North Union Railway

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Script error: No such module "Unsubst". Template:Use British English Script error: No such module "Infobox".Script error: No such module "Check for unknown parameters".Script error: No such module "Check for clobbered parameters". Template:North Union Railway 1834 - 1889 The North Union Railway was an early British railway company, operating two main routes, from Parkside to Preston and from Bolton Trinity Street to Preston, all in Lancashire. The northerly part of the routes sharing the line from Euxton to Preston.

The company was created in 1834 with the first parliamentary authorised railway amalgamation. The two companies amalgamated were the Wigan Branch Railway (WBR) and the Preston and Wigan Railway (P&WR). In 1844 the company acquired the Bolton and Preston Railway (B&PR).

The company operated independently until 1846, then under joint lease of London and North Western Railway (L&NWR) and Lancashire and Yorkshire Railway (L&Y) but continuing as an independent company until 1889.

In 1889 it was absorbed by the lessees with the line from Parkside to Euxton going to the L&NWR and the line from Euxton to Bolton (the former B&PR) being taken by the (L&Y). The section from Euxton to Preston becoming jointly owned.

Most of the line eventually became part of the West Coast Main Line (WCML).

Formation

Script error: No such module "Labelled list hatnote". The Wigan Branch Railway obtained an act of Parliament, the Wigan Branch Railway Act 1830 (11 Geo. 4 & 1 Will. 4. c. lvi) on 29 May 1830 to build a line from the Liverpool and Manchester Railway (L&MR) near Parkside to Wigan. The act included a branch to the south of Wigan, the Springs branch, connecting to collieries in the district.Template:RefnScript error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

The Preston and Wigan Railway had been authorised by the Preston and Wigan Railway Act 1831 (1 Will. 4. c. lvi) in 1831 to construct a railway between Wigan and Preston but was struggling to find sufficient share subscriptions to start construction.Template:Refn The directors considered abandoning the project but decided that an amalgamation with the WBR would be of benefit to both companies. Within a month the board of the WBR resolved to consolidate with the P&WR.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Template:Short descriptionScript error: No such module "Infobox".Script error: No such module "Check for unknown parameters". The North Union Railway (NUR) was created by an act of Parliament, the <templatestyles src="Template:Visible anchor/styles.css" />North Union Railway Company Act 1834 (4 & 5 Will. 4. c. xxv) on 22 May 1834 which authorised the amalgamation of the Wigan Branch Railway (WBR) and the Preston and Wigan Railway (P&WR), the first-ever parliamentary approved railway amalgamation.Template:RefnScript error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

When it was created, the North Union Railway consisted of the single-track line constructed by the Wigan Branch Railway from the Liverpool and Manchester Railway (L&MR) at Parkside to Wigan Chapel Lane but little else. The WBR did not own any locomotives or rolling stock, its operations were all supplied under contract by the L&MR.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

The construction of the Wigan to Preston section did not start until after the amalgamation and the formation of the NUR.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Parkside to Wigan 1834-1838

Within a month of the amalgamation the railway appointed Charles Vignoles as engineer on the railway at a salary of £1,200 (equivalent to £Expression error: Unrecognized punctuation character "[". in Template:Inflation-yearTemplate:Inflation-fn). His duties were to supervise the building of the Script error: No such module "convert". Wigan to Preston line and oversee the running of the already built Script error: No such module "convert". Parkside to Wigan line. The building and supervision of the Springs branch was not included and became a separate contract.Template:EfnScript error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

A maintenance contract was let to Smith & Eckersley in May 1835, it was extended for a further two years.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Passenger service

The L&MR had provided passenger services to the WBR under contract, they continued to provide passenger services for the line under NUR ownership. The service continued as thrice daily each way between Parkside and Wigan.Template:EfnScript error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Freight service

The L&MR had initially provided the WBR with freight services but in 1834 the WBR offered John Hargreaves, an established carrier in the North West, the lease for operating the goods service on their line. Hargreaves, in partnership with his son (also called John Hargreaves) declined the offer and made a counter offer based on the previous years receipts which was accepted by the new North Union Railway, as this was now after the merger of the railways. In July 1835 the son, John Hargreaves junior took over as the sole lessee over the Parkside to Wigan section of the line for all goods traffic with the exception of those who already had the right to operate their own trains, mainly coal mine owners like Richard Evans who operated Edge Green Colliery which was just to the west of the NUR line and connected to it with a standard gauge siding.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

The NUR carried Post Office mail to Wigan, the mail being brought to Parkside from Liverpool and Manchester each evening, they were then handed to the guard of the Wigan train who handed them on to a messenger on arrival at Wigan.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Wigan to Preston construction and opening

The construction was undertaken in three contracts which were let in 1835, progress was never as fast as the board would have liked, they blamed much of the delay on Vignoles' frequent absences as he had taken on other work, including in Ireland.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". One of the contracts had to be re-let at the end of 1836 and a large culvert burst in a flood in November 1837 requiring the building of a Script error: No such module "convert". wooden bridge.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

The line going north out of Wigan was required by its act of ParliamentScript error: No such module "Unsubst". to cross Wallgate, a major road into Wigan town centre, by a bridge that was "in character architectural and handsome", this required raising the north end of the WBR on a substantial embankment.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

As Preston stands upon a ridge rising sharply from the north bank of the River Ribble reaching it involved some engineering, the North Union reached its northern terminus by descending gradients as steep as 1 in 100 into the valley, crossing the river and cutting into the rising ground as far as Fishergate where it built the station. The river bridge was of five arches, each spanning 120 ft. The line was completed in 1838 and a trial run was held on 22 October with a train running from Wigan to Preston, and the line opened to the public on 31 October 1838.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Stations

The NUR opened the Wigan to Preston section with the following stations:

  • Wigan Chapel Lane had been the northern terminus of the Wigan Branch Railway, it was closed on the same day as the opening of the Wigan to Preston section of the railway on 31 October 1838. It was replaced by the slightly further north Wigan station.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". This station became Wigan North Western on 2 June 1924.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
  • Boar's Head which was closed on 31 January 1949 (this station later became a joint station with the Lancashire Union Railway).Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
  • Standish Lane, this station probably opened shortly after the line's opening. It was renamed Standish by 1844 and was closed on 23 May 1949.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
  • Coppull which was closed on 6 October 1969.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
  • Euxton which was closed on 2 September 1895.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
  • Golden Hill which was renamed Leyland in 1838 and is still open.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
  • Farington which was often known as Farrington and closed on 7 March 1960.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
  • Preston, the northern terminus which is still open.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Springs branch

Script error: No such module "Labelled list hatnote".

File:Wigan Springs Branch Junction geograph-2730629-by-Ben-Brooksbank.jpg
Wigan Springs Branch Junction

The Springs branch branched off the mainline about a mile south of Wigan centre and ran north-east for most of its Script error: No such module "convert". length then turned sharply to run north-west after bridging the Lancaster Canal to the New Springs and Kirkless areas of Wigan.Template:Efn The branch was included in the initial plans of the company, and was included in its Act, it wasn't built immediately for financial reasons. Vignoles was authorised to set out the line in 1836 and it was opened by the North Union Railway as a single track line but with the infrastructure for double track on 31 October 1838, the branch was constructed for freight traffic, especially coal and had no passenger facilities.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

The area the branch was to run through had a number of coal mines some of which had been worked for decades, several of them had their own horse-drawn tramways, most of them were connected to either the Lancaster Canal or the Leeds and Liverpool Canal. Wherever the branch cut across these tramways a flat crossing was provided.Template:EfnScript error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

When it opened the branch had connections with several collieries and other industrial concerns, in 1845, when the first Ordnance Survey was conducted there were connections with:Template:Efn[1][2]

  • Springs Colliery, on the east of the branch and connected with a standard gauge siding and opened in 1840. The owners Pearson & Knowles worked their own trains to Preston in the 1840s. There were coke ovens on an adjacent site and it later became an engineering and wagon repair works.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
  • Ince Hall Coal & Cannel Company Colliery had several pits in the area.
    • Their lower coal works was on the west of the branch alongside a basin on the Leeds and Liverpool Canal near lock 19. This had a standard gauge transfer siding and opened before 1845.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
    • The other side of their lower coal works had a narrow gauge tramway running alongside a lengthy arm of the canal to a flat crossing over the branch and onto the north side of Moss Hall Collieries, this tramway was in existence before 1829.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
  • Moss Hall Collieries were to the east of the branch, as well as the connection above they had a lower narrow gauge connection which ran to lock 17 on the Leeds and Liverpool Canal. There was a transfer siding provided from 1845.Template:EfnScript error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
  • New Hall Colliery was to the east of the branch and connected via a narrow gauge tramway.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
  • New Hall Mill was to the west of the branch and connected via a narrow gauge tramway and a standard gauge siding.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
  • Barton's Kirkless Colliery was mainly to the west of the branch with at least one pit well the east, they were connected together and to the branch by standard gauge sidings.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
  • Thicknesse's Kirkless Colliery was to the north of the branch after the branch had crossed the Lancaster Canal, there was some overlap with Barton's Collieries in the area but Barton mined mostly deeper workings and Thicknesse the shallower ones, Thicknesse had a narrow gauge tramway connecting to a transfer siding on the branch.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
  • The Earl of Crawford and Balcarres owned mines in the Haigh and Aspull areas of Wigan. He had two Moor Pits and Wall Hey Pit that were connected together and to the branch at an end-on connection.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

The branch was doubled in 1845 except for a short section where it crossed the canal spur.Template:Efn

Other colliery connections

  • Ince Hall Colliery, later known as Crow Orchard Colliery, had a connection to the main NUR line just north of the Springs branch. The owner, Thomas Pearson, ran his own coal trains from the early 1840s.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
  • Amberswood colliery originally had a connection to the NUR mainline south of Springs branch junction, this line was removed in the early 1860s when it was replaced by a connection at Fir Tree House Sidings, close to the end of the L&NWRs Eccles, Tyldesley and Wigan line.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". The owner, Richard Hollinshead Blundell, ran his own coal trains to Preston from the early 1840s. Blundell was authorised to run his own trains over the L&MR to Liverpool and later agreed to carry some of the Earl of Crawford's coal when the L&MR refused him permission to run his own. Blundell also ran trains over the Grand Junction Railway working coal to Winsford from 1844.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

1838 to 1844

By 1838 the Parkside to Wigan section of the railway had been double-tracked.,Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". a new Parkside station opened on 31 October 1838, providing improved connections with the Liverpool and Manchester Railway, it was east of the original station and situated at the junction with the L&MR. It was constructed jointly by the L&MR, GJR and NUR. The former station became a goods station on the L&MR.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Golborne was opened between Parkside and Wigan North Western as Golborne Gate or Gates by the NUR probably sometime before 1839 as the station started to appear on the maps in Bradshaw from then, fares to intermediate stations, including Golbourne Gate [sic] were published in 1839.Template:EfnScript error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Bolton to Preston

Script error: No such module "Labelled list hatnote".

The North Union Railway was concerned to protect its interests and had many disagreements with rival railways and canals.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". The North Union Railway opposed the proposed Bolton and Preston Railway (B&PR), whose original act of Parliament, the Bolton and Preston Railway Act 1837 (7 Will. 4 & 1 Vict. c. cxxi), of 15 July 1837 made for an independent route through to Preston. A further act of Parliament, the Bolton and Preston Railway Company Act 1838 (1 & 2 Vict. c. lvi), of 4 July 1838 was enacted withdrawing the B&PR's powers to build beyond Chorley and instead authorised an extension to join the North Union Railway's line at Euxton, north of Chorley.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

The Bolton and Preston Railway Act 1837 was passed with the proviso that the line north of Chorley should be delayed for three years so that a compromise could be reached between the two companies about running trains into Preston.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". Section 17 of the Bolton and Preston Railway Company Act 1838 removed this restriction.

When the first section of the Bolton to Preston line opened on 4 February 1841 it met the Manchester, Bolton and Bury Railway (MB&BR) coming up from Salford which had opened on 29 May 1838. This railway was built by the Manchester, Bolton and Bury Canal Navigation and Railway Company who had in 1831 converted from a canal company. Their railway terminated at Bolton Trinity Street station and part of the enabling act of ParliamentScript error: No such module "Unsubst". for the Preston to Bolton section made provision for the station to be converted to a through station to allow for traffic to Preston.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

In the same way as the L&MR provided operational services to the WBR and NUR over the Parkside to Wigan section, so the MB&BR provided operational services to the NUR over the Bolton to Preston Section.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

There was immediate competition between the two companies for the Manchester to Preston traffic and they tried to undercut each other's fares. The North Union managed to maintain the upper hand in the competition as they were able to extract tolls from its rival for running trains along its Euxton to Preston stretch.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

The rivalry was short-lived as the Bolton and Preston Railway was acquired by the North Union Railway by the Bolton and Preston Railway Act 1844 (7 & 8 Vict. c. ii) of 10 May 1844.Template:RefnScript error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Operations 1844—1889

In 1846 arrangements were authorised by the North Union Railways Purchase Act 1846 (9 & 10 Vict. c. ccxxxi) for the line to be leased jointly to the Grand Junction Railway (GJR) and the Manchester and Leeds Railway (M&LR) but before this happened the GJR became part of the London and North Western Railway (L&NWR), the arrangement continued however with the L&NWR and the M&LR jointly leasing the NUR.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

On 9 July 1847 the Manchester & Leeds Railway changed its title to the Lancashire and Yorkshire Railway (L&Y) but the leasing arrangement continued.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Script error: No such module "anchor". Template:Short descriptionScript error: No such module "Infobox".Script error: No such module "Check for unknown parameters". In 1845, in conjunction with the Ribble Navigation Company, the North Union obtained powers in the <templatestyles src="Template:Visible anchor/styles.css" />North Union and Ribble Navigation Branch Railway Act 1845 (8 & 9 Vict. c. cxvi) to build a branch to Victoria Quay on the River Ribble. This line was built to convey coal from the Wigan district to the river for shipment.Template:RefnScript error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Parkside west curve opened in 1847 by the L&NWR under powers obtained by the GJR.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". Preston Junction was opened by the L&NWR in 1849 at the junction of the two curves from the former L&MR line.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Winwick cut-off opened in 1864 which provided a straight route between Warrington Bank Quay and Wigan North Western saving express trains 24 minutes along that stretch.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Bamfurlong station was opened on 1 April 1878 by the L&NWR and closed on 27 November 1950.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

The NUR continued independently under this leasing arrangement with the L&NWR owning <templatestyles src="Fraction/styles.css" />6094 and the L&YR <templatestyles src="Fraction/styles.css" />3494.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". This was the situation until 26 July 1889 when it was jointly absorbed by the L&NWR and L&YR under the terms of the London and North Western Railway Act 1889 (52 & 53 Vict. c. xcviii).Template:Refn

The NUR was absorbed by the two larger companies by the simple expedient of the section from Euxton to Bolton (the former B&PR) being taken by the L&YR and the section from Parkside to Euxton going to the L&NWR.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". The section from Euxton to Preston and Preston remained in joint ownership.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Management

The first chairman of the company was Sir Thomas Dalrymple Hesketh, Bart. He had previously held the same position at the Preston and Wigan Railway.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". The board had active and powerful members in T. W. Rathbone, and Hardman Earle, who were also on the boards of L&MR and GJR.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

After dissolution

To cope with ever-increasing traffic, the line was quadrupled between 1889 and 1891.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

The stretch between Euxton Junction and Preston, which included the major part of Preston station, remained in joint ownership up to 1921 when the L&YR was absorbed by the L&NWR so from that date the former North Union Railway had only one owner.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". This section of the West Coast Main Line between London Euston and Carlisle had been the only part not wholly owned by the L&NWR.

Balshaw Lane and Euxton station was opened by the L&NWR on 2 September 1905, it closed on 6 October 1969.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". Services restarted from this station now named Euxton Balshaw Lane on 15 December 1997.[3]

Accidents and incidents

  • In November 1832 a locomotive from Evans' collieries at Edge Green collided head-on with a WBR passenger service on its way to Wigan at Parkside.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
  • A Pearson & Knowles locomotive ASA collided with a stage coach on a level crossing at Euxton on 7 September 1841.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
  • In February 1844 a coal train operated by Henry Blundell ran into the back of a Pearson & Knowles coal train near Coppull killing the brakesman.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
  • On 28 June 1847, the boiler of a locomotive exploded, injuring one person.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".
  • On 17 October 1850 a Pearson & Knowles locomotive LIVER was involved in an unspecified accident near Boars Head.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

References

Acts of Parliament

<templatestyles src="Reflist/styles.css" />

Script error: No such module "Check for unknown parameters".

Notes

Template:Notelist

Citations

<templatestyles src="Reflist/styles.css" />

  1. Cite error: Script error: No such module "Namespace detect".Script error: No such module "Namespace detect".
  2. Cite error: Script error: No such module "Namespace detect".Script error: No such module "Namespace detect".
  3. Script error: No such module "Citation/CS1".

Script error: No such module "Check for unknown parameters".

Bibliography

<templatestyles src="Refbegin/styles.css" />

  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "Citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Template:Quick-stations-5
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".

Further reading

  • Script error: No such module "citation/CS1".

Script error: No such module "Navbox".