Script error: No such module "Type in location".Script error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters".Expression error: Unexpected < operator. The Mingachevir Dam (Mingachevir Hydro Power Station) is an earth-fill embankment dam on the Kura River just north of Mingachevir in Azerbaijan. It serves several purposes, including hydroelectric power production and water storage for irrigation.[1] The Mingachevir reservoir, behind the dam, supplies water to the Upper Qarabag and Upper Sirvan channels which help irrigate about Script error: No such module "convert". of farmland in the country. Its six Francis turbine-generators were overhauled or replaced with Script error: No such module "convert". sets in 2000.[2] Mingachevir reservoir has a storage capacity of Script error: No such module "convert"., covering Script error: No such module "convert".. The length of the dam is Script error: No such module "convert"., its width is Script error: No such module "convert". and height is Script error: No such module "convert"..[3] It is the largest hydroelectric power station in the South Caucasus.
History
The construction of the station started in 1945, the first hydro aggregate was put into operation in 1953. The main turbines were originally from the Japanese-built Fengman Hydropower Station in Manchukuo (now Northeast China), captured by the Red Army during the invasion of Manchuria in 1945.[4] In 1954, the station was put into operation with full capacity.
A large number of people came from different regions of Azerbaijan due to the installation of Mingachevir hydroelectric power station. In total 20,000 people took part in the construction of the power station. Approximately 10,000 German prisoners of war were involved in the installation towards the end of the 1940s. [5]
President Aliyev participated in the ceremony of commissioning of Mingachevir hydroelectric power station after reconstruction on February 27, 2018. All hydro generators and hydro turbines of the station were replaced with new ones within the framework of the reconstruction. As a result, the production capacity of the power station was increased from 284 MW to 424 MW. [5]
Technical parameters
The capacity of the Mingachevir HPP is 359 MW which has 6 hydroaggregates. Average annual electric power production is 1.4 billion kWh.
Water intersection includes concrete dam consisting of 3 holes (width of 30 m with an open channel), water intake facility to pressured water pipes consisting of 6 holes (length of 66 m), dam of land (Length 1550 m, height 80 m), device with 1 hole that intakes water to Upper Garabagh and Upper Shirvan canal. [6]
See also
References
<templatestyles src="Reflist/styles.css" />
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".Script error: No such module "Unsubst".
- ↑ Template:Cite thesis
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
Script error: No such module "Check for unknown parameters".
External links
<templatestyles src="Stack/styles.css"/>
Script error: No such module "Check for unknown parameters".