Monticello Dam is a Template:Convert high concrete arch dam in Napa County, California, United States, constructed between 1953 and 1957. The dam impounded Putah Creek to create Lake Berryessa in the Vaca Mountains.

Lake Berryessa is currently the seventh-largest man-made lake in California. Water from the reservoir primarily supplies agriculture in the Sacramento Valley downstream. The dam is noted for its classic, uncontrolled morning-glory-type spillway.[1] The diameter at the lip is Template:Convert.

To the south is Putah Creek State Wildlife Area.

Statistics

File:Monticello dam from the viewpoint.jpg
The downstream face of the dam

Although the dam and its Template:Convert long reservoir are located entirely in eastern Napa County, the dam lies less than Template:Convert west of the boundary with Yolo and Solano Counties. In addition, parts of the lake's watershed extend into Lake County.

Monticello is a concrete medium thick arch dam Template:Convert high from the foundations, Template:Convert long and Template:Convert above the riverbed. The dam is Template:Convert thick at the base, tapering to Template:Convert at the crest. The total volume of construction materials is Template:Convert.[2]

The capacity of the reservoir is Template:Convert, with a full surface area of Template:Convert. The maximum operating elevation is Template:Convert; any higher water levels will flow over the dam's spillway. About Template:Convert of runoff flow into the reservoir each year from its Template:Convert watershed.[1]

The Monticello Dam Powerplant was completed in 1983 and has three generators, totaling a capacity of 11.5 megawatts (MW).[3] The powerplant is operated and maintained by the Solano Irrigation District. The electrical power is sent mostly to the North Bay area of the San Francisco Bay Area.

As of 1992, about Template:Convert, or nearly 75 percent, of the projected area was irrigable, and Template:Convert were actually irrigated in Solano County.[4]

Water is diverted Template:Convert downstream of Monticello at the Putah Diversion Dam, and distributed to farms through the Template:Convert Putah South Canal. The canal ends at Terminal Reservoir, which supplies water to the cities of Vallejo and Benicia. A 1999 contract provides for the delivery of Template:Convert of water each year for irrigation. About Template:Convert of municipal water are also supplied by the project.[5][6]

It was estimated that the dam and reservoir have prevented about $5,015,000 in flooding-related damages between 1957 and 1995.[5]

History

The dam was built as part of the Solano Project, which was intended to provide a full irrigation supply to Template:Convert of prime agricultural bottomland in Solano County and Yolo County. The project lands have been farmed since the 1840s, but irrigation was difficult due to the lack of a reliable summer water supply. The Berryessa Valley, where the dam and reservoir are located, was formerly part of Rancho Las Putas, a Template:Convert 1843 land grant to José and Sixto Berryessa, for whom the area is named. By the 1860s the rancho had been subdivided into many smaller parcels; before damming, the valley was one of California's most fertile agricultural regions, centering on the town of Monticello, with roughly 250 residents.[7][8]

File:Lake Berryessa AW.jpg
The lower section of Lake Berryessa near Portuguese Canyon, seen looking upstream

The Solano Project first took shape in the 1940s after the formation of the Solano Irrigation District to manage the water resources of Putah Creek. On November 11, 1948, the Secretary of the Interior formally authorized the project, which would be constructed by the Bureau of Reclamation. The Bureau initially intended to incorporate the project as part of its larger Central Valley Project (CVP), which would manage the combined watersheds of the Sacramento and San Joaquin rivers. However, locals strongly favored that Solano be financed and operated separately from the CVP.[7] A Senate hearing in 1953 confirmed that Solano would be constructed as an independent project.[9]

Land purchases in the future reservoir area were made in early 1953; however, landowners were allowed to stay throughout the construction period until their property was actually flooded by rising lake levels. The inhabitants of Berryessa Valley vehemently opposed the project, as did the city of Winters (one of the would-be beneficiaries of the project) because of close social ties to the town of Monticello.[9] Opponents of the big dam proposed that a series of smaller reservoirs be constructed to supply the water, but this was deemed uneconomical.[10] Most of Monticello's residents moved out by summer 1956, as rising waters approached the town. After the area was vacated, crews deforested the valley and demolished the existing buildings and infrastructure.[11] About 300 graves had to be relocated to higher ground.[7] Photographers Dorothea Lange and Pirkle Jones documented the town and its people before the town was flooded by the dam; the photographs were published in 1960.[11]

The primary construction contract was awarded to a consortium formed by Peter Kiewit Sons Co. and Parish Brothers, for construction of the main dam and relocation of California State Route 128, which ran through the Berryessa Valley. Excavation of the dam site and construction of a diversion tunnel continued through 1954, with the first concrete placed on August 9, 1955. Despite major flooding between January and May 1956, more than 90 percent of the concrete had been laid by December 1956, and the dam was topped out on November 7, 1957, at a total cost of about $37 million. This figure also includes the cost for associated downstream irrigation works and the highway relocation.[7]

The reservoir took five years to fill after construction, reaching capacity for the first time on April 18, 1963.[7] The reservoir completely inundated Monticello (though the city's ruins are visible at low water levels), and flooded Template:Convert of the surrounding Berryessa Valley. At the time, Lake Berryessa was the second-largest volume reservoir in California, after Shasta.

The Bureau of Reclamation operates five recreational areas around the lake, providing boat ramps and day-use facilities.[12] Recreational use has been declining since 2008. This area has been burdened with the rough bureaucratic past due to what has been experienced since 2008 when Bureau of Reclamation tried to Install Pensus Inc. to run all of the existing resorts except pleasure cove and failed to do so successfully at the expense of those who live in the area. Eventually raising the white flag to Napa county in 2021 to try and solve the problem.

Local resorts did not have the option to renew contracts, as a part of BORs uncontrolled power over the region most operators were forced to leave against their will and were not properly compensated for improvements made to the resorts around the lake. Instead BOR demolished the resorts so they could claim they were from scratch sites. As many as 1.3 million visitors used to visit the lake each year, now that number is less than 400,000. The reduction in tourism has caused economic collapse of the surrounding area; as a result many residents have moved away, unable to keep up with the increase in utilities from the closure of the resorts.[13]

Spillway

File:Lake Berryessa overflowing into Glory Hole spillway at Monticello dam.jpg
Lake Berryessa overflowing into the Glory Hole spillway.
File:Monticellodamgloryhole2009-10-10.JPG
Spillway on October 10, 2009, when the water was 32.24 feet (9.83 m) below the crest.
File:Glory Hole, Lake Berryessa.jpg
The spillway at Monticello Dam in operation, February 19, 2017.

The dam's morning-glory-type spillway, known as the Glory Hole,[14] is Template:Convert in diameter at lake level and narrows down to about Template:Convert at the exit. At the lake's peak level, the spillway can drain Template:Convert, which occurs when the lake level rises to Template:Convert above the level of the funnel.

Water spills over its lip when the lake reaches Template:Convert and a reservoir elevation of Template:Convert above sea level. The last time the reservoir spilled through the glory hole was on February 10, 2025.[15] Previously a natural spill occurred on the afternoon of February 26, 2019.

Prior to that, the last time the spillway was active was February 16, 2017. After a number of storms had caused the lake level to rise Template:Convert since January 1, 2017, the reservoir was on the cusp of spilling once again at Template:Convert.[16] Eager to witness this event, a number of local boaters and recreation enthusiasts generated enough wake to cause the reservoir to spill, albeit briefly, at 1:45 p.m. on February 13, 2017. Lake Berryessa reservoir filled and ran into its glory hole spillway for the first time in over a decade on February 16, 2017, at approximately 3:00 p.m. PST .[17]

Swimming near the Glory Hole is prohibited.[18]Template:Better source needed The only known case of death from the spillway drain occurred in 1997. Emily Schwalen of Davis died after being caught in the current while swimming near the Glory Hole and being swept down the pipe, after holding on to the rim for about 20 minutes.[14][19]

Environmental impacts

The Lower Putah Creek Coordinating Committee (LPCCC) worked on a Watershed Management Action Plan which concluded the effects of Monticello Dam on the geomorphology of Putah Creek and other connected hydrology systems. A comparison of the creek before and after the project showed ground water was recharged less, sandbars were deteriorated, and bed level lowering in channel decreased the population dynamics of cottonwood and willow.[20] 

See also

References

Template:Reflist

Sources

Template:Refbegin

Template:Refend

External links

Template:Sister project

Template:Portal bar Template:Authority control

  1. a b Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. Script error: No such module "citation/CS1".
  5. a b Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. a b c d e Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".Template:Dead link
  9. a b Script error: No such module "citation/CS1".
  10. Script error: No such module "citation/CS1".
  11. a b Script error: No such module "citation/CS1".
  12. Script error: No such module "citation/CS1".
  13. Script error: No such module "citation/CS1".
  14. a b Script error: No such module "citation/CS1".
  15. Script error: No such module "citation/CS1".
  16. Script error: No such module "citation/CS1".
  17. Script error: No such module "citation/CS1".
  18. Script error: No such module "citation/CS1".
  19. Script error: No such module "citation/CS1".
  20. Script error: No such module "citation/CS1".