Pilmaiquén Hydroelectric Plant

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Pilmaiquén Hydroelectric Plant is a series of hydroelectric power stations and projects owned by Statkraft, using water from Pilmaiquén River in Los Ríos Region, Chile.

Rucatayo

The Rucatayo plant produces Script error: No such module "convert". of electricity.[1] The plant was built by ENDESA between 1944 and 1959 was owned by Pilmaiquén S.A.[1] until 2015, when Statkraft bought it, along with the development rights to Osorno and Los Lagos. Rucatayo delivers around 304 GWh per year.[2]

Los Lagos

The Los Lagos project was planned at 50.8 MW power, delivering around 310 GWh per year.[2] It was modified to 51.6 MW power, but reduced to 260 GWh energy per year, starting in late 2022.[3]

Osorno

The Osorno project has 54.3 MW power, delivering around 343 GWh per year.[2] No decision has been made about starting the project.[3]

References

<templatestyles src="Reflist/styles.css" />

  1. a b Electricity generation capacity of Chile Template:Webarchive as of July 2007 by Comisión Nacional de Energía
  2. a b c Script error: No such module "citation/CS1".
  3. a b Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters". <templatestyles src="Stack/styles.css"/>

Script error: No such module "Portal".

Script error: No such module "Check for unknown parameters".

[[Category:Template:Resolve category redirect]]Template:Coord missing/CheckCat Template:Energy in Chile


Template:Asbox Template:Asbox