Rockies Express Pipeline

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Template:Infobox pipeline The Rockies Express Pipeline is a Script error: No such module "convert". long high-pressure natural gas pipeline system from the Rocky Mountains of Colorado to eastern Ohio. The pipeline system consists of three sections running through eight states.[1][2] It is one of the largest natural gas pipelines ever built in North America.[3][4][5] The final section of the pipeline was completed on 12 November 2009.

Partnership

The pipeline is operated by Rockies Express Pipeline, LLC, a partnership between Tallgrass Energy Partners, Phillips 66 and Sempra Energy.[6] In February 2006, Kinder Morgan Energy Partners and Sempra Energy acquired Entrega Gas Pipeline Inc., from EnCana Corporation.[7] In June 2006, ConocoPhillips acquired 24% of the project.[8] ConocoPhillips spun off the downstream part of its business in May 2012.

Environmental concerns

The pipeline project has raised some environmental concerns. Ohio officials have asked to avoid crossing the Big Darby Creek in Pickaway County and the Little Miami River in Warren County within Caesar Creek State Park because of the risk of harming fish and other wildlife posed by drilling the pipeline beneath the rivers.[2]

A Lawsuit by American Energy Corporation was filed against REX over the disruption of a coal mine owned by AEC beneath REX. In light of past pipeline accidents, where subsiding abandoned mines have caused pipelines to fail, the wisdom of the location of that part of the REX pipeline is of concern to pipeline industry critics.

Technical description

The diameter of Script error: No such module "convert". long pipeline system varies between Script error: No such module "convert"., being primarily Script error: No such module "convert"..[9] The capacity of the pipeline is Script error: No such module "convert".. It operates at a maximum allowable operating pressure of Script error: No such module "convert"..Script error: No such module "Unsubst". The initial cost of the pipeline was around US$5 billion.[1][7][10]

REX Template:En dash Entrega (Zone 1)

REX Template:En dash Entrega is the Script error: No such module "convert". long former Entrega Pipeline between the Meeker Hub in Rio Blanco County, Colorado, and the Cheyenne Hub in Weld County, Colorado. Construction of this pipeline was authorized in August 2005.[9] The pipeline project was acquired by Rockies Express Pipeline, LLC in February 2006. The Script error: No such module "convert". long segment from the Meeker Hub to the Wamsutter Hub in Sweetwater County, Wyoming, is a Script error: No such module "convert". pipeline, which has been in service since February 2006. The Script error: No such module "convert". long segment from the Wamsutter Hub to the Cheyenne Hub in Weld County, Colorado, is a Script error: No such module "convert". pipeline, which has been in service since February 2007.[11]

REX Template:En dash West (Zone 2)

REX Template:En dash West is a Script error: No such module "convert". long Script error: No such module "convert". pipeline from Weld County, Colorado, to Audrain County, Missouri.[11] It has a Script error: No such module "convert". long Script error: No such module "convert". branch connecting pipeline with the Williams Energy owned Echo Springs Processing Plant.

On 31 May 2006, the Rockies Express Pipeline filed an application to construct and operate this section. The construction approval was issued by the Federal Energy Regulatory Commission (FERC) on 20 April 2007.[12] The first Script error: No such module "convert". long segment of this pipeline was commissioned on 27 December 2007, and the second Script error: No such module "convert". long segment was commissioned on 16 May 2008. It is in full service since 16 May 2008.[9][13]

REX Template:En dash East (Zone 3)

REX Template:En dash East is a Script error: No such module "convert". long Script error: No such module "convert". pipeline from Audrain County, Missouri, to Clarington in Monroe County, Ohio.[11] The Rockies Express Pipeline filed an application to construct and operate this section on 30 April 2007 and the FERC issued approval on 30 May 2008.[9][14]

In June 2014, REX placed the Seneca Lateral into initial service and in January 2015, the Seneca Lateral was placed into full service with the ability to move approximately Script error: No such module "convert". onto the REX mainline in Zone 3. On August 1, 2015, REX placed its Zone 3 East-to-West Project into service, making Zone 3 of the mainline fully bi-directional with the ability to move approximately Script error: No such module "convert". of Appalachian production to Midcontinent markets.Script error: No such module "Unsubst".

The diameter of Script error: No such module "convert". long pipeline system varies between Script error: No such module "convert"., being primarily Script error: No such module "convert"..[9]The capacity of the pipeline is Script error: No such module "convert".. It operates at a maximum allowable operating pressure of Script error: No such module "convert"..Script error: No such module "Unsubst". The initial cost of the pipeline was around $5 billion.[1][7][10]

REX has filed with FERC for a Script error: No such module "convert". expansion of its Zone 3 east-to-west capacity, via compression additions. This project is anticipated to be completed in Q4 2016.

See also

References

<templatestyles src="Reflist/styles.css" />

  1. a b c Script error: No such module "citation/CS1".
  2. a b Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. a b c Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".
  9. a b c d e Script error: No such module "citation/CS1".
  10. a b Script error: No such module "citation/CS1".
  11. a b c Script error: No such module "citation/CS1".
  12. Script error: No such module "citation/CS1".
  13. Script error: No such module "citation/CS1".
  14. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

Template:Phillips 66