Lealt Valley Diatomite Railway
Template:Short description Script error: No such module "Unsubst". Template:Use British English Script error: No such module "Infobox".Script error: No such module "Check for unknown parameters".Script error: No such module "Check for clobbered parameters". Template:Routemap The Lealt Valley Diatomite Railway was a Template:RailGauge narrow gauge tramway on the Isle of Skye, Scotland, which ran parallel with the River Lealt.
Work was underway to lay the tramway in March 1889.[1] At the opening, the line was worked by gravity – the line being on a falling gradient – and manpower. Later, the line began the use of a steam locomotive.
The western end of the line was at Loch Cuithir, where diatomite - known locally as Cailc (Scottish Gaelic for chalk) - was taken out from the lochbed and dried on wire nets. The seaward terminus had warehouses on the cliff-top at Invertote. At the base of the cliff was a factory where the diatomite was kiln dried, ground and calcined. The line was extended from the factory onto a pier into the Sound of Raasay. Diatomite was also gotten from Loch Valerain and transported by aerial ropeway to Staffin Bay. During its existence, the Skye Diatomite Company extracted 2000 tons of diatomite.
From Invertote, the diatomite was transferred by skiff, onto puffer boats, waiting in the bay, and shipped across to the mainland. The diatomite was turned into kieselguhr which was mixed with nitroglycerine by Nobel Industries, at Ardeer, to make dynamite.[2]
References
<templatestyles src="Reflist/styles.css" />
Script error: No such module "Check for unknown parameters".
- Pages with script errors
- Pre-grouping British railway companies
- Closed railway lines in Scotland
- Railways on Scottish Islands
- 2 ft gauge railways in Scotland
- Isle of Skye
- Railway lines opened in 1890
- Transport in Highland (council area)
- 1890 establishments in Scotland
- 1915 disestablishments in Scotland
- British companies established in 1890
- British companies disestablished in 1915