North Anna Nuclear Generating Station

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Template:Infobox power station

The North Anna Nuclear Generating Station is a nuclear power plant on a Template:Convert site in Louisa County, Virginia, in the Mid-Atlantic United States. The site is operated by Dominion Generation company and is jointly owned by the Dominion Virginia Power corporation (88.4%) and by the Old Dominion Electric Cooperative (11.6%).

The plant has two Westinghouse pressurized water reactors which went on-line in 1978 and 1980, respectively. Together the reactors generate 1.79 gigawatts of power, which is distributed mainly to the greater Richmond area and to Northern Virginia. In March 2003, the Nuclear Regulatory Commission approved 20 year license extensions for both Units 1 & 2.[1]Template:Update needed Subsequent license applications for both units were submitted in 2020. The Nuclear Regulatory Commission approved the license for both Units 1 & 2 in August, 2024.[2] Unit 1's license will expire on April 1, 2058 and Unit 2's license will expire on August 21, 2060.[2]

An artificial lake, Lake Anna, was constructed on the North Anna River to provide a reservoir of water coolant for use with the nuclear plant.

Dominion Energy currently owns nuclear power plants in Virginia (North Anna, Surry), Connecticut (Millstone), South Carolina (Virgil C. Summer Nuclear Generating Station), and Wisconsin (Kewaunee). North Anna is similar in design and appearance to Surry Power Station.

Unit 3

Dominion obtained regulatory permission from the NRC to build and operate an additional unit at the site in 2017. The additional unit 3 would be an ESBWR.[3][4] but the project was placed on hold later in 2017 before construction started.[5]

Timeline

Dominion Nuclear North Anna, LLC submitted its application for an Early Site Permit (ESP) for the North Anna site on September 25, 2003. The NRC issued the ESP on November 27, 2007.[6] On the same day, Dominion submitted an application for a Combined Construction and Operating License (COL) for a 1,520 MWe GEHitachi Economic Simplified Boiling Water Reactor (ESBWR), designated as North Anna Unit 3.[7]

In 2009, having failed to agree on terms for an engineering construction and procurement deal with GE-Hitachi to actually build the reactor, Dominion issued a new request for proposals from reactor vendors. In 2010, Dominion announced that it had selected a 1,700 MWe, US-specific version of Mitsubishi Heavy Industries' (MHI) Advanced Pressurized Water Reactor (APWR) for the potential Unit 3.[8] The proposed reactor brought public protest. On August 7, 2008 six activists from the Peoples Alliance for Clean Energy were arrested at the North Anna Information Center for trespassing.[9]

On October 29, 2010, Dominion president Tom Farrell told investors that Dominion had decided to slow its development of the proposed third reactor and wait until the combined construction permit-operating license (COL) was approved by the NRC before deciding to complete the project. This approval was expected in early 2013 but issued in May 2017.[10]

In 2013, it was announced that the ESBWR design would be pursued after all. Dominion stated that it would amend its COL application to reflect the ESBWR technology by the end of 2013 and expected to receive the COL "no earlier than late 2015." Dominion noted that it had not yet committed to building a new unit at North Anna.[11] In October 2015, the Virginia Attorney-General's Office called for the abandonment of the project because of the cost burden on consumers.[12]

On January 19, 2017, the Nuclear Regulatory Commission announced that its staff had completed its Final Safety Evaluation Report for a Combined License for the proposed reactor. The report concluded there are no safety aspects that would preclude issuing the license for the construction and operation of the new reactor.[13] On May 31, 2017, the Nuclear Regulatory Commission announced that it had authorized the issuance of a Combined License for North Anna. The license granted permission to build and operate an ESBWR design at the site. The license contained conditions, including specific actions associated with the NRC's post-Fukushima requirements for Mitigation Strategies and Spent Fuel Pool Instrumentation, and a pre-startup schedule for post-Fukushima aspects of the new reactor's emergency preparedness plans and procedures.[14]

On September 6, 2017, Dominion Energy paused development activities related to North Anna Unit 3, a decision that nuclear consultant Jim Little suggests may have been due to market conditions and competition from natural gas. Since the federal construction and operating license is valid for 20 years, Dominion Energy may opt to resume the project if economic prospects for the plant improve within that period.[5][4]

Small modular reactor

In July 2024 Dominion Energy Virginia announced it was working with companies to evaluate siting a small modular reactor at North Anna. A state law recently passed enables this if additional costs for a typical customer are capped at $1.40/month.[15]

Electricity production

Generation (MWh) of North Anna Nuclear Generating Station (Nuclear Only)[16]
Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual (Total)
2001 1,330,009 1,143,905 854,828 1,098,088 1,345,816 1,328,286 1,309,556 1,180,135 766,649 1,055,363 675,270 1,008,849 13,096,754
2002 1,383,132 1,249,604 1,384,480 1,336,170 1,380,245 1,329,531 1,369,319 1,368,377 808,459 695,411 673,544 695,764 13,674,036
2003 657,460 934,583 670,491 873,437 1,378,282 1,104,919 1,370,835 1,368,968 1,326,010 1,381,122 1,337,023 1,380,994 13,784,124
2004 1,380,177 1,131,538 1,380,310 1,334,625 727,566 1,293,289 1,367,708 1,368,121 898,538 1,217,670 1,327,409 1,379,475 14,806,426
2005 1,378,645 1,245,298 1,379,217 1,331,771 1,376,260 1,165,921 1,200,615 1,133,899 1,305,752 631,866 1,167,316 1,371,729 14,688,289
2006 1,344,734 1,092,662 911,693 1,100,505 1,370,085 1,320,414 1,358,625 1,355,840 1,322,511 1,372,339 1,174,088 1,369,662 15,093,158
2007 1,341,834 1,225,477 1,053,541 787,792 1,365,955 1,290,720 1,179,547 1,355,964 823,746 1,017,273 1,319,018 1,226,060 13,986,927
2008 1,317,166 1,103,932 1,359,104 1,316,687 1,357,892 1,304,130 1,342,611 1,345,696 934,784 672,744 1,015,466 1,363,213 14,433,425
2009 1,362,798 1,231,207 833,088 1,274,774 1,347,168 1,310,543 1,348,917 1,345,588 1,310,138 1,226,884 1,321,340 1,290,165 15,202,610
2010 1,361,687 1,228,192 1,114,682 684,015 1,300,022 1,175,597 1,268,099 1,387,299 881,803 297,310 1,279,603 1,421,153 13,399,462
2011 1,401,513 1,280,879 1,415,138 1,370,636 1,410,534 1,348,095 1,380,199 1,008,408 0 0 490,477 1,412,638 12,518,517
2012 1,395,731 1,329,787 947,914 702,155 1,388,489 1,382,980 1,408,348 1,412,854 1,382,074 1,118,973 1,408,250 1,455,635 15,333,190
2013 1,458,785 1,318,027 1,457,705 843,393 850,982 1,382,500 1,414,297 1,420,297 851,102 1,135,893 1,413,262 1,459,030 15,005,273
2014 1,460,436 1,268,792 1,454,550 1,407,430 1,440,364 1,376,034 1,412,657 1,415,903 824,315 1,179,169 1,411,551 1,237,451 15,888,652
2015 1,431,286 1,258,957 916,508 1,332,610 1,441,757 1,375,687 1,411,730 1,414,436 1,376,806 1,446,635 1,407,057 1,457,163 16,270,632
2016 1,457,529 1,343,315 826,669 1,154,890 1,448,729 1,382,711 1,378,686 1,320,413 906,041 1,037,329 1,410,888 1,454,177 15,121,377
2017 1,458,978 1,273,105 1,458,065 1,406,585 1,444,147 1,378,445 1,410,563 1,415,040 896,555 1,191,180 1,410,077 1,383,347 16,126,087
2018 1,492,806 1,305,000 949,016 1,021,510 1,440,242 1,374,305 1,367,700 1,406,239 1,371,276 1,439,156 1,410,097 1,455,184 16,032,531
2019 1,396,877 1,297,006 766,348 1,165,131 1,437,982 1,322,702 1,401,589 1,410,977 846,872 1,411,119 1,411,659 1,456,277 15,324,539
2020 1,453,603 1,352,452 1,434,579 1,185,333 1,407,033 1,360,027 1,401,053 1,404,239 938,911 997,839 1,408,174 1,456,660 15,799,903
2021 1,456,185 1,309,964 998,445 820,317 1,153,390 1,376,263 1,410,118 1,409,507 1,161,340 1,416,680 1,404,295 1,455,142 15,371,646
2022 1,458,191 1,316,681 838,610 1,073,791 1,428,108 1,362,768 1,406,451 995,230 704,180 820,347 1,407,495 1,459,044 14,270,896
2023 1,456,930 1,315,651 1,451,180 1,401,192 1,444,616 1,390,938 1,411,171 1,414,672 829,273 1,101,540 1,409,573 1,201,530 15,828,266
2024 1,448,958 1,350,300 762,406 1,199,340 1,381,012 1,365,925 1,407,458 1,413,847 1,385,158 1,442,234 1,408,499 1,458,647 16,023,784
2025 1,460,646 1,316,512 744,492 1,249,212 --

Surrounding population

The Nuclear Regulatory Commission (NRC) defines two emergency planning zones around nuclear power plants: a plume exposure pathway zone with a radius of Template:Convert, concerned primarily with exposure to, and inhalation of, airborne radioactive contamination, and an ingestion pathway zone of about Template:Convert, concerned primarily with ingestion of food and liquid contaminated by radioactivity.[17]

The 2010 U.S. population within Template:Convert of North Anna was 21,396, an increase of 15.7 percent in a decade, according to an analysis of U.S. Census data for msnbc.com. The 2010 U.S. population within Template:Convert was 1,912,015, an increase of 22.6 percent since 2000. Cities within Template:Convert include Richmond (Template:Convert to city center).[18]

Seismic risk

The Nuclear Regulatory Commission's estimate of the risk each year of an earthquake intense enough to cause core damage to the reactor at North Anna was 1 in 22,727, according to an NRC study published in August 2010.[19][20]

According to the USGS, two distinct seismic zones are located in Virginia. The Central Virginia Seismic Zone and the Giles County Seismic Zone. Both of these zones produce recurrent small earthquakes at least every few years.[21] The North Anna Nuclear Generating Station, located 40 miles northwest of Richmond, lies within the Central Virginia Seismic Zone.

Known fault

During the construction of original nuclear reactors at North Anna, the utility learned of a tectonic fault within the construction site of the proposed plants from its outside independent engineering firm, Stone & Webster, who the utility had hired to assess the proposed nuclear plant locations. The government fined the utility $32,000.00 for concealing this information.[22]

According to the Huffington Post, this 1977 Justice Department memo "..focused on how the power company and federal regulatory officials went to efforts to not make public the knowledge of geologic faulting at North Anna. "[V]irtually the entire Office of Regulation of the [Nuclear Regulator Commission was]... well aware of the fault and determined not to take any immediate action," according to the memo. A government attorney, Bradford Whitman, did not recommend prosecution at the time, but the power company was eventually fined $32,500 for making false statements during the licensing process, according to the DOJ memo."[23]

Incidents

The Nuclear Regulatory Commission extended the operating licenses of these plants for an additional 20 years in 2003.

2011 Virginia earthquake

At 1:51pm on August 23, 2011, a 5.8 magnitude earthquake occurred, centered south of Mineral, Virginia, eleven miles from the North Anna Nuclear Station.[24] The Associated Press reported the quake "was felt as far north as Rhode Island, New York City and Martha's Vineyard, Mass." The reactors automatically shut down and, because of a loss of offsite power, four diesel generators started up to supply electricity to safety systems. The plant reported an "Alert" status, the second lowest level of four NRC emergency classifications,[25] until 11:16am on August 24, 2011.[26] One of the generators suffered a coolant leak and stopped working.[27] A fifth standby generator was activated to replace the broken unit, which was repaired.[26][28][29][30][31] Offsite power was restored later on August 23.[26][32] Dominion also reported that the aftershocks did not affect the power plant.[26] Also on August 24, Dominion announced that it had ended the "Notice of Unusual Event", the least serious of the NRC emergency classifications, at the North Anna Power Station following inspection of equipment susceptible to seismic activity.[33] However the plant was not restarted, pending NRC permission, until November.[34]

After the Fukushima disaster had occurred six months prior, the Virginia earthquake prompted public fears of a similar nuclear accident at North Anna.[35][36][37] According to local Virginia media station, WHSV, "The two North Anna reactors are among 27 in the eastern and central U.S. that may need upgrades because those plants are more likely to get hit with an earthquake larger than the one on which their design was based, according to a preliminary Nuclear Regulatory Commission review."Script error: No such module "Unsubst". Dominion has publicly stated that on-site, spent-nuclear-fuel long-term storage canisters shifted during the earthquake along with various building cracks, all while maintaining such damage does not represent unsafe operating conditions.Script error: No such module "Unsubst".

After more than two months of inspections, NRC permitted restart in November 2011.[34] As of December 20, 2011, both units at North Anna Power Station have restarted and are operating at full power.[38]

17 February 2012

On-site groundwater was found to contain a high level of tritium. The source of the tritium leak was unknown.[39]

14 December 2016

Some diesel generator fuel oil was believed to be released underground, the source of leakage was unknown.[40][41]

Reactor data

The North Anna Nuclear Generating Station consists of two operational reactors, two originally planned units were cancelled. One additional unit is planned.

Reactor unit[42] Reactor type Capacity(MW) Construction started Electricity grid connection Commercial operation Shutdown
Net Gross
North Anna-1 Westinghouse 3-loop 903 MW 973 MW 1971-02-19 1978-04-19 1978-06-06
North Anna-2 Westinghouse 3-loop 972 MW 994 MW 1971-02-19 1980-08-25 1980-12-14
North Anna-3 (former project)[43] B&W 145 907 MW 950 MW 1971-06-01 Cancelled construction on 1982-11-01
North Anna-4 (former project)[44] B&W 145 907 MW 950 MW 1971-12-01 Cancelled construction on 1980-11-01
North Anna-3 (planned)[45][46] ESBWR 1538 MW 1594 MW

References

Template:Reflist

External links

Template:Stack Template:Sister project

Template:U.S. Nuclear Plants

  1. Script error: No such module "citation/CS1".
  2. a b Script error: No such module "citation/CS1".
  3. NRC to Issue New Reactor License to Dominion for North Anna Site | May 31, 2017
  4. a b North Anna Power Station, Unit 3 | NRC.gov
  5. a b Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".
  9. Script error: No such module "citation/CS1".
  10. Script error: No such module "citation/CS1".
  11. Script error: No such module "citation/CS1".
  12. Script error: No such module "citation/CS1".
  13. Script error: No such module "citation/CS1".
  14. https://www.nrc.gov/reading-rm/doc-collections/news/2017/17-025.pdf Template:Dead link
  15. Script error: No such module "citation/CS1".
  16. Script error: No such module "citation/CS1".
  17. Script error: No such module "citation/CS1".
  18. Script error: No such module "citation/CS1".
  19. Script error: No such module "citation/CS1".
  20. Script error: No such module "citation/CS1".
  21. Script error: No such module "citation/CS1".
  22. Department of Justice 1977 memo VEPCO fined for concealing material issue
  23. Script error: No such module "citation/CS1".
  24. Script error: No such module "citation/CS1".
  25. Script error: No such module "citation/CS1".
  26. a b c d Script error: No such module "citation/CS1".
  27. Script error: No such module "citation/CS1".
  28. Script error: No such module "citation/CS1".
  29. Script error: No such module "citation/CS1".
  30. Script error: No such module "citation/CS1".
  31. Script error: No such module "citation/CS1".
  32. "Dominion's North Anna Power Station Restores Offsite Power" Template:Webarchive Dominion news release, August 23, 2004. Retrieved 2011-08-25.
  33. Dominion Virginia Power press release Template:Webarchive August 24, 2011. Retrieved 2011-08-24.
  34. a b Dominion News, Dominion Virginia Power Begins Restart of North Anna Power Station November 11, 2011. Retrieved 2011-12-20
  35. Script error: No such module "citation/CS1".
  36. Template:Cite magazine
  37. Script error: No such module "citation/CS1".
  38. NRC, Current Power Reactor Status Report for December 20, 2011 December 20, 2011. Retrieved 2011-12-20
  39. Script error: No such module "citation/CS1".
  40. Script error: No such module "citation/CS1".Template:Cbignore
  41. Script error: No such module "citation/CS1".
  42. Script error: No such module "citation/CS1".
  43. Script error: No such module "citation/CS1".
  44. Script error: No such module "citation/CS1".
  45. Power Reactor Information System of the IAEA: „Nuclear Power Reactor Details - NORTH ANNA-3“ Template:Dead link
  46. U.S.NRC - Combined License Holders for New Reactors