The Magistrale for Europe[1][2] (German: Magistrale für Europa;[3] French: Magistrale européenne[4]) or Main Line for Europe[5] is a Trans-European Transport Networks (TEN-T) project for the creation of a high-speed railway line between Paris and Bratislava, with a branch-off to Budapest.[1] It was listed as TEN project No. 17 (Paris—Bratislava) by the European Commission in 1995, and is already under way.[6]

The project was planned to be completed by 2020, however the entire project has not been delivered on time, with only some of the sections running. It will link 34 million people in five European countries. The overall length of the route from Paris to Budapest is Script error: No such module "convert"..

Sections

Template:Magnify iconDetail from the map of Europe's high-speed rail lines (colored), where can be seen the Main Line for Europe's route (Paris-Strasbourg-Stuttgart-München-Salzburg-Linz-Wien-Bratislava-Budapest) and its current maximum operational speed. <templatestyles src="Legend/styles.css" />
   Max operational speed 310-320 km/h
<templatestyles src="Legend/styles.css" />
   Max operational speed 270-300 km/h
<templatestyles src="Legend/styles.css" />
   Max operational speed 240-260 km/h
<templatestyles src="Legend/styles.css" />
   Max operational speed 200-230 km/h
<templatestyles src="Legend/styles.css" />
   Under construction for max operational speed ≥ 200 km/h
<templatestyles src="Legend/styles.css" />
   Max operational speed < 200 km/h

Parts of the route were formerly served by Orient Express trains, which ceased operations in 2009. Today TGV rail connections exist from Paris to Stuttgart or at longest Munich. The Austrian Federal Railways (ÖBB) currently provide direct Railjet and EuroNight connections between Munich and Budapest in addition to direct Nightjet connection between Vienna and Paris since December 2021.

France

File:Paris-Gare de l'Est-2009.jpg
Paris Gare de l'Est

The French part of the line is the LGV Est européenne high-speed railway. Its first section as far as Baudrecourt east of Metz has been in use since 2007 whilst the second section to Vendenheim near Strasbourg opened in July 2016.[7] The new railway line provides a maximum speed up to Template:Cvt and reduced the travel time from Gare de Paris-Est to the largely refurbished Gare de Strasbourg to Template:TimeHMS.[8][4]

Germany

In Germany, the line follows the Appenweier–Strasbourg railway (Europabahn) from the Rhine Bridge to Appenweier and then the Mannheim–Karlsruhe–Basel railway (Rheintalbahn) down to Bruchsal. The Europabahn is built for a maximum speed of Template:Cvt, while the Rheintalbahn to Rastatt Süd is for Template:Cvt. The second part of the new Rheintalbahn (Rastatt Süd to Bruchsal) is to be completed by 2014Template:Update inline. At the Bruchsal Rollenberg junction the MoE joins the Mannheim–Stuttgart high-speed railway which was built for Template:Cvt. Stuttgart Hauptbahnhof is currently being rebuilt (scheduled for completion in 2025) as a through station in the course of the controversial Stuttgart 21 project.[2] Despite some protests, a 2011 statewide referendum upheld the majority support and thus the political decision to rebuild the station and let the Magistrale for Europe project proceed.[2]

File:StuttgartHauptbahnhofNordfluegel 2010-08-26.jpg
Demolition works on Stuttgart Hauptbahnhof, 2010

In Stuttgart, the line joins the Stuttgart–Augsburg new and upgraded railway (including the Stuttgart–Wendlingen and Wendlingen–Ulm high-speed railway lines replacing the Fils Valley Railway), which Wendlingen- Ulm section is completed at the end of 2022 and provides a maximum speed of Template:Cvt between Stuttgart and Ulm and Template:Cvt on the Ulm–Augsburg railway line. The Munich–Augsburg railway is being upgraded to separate slower traffic (freight and short-distance trains) from high speed trains, which will be able to reach Template:Cvt. From München-Pasing station trains may run directly to München Ost without passing München Hauptbahnhof. Plans for the reconstruction of the Munich main station similar to Stuttgart 21 have been abandoned.

Trains from München Ost shall reach Salzburg Hauptbahnhof via the upgraded Munich–Mühldorf railway, providing a maximum speed of Template:Cvt, and the Mühldorf–Freilassing railway line. In Freilassing the MoE joins the Rosenheim–Salzburg railway leading across the Austrian border including a new third track serving the Salzburg S-Bahn commuter network.

Austria

File:Wien 10 Hauptbahnhof a.jpg
Vienna main station, 2012

In Austria, the Western Railway line was extended to reduce travel time between Munich, Salzburg, Linz, and Vienna to one hour each. The section between the Attnang-Puchheim rail hub and Wels Hauptbahnhof near Linz was already upgraded until October 2012 to provide a maximum speed of Template:Cvt. Between Linz and Vienna a new parallel high-speed railway line (Neue Westbahn) for a maximum speed of Template:Cvt was completed in 2015, including the Wienerwald Tunnel.

In Vienna, the former Südbahnhof terminal station was demolished and replaced by the new Wien Hauptbahnhof. From here, trains run on the Eastern Railway line to Bratislava-Petržalka railway station, including a connection to Vienna International Airport. East of Vienna, a southeastern branch-off leads via Győr to Budapest.

Route

Section Distance Opening Duration before1 Recent duration1 Planned duration1
Paris–Strasbourg 440.2 km[9] Paris–Baudrecourt 2007 237 min (ø 127 km/h) 105 min (ø 252 km/h)[8] -
Baudrecourt–Vendenheim 2016
Strasbourg–Karlsruhe 81.6 km[10] a portion (Appenweier-Karlsruhe) is in use now 40 min (ø 122 km/h) 25 min (ø 194 km/h)
Karlsruhe–Stuttgart 90 km in use 61 min (ø 89 km/h) 35 min (ø 154 km/h) 35 min (ø 154 km/h)
Stuttgart–Ulm 25.2 km Stuttgart–Wendlingen high-speed railway 2025[3] 54 min (ø 104 km/h)[3] 28 min (ø 174 km/h)[3]
60 km[11] Wendlingen–Ulm high-speed railway 2022[12]
Ulm–Augsburg 85 km Ulm–Augsburg railway upgrade 2025[3] 41 min (ø 126 km/h) 26 min (ø 198 km/h)
Augsburg–Munich 61 km 2011 37 min (ø 99 km/h) 18 min (ø 203 km/h)
Munich–Mühldorf–Salzburg
(northern line, 155.3 km)
85 km Munich–Mühldorf upgrade 87 min (ø 106 km/h) 62 min (ø 148 km/h)
65 km Mühldorf–Freilassing upgrade
5 km Freilassing–Salzburg upgrade 2009
Munich–Rosenheim–Salzburg
(southern line, 153.5 km)
65 km Munich–Rosenheim upgrade ? min (ø ? km/h) ? min (ø ? km/h)
82 km Rosenheim–Freilassing upgrade
5 km Freilassing–Salzburg upgrade 2009
Salzburg–Linz 127 km Salzburg–Attnang-Puchheim 2013 64 min (ø 119 km/h) 60 min (ø 127 km/h)
Attnang-Puchheim–Wels 2011
Wels–Linz (Linz–Marchtrenk)[13] 2028
Linz–St. Pölten 130 km Doubling to 4 tracks 2024–2030[14] 48 min (ø 163 km/h) 44 min (ø 177 km/h)
St.Pölten-Vienna 44 km 2012 41 min (ø 64 km/h) 25 min (ø 106 km/h)
Vienna–Budapest 263 km 181 min (ø 87 km/h)
Vienna–Marchegg–Bratislava
(northern line)
65 km Marchegger Ostbahn upgrade 2025[15][16]
Bratislava–Marchegg railway line upgrade[17]
65 min[18] 57 min (ø 68 km/h) 40 min[18] (ø 111 km/h)
Vienna–Parndorf–Bratislava
(southern line)
80 km 2013 55 min (ø 87 km/h)
total:
Paris–Budapest 1562 km 722 min (12:02)1 2 (ø 132 km/h) 614 min (10:14)1 2 (ø 155 km/h)
Paris–Bratislava (northern line) 1364 km 598 min (9:58)1 2 (ø 140 km/h) 468 min (7:40)1 2 (ø 178 km/h)
Paris–Bratislava (southern line) 1379 km 488 min (8:08)1 2 (ø 173 km/h)
Paris–Munich 843 km 484 min (8:04)1 2 (ø 108 km/h) 317 min (5:17) 1 (ø 166 km/h) 242 min (4:02) 1 (ø 216 km/h)

1 It is calculated with the fastest possible durations between the towns.
2 Real duration is longer due to changing.

Source (unless stated otherwise): annual report 2006/07 of Péter Balázs

See also

Script error: No such module "Portal".

References

<templatestyles src="Reflist/styles.css" />

  1. a b Script error: No such module "citation/CS1".
  2. a b c Script error: No such module "citation/CS1".
  3. a b c d e Script error: No such module "citation/CS1".
  4. a b Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1". (14.4 MB, axis No 17, p44)
  7. Script error: No such module "citation/CS1".
  8. a b Infos horaires train Paris-Strasbourg on the sncf-connect website (22 April 2025).
  9. The length of the high-speed Paris-Strasbourg line is 440.2 km (22.703 km of classical line from Paris-Est to the junction with the LGV + 406 km LGV Est + 11.5 km from the Strasbourg station to the junction with the LGV), compared with 502 km for the classical line.
  10. 21.3 km Strasbourg - Appenweier Nord (Abzw) on the Appenweier–Strasbourg railway + 39.537 km Appenweier Nord (Abzw) - Rastatt on the Mannheim–Karlsruhe–Basel railway + 20.783 km Rastatt - Karlsruhe Hbf on the Rhine Railway.
  11. Script error: No such module "citation/CS1".
  12. Script error: No such module "citation/CS1".
  13. Script error: No such module "citation/CS1".
  14. Script error: No such module "citation/CS1".
  15. Script error: No such module "citation/CS1".
  16. Script error: No such module "citation/CS1".
  17. Script error: No such module "citation/CS1".
  18. a b Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

Template:Magistrale for Europe Template:Trans-European Transport Networks