, with timber trestle bridges at Fifteen Thousand Foot Siphon, Royston Power Station, Beech Creek and Lubra Creek. The tramway remained in operation until the 1990s.[1] An additional tramway was built for construction of the Royston power station and dam, and removed on completion.

The trestle bridges were replaced after their destruction in the 1939 Black Friday bushfires, and were again replaced as part of a maintenance program in 1960s. The Royston and Lubra Creek bridges were replaced in 1987 and 1991 respectively. The Beech Creek bridge was destroyed in February 2009 by the Murrindindi Mill fire, one of the Black Saturday bushfires.[8] The Victorian Government agreed to rebuild the bridge in October 2011.[9]

Component Location Notes
15000 foot trestle bridge Template:Coord Template:Convert along aqueduct
Beech Creek trestle bridge Template:Coord Destroyed in 2009 Black Saturday bushfires
Lubra Creek trestle bridge Template:Coord

Heritage values

The Scheme is on the Victorian Heritage Register[10] and the Register of the National Estate,[1] and the surrounding state forest is set aside for its protection.[6] The historical significance of the scheme is increased by its century of continuous use in essentially original form.[10]

See also

Template:Stack

References

Template:Reflist

External links

Template:GeoGroup

Template:EnergyVictoria Template:Coord

  1. a b c d e f g h i j k l m n o p q r s t u v w Template:Cite AHD
  2. a b AGL – Rubicon Hydroelectric Scheme
  3. Script error: No such module "citation/CS1".
  4. a b c d Script error: No such module "citation/CS1".
  5. a b Script error: No such module "citation/CS1".
  6. a b Script error: No such module "citation/CS1".
  7. a b c d Murray Darling Basin Commission: Electricity Generation
  8. Script error: No such module "citation/CS1".
  9. Script error: No such module "citation/CS1".
  10. a b Template:Cite VHD