Lucknow Metro

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Script error: No such module "Unsubst".

Template:Use Indian EnglishScript error: No such module "Unsubst". Script error: No such module "Infobox".Script error: No such module "Check for unknown parameters".

The Lucknow Metro is a mass rapid transit (MRT) system in Lucknow, Uttar Pradesh, India. The metro is owned and operated by the Uttar Pradesh Metro Rail Corporation (UPMRC). The frequency of the metro's services is around 5 - 7 minutes.[1][2]

Along with Delhi Meerut RRTS, Meerut Metro, Noida-Greater Noida Metro, Kanpur Metro and Agra Metro, it is one of the 5 operational metro networks in Uttar Pradesh.

It is the 3rd largest urban transit system in Uttar Pradesh after Delhi Meerut RRTS and Noida Metro.

Construction of the Phase 1A line began on 27 September 2014 with the Script error: No such module "convert". stretch from Template:Stl to Template:Stl which began its commercial operation on 5 September 2017.[1] Full operation on Red Line stretch from Template:Stl to Template:Stl began operation on 9 March 2019. The Lucknow metro project is the most expensive transport system in Uttar Pradesh to date with an estimated total cost for Phase 1A (Red Line) and 1B (Blue Line) of about $2 billion, of which Template:Indian rupee6,928 crore ({{INRConvert/Expression error: Unrecognized punctuation character "[".|6928|7||USD|year={{{year}}}}}) was spent on phase 1A.[3]

The Government of Uttar Pradesh Approved the construction of the 11.165 km long East-West Corridor between Template:Stl to Template:Stl, Phase 1B Blue Line at an estimated budget of Template:Indian rupee5,881 crore ({{INRConvert/Expression error: Unrecognized punctuation character "[".|5881|7||USD|year={{{year}}}}}) in January 2024.[4][5][6]

Lucknow Metro achieved its highest ever ridership of 1.30 lakh passengers since its inception in 2017 on 1 January 2024 which surpassed the previous record of 93,237 passengers set on 25 December 2023.[7]

History

The original design of the metro project included one north-south and one east-west corridor, with links through Gomti Nagar. Estimated costs for the north-south corridor were Template:Indian rupee5,413 crore ({{INRConvert/Expression error: Unrecognized punctuation character "[".|5413|7||USD|year=2011}}), Template:Indian rupee3,611 crore ({{INRConvert/Expression error: Unrecognized punctuation character "[".|3611|7||USD|year=2011}}) for the east-west corridor and Template:Indian rupee495 crore ({{INRConvert/Expression error: Unrecognized punctuation character "[".|495|7||USD|year=2011}}) for the link through Gomti Nagar.[8] The initial layout of the east-west corridor started from Rajajipuram and ended at Hahnemann, after passing through Gomti Nagar via Hazratganj and Patrakarpuram, a distance of Script error: No such module "convert".. However, in 2010 the design was changed so the corridor started from Vasant Kunj and terminated at Charbagh, a revised distance of Script error: No such module "convert"..[9]

The design of north–south corridor had two elevated sections, with a total distance of Template:Cvt, separated by a Template:Cvt. The length of the ramps between the elevated and below ground sections would total Template:Cvt. When completed, the corridor would run for a total distance of Script error: No such module "convert". and connect Amausi airport to Munshipulia.[10][11] Passengers would be served by a total of 22 stations, with 19 elevated and 3 below ground.[12] Elevated stations were to be located at Template:Stl, Template:Stl, Template:Stl, Template:Stl, Template:Stl, Template:Stl, Template:Stl, Template:Stl, Template:Stl, Template:Stl. Following Charbagh station, the line descends underground where Template:Stl, Template:Stl (Uttar Pradesh Secretariat) and Template:Stl stations are located. The line then returns above ground for the remaining stations of the corridor, Template:Stl, Template:Stl, Template:Stl, Template:Stl, Template:Stl, Template:Stl, Template:Stl and the terminus at Template:Stl.[13]

The metro could accommodate speeds up to Template:Cvt but the typical usage would be at speeds of Template:Cvt for the north–south corridor and Template:Cvt for the east–west corridor. Originally, the metro trains were to be housed in one of two depots, a Script error: No such module "convert". depot at Vasant Kunj and another at the airport, but due to security concerns the airport depot was removed from the plan.[14]

In 2013, a report published by the Department of Housing and Urban Planning of the Government of Uttar Pradesh resulted in major changes to the metro project. The two corridor design was scrapped and replaced with one featuring a denser network of connectivity. This revision resulted in the layout of route being entirely elevated with no underground sections. The increased coverage of the metro would raise the cost of the project but reduced the operating cost per km. The reduction in operating cost is impacted by the difference in construction costs of the line itself, one km of overhead track costs Template:Indian rupee180 crore ({{INRConvert/Expression error: Unrecognized punctuation character "[".|180|7||USD|year={{{year}}}}}) as compared to Template:Indian rupee550 crore ({{INRConvert/Expression error: Unrecognized punctuation character "[".|550|7||USD|year={{{year}}}}}) for an underground track. The underground design also raised concerns about safety as well as increased energy consumption. The report also proposed the construction of an elevated Bus Rapid Transit System (BRTS) as a feeder service to the metro.[15]

Project timeline

Red Line

Blue Line

  • August 2019: Modified DPR is yet to be approved by state government and also LMRC is yet to get land for Metro deport which is to come up near upcoming Template:Stl.[49]
  • January 2024: The Government of Uttar Pradesh Approved the construction of 11.165 km long East-West Corridor between Template:Stl to Template:Stl, Blue Line which is also known as Phase 1B, at an estimated budget of Template:Indian rupee5,881 crore ({{INRConvert/Expression error: Unrecognized punctuation character "[".|5881|7||USD|year={{{year}}}}}) in January 2024 with an expected completion timeline of 2029.[50][51]

Route network

Phase 1

In Phase 1, 21 metro stations were built on the Red Line from CCS Airport to Munshipulia and 12 metro stations will be built on the Blue Line from Charbagh to Vasant Kunj.[52][53]

Line Name Terminals Length Stations
style="background:#Template:Rcr; text-align: center;"|Red Line Template:Stl Template:Stl Script error: No such module "convert". 21
style="background:#Template:Rcr; text-align: center;"|Blue Line Template:Stl Template:Stl Script error: No such module "convert". 12
Total Script error: No such module "convert". 33

Current phases

Phase 1
Line Name Terminals Length Stations Opening Date
rowspan="3" style="background:#Template:Rcr; text-align: center;"|Red Line Template:Stl Template:Stl Script error: No such module "convert". 2 8 March 2019
Template:Stl Template:Stl Script error: No such module "convert". 8 5 September 2017
Template:Stl Template:Stl Script error: No such module "convert". 11 8 March 2019
style="background:#Template:Rcr; text-align: center;" |Blue Line Template:Stl Template:Stl[54] Script error: No such module "convert". 12 2029
Total Script error: No such module "convert". 33

Current status

Script error: No such module "Labelled list hatnote".

Lucknow Metro
Line Name First Operational Last Extension Station Length Terminal Rolling Stock Track Gauge (mm) Electrification
style="background:#Template:Rcr; text-align: center;" | Red Line 5 September 2017 8 March 2019 21 Script error: No such module "convert". CCS Airport Munshi Pulia Alstom 1435 Script error: No such module "val". (OHE)

Funding

Over 50% of the Lucknow Metro rail project is funded through external debt from European Investment Bank.[21][55] The Lucknow Metro has its own operating body, the Lucknow Metro Rail Corporation, is a Special Purpose Vehicle (SPV) and a 50:50 Joint Venture set-up by the Government of India and Government of Uttar Pradesh.[30][21] LMRC is headquartered in Vipin Khand, Gomti Nagar, Lucknow.[56]

Infrastructure

Rolling stock

On 5 October 2015, Alstom was awarded a Template:Indian rupee1,102 crore ({{INRConvert/Expression error: Unrecognized punctuation character "[".|1102|7||USD EUR|year=2015}}) contract to construct twenty four car EMU for Phase 1A, based on their Metropolis design. The vehicles are to be constructed at Alstom's factory in Sricity, Andhra Pradesh.[57][58]

File:Lucknow metro Coach.jpg
Inside view of a coach of Lucknow Metro Manufactured by Alstom

Station facilities

WiFi is available at each station with free access for smart card holders. Other services include free purified drinking water and free toilets.[59][60]

The north–south corridor of the Lucknow Metro uses an automated fare collection (AFC) system, provided by Datamatics.[61]

File:Singar Nagar Metro Station.jpg
Typical view of platform of Lucknow Metro (In picture Template:Stl station)

Security

Lucknow Metro's security is based on a hybrid model. The Lucknow City Police, which has raised a dedicated squad of 393 personnel for this purpose from PAC, provides general security, which includes frisking, scanning, maintaining and having quick response teams (QRT) as per security norms,[62][63][64] while a private security agency provides operational security, which including maintaining hygiene of the station and ensuring that people queue properly.[62][63][64]

Personnel from the PAC were especially trained for providing security by the Central Industrial Security Force (CISF) in New Delhi.[65][66]

Apart from this, CCTV and metal detectors are installed at every metro station.[67]

Ticketing and recharge

Smart Cards and Tokens are available from Ticket Counters for travelling.

Ridership

The cumulative ridership of the metro rail in Lucknow crossed 1 million in the first 70 days of commercial operation;[68] the rapid-transit system received 31,688 passengers on its inaugural day of services, and recorded a ridership of 41,075 on 10 September.

As of June 2018Script error: No such module "Check for unknown parameters"., the daily ridership of Lucknow Metro ranges between 10,000 and 11,000;[69][70] with monthly ridership being 480,000 in September 2017, 400,000 in October 2017, 300,000 in November and December 2017, and around 300,000 in January, February, March and April 2018. As of 2019, as many as 60,000 people are using metro service on a daily basis in Lucknow.[71]

Lucknow Metro achieved its highest ever ridership of 1.30 lakh passengers since its inception in 2017 on 1st January 2024 which surpassed the previous record of 93,237 passengers set on 25th December 2023. [72]

In popular culture

In January 2017, Hindi film Behen Hogi Teri became the first film to shoot scenes on the metro premises.[73]

Awards

  • Lucknow Metro was awarded 2nd Place for 'Best Metro for Excellence in Innovative Designs' at 5th Annual Metro Rail Summit in New Delhi behind the Delhi Metro. It competed against the other metro projects of the country like Mumbai Metro, Jaipur Metro etc.[74]
  • Lucknow Metro Rail Corporation (LMRC) was awarded the European Society for Quality Research (ESQR) Choice Prize Award 2016 under the Gold category,[75] a vanity award.
  • Lucknow Metro Rail Corporation won the Dun & Bradstreet Infra Award in 2017 in the Metro Rail category  for completing "Priority Corridor" of the North –South Corridor (Phase 1A) and commissioning the project in a record time of less than three years. .[76][77]
  • Lucknow Metro Rail Corporation won the International 'Royal Society for the Prevention of Accidents' (RoSPA) Award. LMRC was given the Silver Award for its Phase 1A (North-South Corridor) in the Project/Infrastructure category for the year 2018.[78]
  • Lucknow Metro Rail Corporation was certified with the highest green rating (i.e. the Platinum Rating) by the Indian Green Building Council (IGBC).[79]
  • Lucknow Metro Rail Corporation has International Organization for Standardization (ISO) 14001: 2004 & Occupational Health & Safety Assessment Series (OHSAS) 18001: 2007 certificates in recognition of the organisation's integrated management system in compliance with ISO & OHSAS standards and requirements.[80]
  • Lucknow Metro Rail Corporation was awarded the "Best Urban Mass Transit" project during the 10th Urban Mobility India Conference & Exhibition and CODATU XVII Conference under Ministry of Housing and Urban Affairs at Hyderabad, Telangana in November 2017.[81]
  • Lucknow Metro Rail Corporation's managing director, Kumar Keshav,[82] was awarded with the 'Shaan-E-Lucknow' award by the organisers of the Lucknow Book Fair and a special postal envelope cover bearing the logo, symbol and mnemonic of Lucknow Metro was released.[83]
  • Lucknow Metro Rail Corporation won the first Dr APJ Abdul Kalam Memorial Award on Innovation in governance on 15 October 2016.[84]

Network map

Template:Rapid transit OSM map

See also

<templatestyles src="Div col/styles.css"/>

Template:Portal bar

References

<templatestyles src="Reflist/styles.css" />

  1. a b Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".
  3. a b Script error: No such module "citation/CS1".
  4. Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".
  9. Script error: No such module "citation/CS1".
  10. Script error: No such module "citation/CS1".
  11. Script error: No such module "citation/CS1".
  12. Script error: No such module "citation/CS1".
  13. Script error: No such module "citation/CS1".
  14. Script error: No such module "citation/CS1".
  15. Script error: No such module "citation/CS1".
  16. Script error: No such module "citation/CS1".
  17. a b Script error: No such module "citation/CS1".
  18. a b Script error: No such module "citation/CS1".
  19. a b Script error: No such module "citation/CS1".
  20. Script error: No such module "citation/CS1".
  21. a b c d e Script error: No such module "citation/CS1".
  22. Script error: No such module "citation/CS1".
  23. Script error: No such module "citation/CS1".
  24. Script error: No such module "citation/CS1".
  25. Script error: No such module "citation/CS1".
  26. Script error: No such module "citation/CS1".
  27. Script error: No such module "citation/CS1".
  28. Script error: No such module "citation/CS1".
  29. Script error: No such module "citation/CS1".
  30. a b c Script error: No such module "citation/CS1".
  31. http://timesofindia.indiatimes.com/entertainment/events/lucknow/Lucknow-metro-begins-work-on-Faizabad-Road-does-Bhoomi-puja-for-remaining-corridor/articleshow/54965101.cms Script error: No such module "Unsubst".
  32. Script error: No such module "citation/CS1".
  33. Script error: No such module "citation/CS1".
  34. Script error: No such module "citation/CS1".
  35. Script error: No such module "citation/CS1".
  36. Script error: No such module "citation/CS1".
  37. Script error: No such module "citation/CS1".
  38. Script error: No such module "citation/CS1".
  39. Script error: No such module "citation/CS1".
  40. Script error: No such module "citation/CS1".
  41. Script error: No such module "citation/CS1".
  42. Script error: No such module "citation/CS1".
  43. Script error: No such module "citation/CS1".
  44. Script error: No such module "citation/CS1".
  45. Script error: No such module "citation/CS1".
  46. Script error: No such module "citation/CS1".
  47. Script error: No such module "citation/CS1".
  48. Script error: No such module "citation/CS1".
  49. Script error: No such module "citation/CS1".
  50. Script error: No such module "citation/CS1".
  51. Script error: No such module "citation/CS1".
  52. Script error: No such module "citation/CS1".
  53. Script error: No such module "citation/CS1".
  54. Script error: No such module "citation/CS1".
  55. Script error: No such module "citation/CS1".
  56. Script error: No such module "citation/CS1".
  57. Script error: No such module "citation/CS1".
  58. Script error: No such module "citation/CS1".
  59. Script error: No such module "citation/CS1".
  60. Script error: No such module "citation/CS1".
  61. Script error: No such module "citation/CS1".
  62. a b Script error: No such module "citation/CS1".
  63. a b Script error: No such module "citation/CS1".
  64. a b Script error: No such module "citation/CS1".
  65. Script error: No such module "citation/CS1".
  66. Script error: No such module "citation/CS1".
  67. Script error: No such module "citation/CS1".
  68. Script error: No such module "citation/CS1".
  69. Script error: No such module "citation/CS1".
  70. Script error: No such module "citation/CS1".
  71. Cite error: Script error: No such module "Namespace detect".Script error: No such module "Namespace detect".
  72. Script error: No such module "citation/CS1".
  73. Script error: No such module "citation/CS1".
  74. Script error: No such module "citation/CS1".
  75. Script error: No such module "citation/CS1".
  76. Script error: No such module "citation/CS1".
  77. Script error: No such module "citation/CS1".
  78. Script error: No such module "citation/CS1".
  79. Script error: No such module "citation/CS1".
  80. Script error: No such module "citation/CS1".
  81. Script error: No such module "citation/CS1".
  82. Script error: No such module "citation/CS1".
  83. Script error: No such module "citation/CS1".
  84. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

Script error: No such module "Side box". Template:Wikivoyage

Template:Rapid transit in India Script error: No such module "Navbox". Template:Lucknow Metro Stations Template:Rapid transit in Asia [[Category:Template:Resolve category redirect]]Template:Coord missing/CheckCat

Script error: No such module "Authority control".