Lempster Mountain Wind Power Project

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description

File:Lempster Wind Farm-3.jpg
Lempster Wind Farm

Script error: No such module "Coordinates". Lempster Mountain Wind Power Project is a 24-megawatt wind farm, opened in 2008 in Lempster, New Hampshire in the northeast United States. Owned by Iberdrola, it is the first major wind-power installation in the state of New Hampshire.[1]

Located 5 miles from Mount Sunapee, it has 12 wind turbines stretching over several connected ridgelines.

References

External links

<templatestyles src="Stack/styles.css"/>

Script error: No such module "Portal".

Script error: No such module "Check for unknown parameters".