This is a list of electricity-generating power stations in the U.S. state of Indiana, sorted by type and name. In 2023, Indiana had a total summer capacity of 26,578 MW through all of its power plants, and a net generation of 90,046 GWh.[1] In 2024, the electrical energy generation mix was 42.8% coal, 40.5% natural gas, 10.3% wind, 3.3% solar, 1.8% other gases, 0.5% hydroelectric, 0.2% biomass, 0.1% petroleum, and 0.5% other.[2]
GridInfo maintains a directory of power plants in Indiana using data from the U.S. Energy Information Administration.[3]
Coal-fired
| Name | Location | Act. units |
Stacks | In service dates |
Unit capacity (2009) |
Nameplate capacity (2009 MW) |
Owner type | Owner(s) (2009) |
Closure date |
|---|---|---|---|---|---|---|---|---|---|
| A.B. Brown |
Posey Co. / Vand. Co. |
4 | 4 | 1 1979 2 1986 3 1991 4 2002 |
1 & 2 265 MW 3 & 4 88.2 MW |
707 | Large corporation |
Vectren | |
| Cayuga | Cayuga | 2 | 3 | 1 1970 2 1972 |
1 531 MW 2 531 MW |
1,062 | Large corporation |
Duke Energy Indiana | 2028 |
| Clifty Creek |
Madison | 6 | 3 | 1-5 1955 6 1956 |
All 6: 217 MW | 1,303 | Conglomerate | Ohio Valley E.C. | |
| Crawfordsville Mun. |
Crawfordsville | 3 | 3 | 1 1955 2 1965 3 1994 (petroleum) |
1 11.5 MW 2 12.6 MW 3 0.8 MW |
19.5 (2021) | City utility |
Crawfordsville E.L.&P. | 2021 (unit 2) |
| F.B. Culley | Newburgh | 2 | 3 | 1 1955 2 1966 3 1973 |
1 46 MW 2 104 MW 3 265 MW |
369 (2021) | Large corporation |
Vectren | 2006 (Unit 1) 2025 (Unit 2)[4] |
| Gibson | Northwestern Gibson County |
5 | 4 | 1 & 2 1976 3 & 4 1979 5 1982 |
All 5: 667 MW | 3,339 (2021) | Large corporation, franchised |
D.E.I. 100%1-4 90.3% 5 See Gibson G.S. for details |
2026 (Unit 4) 2034 (Units 3 & 5) 2038 (Units 1 & 2)[5] |
| Logansport | Logansport | 2 | 1 | 1 1958 2 1964 |
1 18 MW 2 25 MW |
43 | City utility |
Logansport Municipal Utility | |
| Merom | Merom | 2 | 1 | 1 1982 2 1983 |
Both: 540 MW | 1,080 | Large corporation | Hallador Energy Company[6] | |
| Michigan City |
Michigan City | 1 | 1 | 1974 | 540 MW | 540 | Large corporation |
NIPSCO | 2028 |
| Petersburg | Petersburg | 7 | 4 | 1 1967
IC1-3 1967 2 1969 |
1 282 MW
IC1-3 2.7 MW 2 523 MW |
2,155 (2021) | Large corporation |
AES / AES Indiana | 2021 (Unit 1)[7]
2023 (Unit 2) |
| Rockport | Rockport | 2 | 2 | 1 1984 2 1989 |
Both: 1,300 MW | 2,600 | Large corporation |
Indiana - Michigan Power | 2028 (Unit 1)[8][9] 2028 (Unit 2)[10] |
| R.M. Schahfer |
Wheatfield | 6 | 6 | 14 1976 15 1979 3 1983 4 1986 |
14 540 MW 15 556 MW 3 & 4 423 MW |
2,201 (2021) | Large corporation |
NIPSCO | Units 14 and 15 closed in October 2021.[11] 2023 (Units 17 and 18). |
| Warrick | Newburgh | 4 | 3 | 1 1960 2 1964 3 1965 4 1970 |
1, 2, & 3 144 MW 4 323 MW |
755 | 95% franchised |
Vectren to Alcoa's Newburgh Smelter |
|
| Whitewater Valley |
Richmond | 2 | 1 | 1 1955 2 1973 |
1 33.0 MW 2 60.9 MW |
93.9 | City utility |
Richmond Power & Light | |
| Totals: | 15 plants | 46 |
72 | ------- | ------- | 21,402.5 | ------- | 16 utility corps 1 co-op consortium 2 universities 1 smelter |
| Closed/converted | |||||||
|---|---|---|---|---|---|---|---|
| Name | Location | In service
dates |
Unit capacity | Nameplate | Owner type | Owner(s) | Closure date |
| Bailly | Chesterton | 1 1962
2 1968 |
1 190 MW
2 413 MW |
604 | Large
corporation |
NIPSCO | 2018[12] |
| Breed | Fairbanks Twp, Sullivan Co, Indiana | 1960 | 496 MW | Large Corporation | Indiana - Michigan Power | 1994 | |
| Eagle Valley | Martinsville | 1 1951 2 & 3 1953 4 1956 |
1 50 MW 2 & 3 69 MW 4 114 MW |
302 | Large corporation |
AES / AES Indiana | Converted to natural gas in 2018.[13] |
| Gallagher | New Albany | 1 1958 2 1959
3 1960 4 1961 |
2 & 4 280 MW | 600 | Large
corporation |
Duke Energy Indiana | 2012 (Units 1 & 3)
2021 (Units 2 & 4)[14] |
| Harding St./(former E.W. Stout) | South Side | 1 1958 2 1961
3 1973 4 2001 |
1 & 2 114 MW
3 & 4 471 MW |
1,170 | Large
corporation |
AES Indiana | Converted to natural gas in 2016.[15] |
| Jasper | Jasper | 1968 | 14.5 MW | 14.5 | City
utility |
Jasper M.E.U. | |
| D.H. Mitchell | Gary | 1 & 2 1958
3 1970 |
All 3 128 MW | 384 | Large
corporation |
NIPSCO | 2001[16] |
| Frank E. Ratts | Petersburg | Both 1970 | Both 117 MW | 233 | R.E.M.C. | Hoosier Energy | 2015[17] |
| State Line | Hammond | 1 & 2 1955
3 & 4 1962 |
1 100MW 2 125MW | 614 | Large
corporation |
Dominion | 1978 (unit 1)
1979 (unit 2) 2012 (units 3 & 4) |
| Tanner's | Lawrenceburg | 1 1951 2 1952
3 1954 4 1964 |
1 & 2: 153 MW
3 215 MW 4 580 MW |
1,100 | Large
corporation |
Indiana - Michigan Power | 2015[18] |
| Notre Dame | University of | 1 1952 2 1956 3 1962
4 1967 5 2000 |
1 1.7 MW 2 2.0 MW 3 3.0 MW
4 5.0 MW 5 9.5 MW |
21.1 | College
utility |
University of Notre Dame | 2019[19] |
| Wabash | Terre Haute | 2-4 1955 5 1956
6 1968 7 1995 |
2-4 85 MW 5 95 MW
6 318 MW |
680 | Large
corporation |
Duke Energy Indiana | 2016[20] |
| Wade | Purdue | 1 1969
2 1995 |
1 10.6 MW
2 30.8 MW |
41.4 | College
utility |
Purdue University | 2012 (Unit 1)
Converted to natural gas in 2012 (Unit 2)[21] |
- 1 Also includes cooling towers.
- 0 active units indicates decommissioned stations.
Coal gasification
| Name | Location | Act. units |
Stacks | In service dates |
Unit capacity (2009) |
Nameplate capacity |
Owner type | Owner(s) (2009) |
|---|---|---|---|---|---|---|---|---|
| Wabash River IGCC |
Terre Haute | 2 | 1 | 1 - 1995 2 - 1955 (repowered) |
1 192 MW 2 68 MW (steam) |
260 MW | Corporation | Wabash Valley Power Authority |
| Edwardsport IGCC |
Edwardsport | 3 | 2 | 2012 | 1 & 2 260 MW 3 260 MW |
780 MW | Joint owned | Duke Energy Indiana Vectren |
1 The existing plant will be decommissioned and demolished upon completion of new IGCC facility.
Oil-fired peaking stations
Natural gas fired
| Name | Location | Type | In service dates |
Unit capacity (2014) |
Nameplate capacity |
Owner type | Owner(s) (2014) | Source(s) |
|---|---|---|---|---|---|---|---|---|
| Anderson Generating Station | Anderson | Peaking | 1 & 2 - 1992 3 - 2004 |
1 & 2 41 MW 3 85 MW |
167 MW | Municipal holding company | Indiana Municipal Power Agency | [22] |
| Broadway Generating Station (Indiana) | Evansville | Peaking | 1 - 1971 2 - 1981 |
1 50 MW 2 65 MW |
115 MW | Large corporation | Vectren | [23] |
| Eagle Valley | Martinsville | 2018 | 671 MW | Large corporation |
AES / AES Indiana | [13] | ||
| Georgetown Generating Station | ||||||||
| Henry County Generating Station | Henry County | Peaking | 2001 | 84 MW | Large corporation | Duke Energy | [24] | |
| Lawrence County Generating Station | Lawrence County | Peaking | 2005 | 258 MW | Rural electric cooperative | Hoosier Energy, Wabash Valley Power Association | [25] | |
| Lawrenceburg Energy Facility | ||||||||
| Montpelier Electric Generating Station (Indiana) | ||||||||
| Noblesville Station | Noblesville, Indiana | Combined cycle | 1950 | 310 MW | Large corporation | Duke Energy | [26] | |
| Northeast Generating Station (Indiana) | ||||||||
| Perry K. | Downtown Indianapolis |
1 1925 (coal) 2 1938 (coal) 1 2016 (natural gas) 2 2016 (natural gas) |
1 15.0 MW 2 5.0 MW |
20.0 | Small corporation |
Citizens Energy Group | [27] | |
| Portside Energy Facility | ||||||||
| Richmond Generating Station (Indiana) | ||||||||
| St. Joseph Energy Center | St. Joseph County | Combined cycle | 2018 | 720 MW | Rural electric cooperatives | Hoosier Energy, Wabash Valley Power Alliance | [28] | |
| Vermillion Generating Facility | Vermillion County | Peaking | 2000 | 692 MW | Large corporation, rural electric cooperative | Duke Energy Indiana, Wabash Valley Power Alliance | [29][30] | |
| Wheatland Generating Facility | Knox County | Peaking | 2000 | 512 MW | Large corporation | Duke Energy | [31] | |
| Whiting Clean Energy Power Plant | ||||||||
| Worthington Generating Station | Greene County | Peaking | 2000[32] | 174 MW | Rural electric cooperative | Hoosier Energy | [25] |
Hydroelectric dams
| Name | Location | Coordinates | In service date |
Nameplate capacity |
Owner type | Owner(s) | Operator(s) |
|---|---|---|---|---|---|---|---|
| Markland Locks and Dam | Gallatin County, Kentucky / York Township, Switzerland County, Indiana | 38°46′29″N, 84°57′51″W | 1964 | 72.9 MW | Corporation | Duke Energy Indiana | United States Army Corps of Engineers Louisville District |
| Norway Dam (Indiana)[33] | Monticello, Indiana | 40°46'50"N, 86°45'36"W | 1923 | 9.2 MW | Corporation | Northern Indiana Public Service Company (NIPSCO) | |
| Oakdale Dam (Indiana)[33] | Monticello, Indiana | 40°39'23.75"N, 86°45'11.30"W | 1925 | 7.2 MW | Corporation | Northern Indiana Public Service Company (NIPSCO) | |
| Twin Branch Dam (Indiana)[34] | Mishawaka, Indiana | 41°39'56"N, 86°7'57"W | 1989 | 4.8 MW | Corporation | Indiana Michigan Power | |
| Elkhart Dam (Indiana)[35][36] | Elkhart County, Indiana | 41°41'34.90"N, 85°57'54.65"W | 1913 | 3.4 MW | Corporation | Indiana Michigan Power |
Wind farms
Solar
Script error: No such module "Labelled list hatnote".
| Name | Location | In service dates |
Nameplate capacity |
Owner(s) |
|---|---|---|---|---|
| Bellflower Solar Project[37] | Henry County | 2023 | 152.5 MW | Lightsource bp |
| Cavalry[38] | White County | 2024 | 200 MW | NIPSCO |
| Dunns Bridge 1[39] | Jasper County | 2023 | 265 MW | NIPSCO |
| Hardy Hills[3][40] | Clinton County | 2024 | 195 MW | AES |
| Honeysuckle[41][42] | New Carlisle | 2024 | 188 MWdc | Lightsource bp |
| Indiana Crossroads[39] | White County | 2023 | 200 MW | NIPSCO |
| Mammoth North[43][44][45] | Starke County | 2024 | 400 MWdc | Doral Renewables |
| Mammoth South[43][44][46] | Pulaski County | 2026 (under construction) |
300 MWdc | Doral Renewables |
| Riverstart Solar Park | Modoc | 2021 | 200 MW[47] | Connor Clark & Lunn Infrastructure (80%) EDP Renewables North America (20%)[48] |
Biomass to energy plant
Attempted nuclear plants
Operating electrical utility companies
- Duke Energy Indiana (formerly Public Service Indiana (PSI))
- Hoosier Energy
- Indiana-Michigan Power
- AES Indiana, a subsidiary of AES Corporation
- Northern Indiana Public Service Company (NIPSCO) (a subsidiary of NiSource)
- Vectren (formerly Southern Indiana Gas & Electric Company (SIGECO))
References
<templatestyles src="Reflist/styles.css" />
- ↑ Script error: No such module "citation/CS1".
- ↑ Cite error: Script error: No such module "Namespace detect".Script error: No such module "Namespace detect".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "Citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
Script error: No such module "Check for unknown parameters".
External links
Script error: No such module "Portal".
Script error: No such module "Navbox". Template:Power stations in the United States