Riverway station
Template:Short description Template:Use mdy dates Template:Use American English Script error: No such module "Infobox".Template:Template otherScript error: No such module "Parameter validation".Script error: No such module "Check for unknown parameters".Script error: No such module "check for deprecated parameters".
Riverway station is a light rail station on the MBTA Green Line E branch, located at the intersection of South Huntington Avenue and Huntington Avenue in Boston, Massachusetts, slightly east of Brookline Village. The station is named for the Riverway parkway which runs on an overpass just to the west. Riverway is also the closest surface transfer between the D and E branches of the Green Line; Brookline Village station is about Script error: No such module "convert". to the west.[1]
The station is located on a street running segment of the E branch; trains run in mixed traffic rather than a dedicated median. The station has no platforms; riders wait on the sidewalks (shared with bus stops for the route 39 bus) and cross the street to reach trains. Because of this, the station is not accessible.
In 2021, the MBTA indicated plans to modify the Template:Bts–Template:Bts section of the E branch with accessible platforms to replace the existing non-accessible stopping locations.[2] The new platforms are planned to be long enough to accommodate two Script error: No such module "convert". Type 10 vehicles. Design work began in July 2023.[3][4] Platforms will be built at Riverway and Mission Park. since December 2024[update]Template:Dated maintenance category (articles)Script error: No such module "Check for unknown parameters"., design work is expected to be completed in late 2026, with construction taking place in 2027–2029.[5]
References
<templatestyles src="Reflist/styles.css" />
Script error: No such module "Check for unknown parameters".