Template:Short description Template:Use dmy dates Script error: No such module "Type in location".Script error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters".Expression error: Unexpected < operator. Kárahnjúkar Hydropower Plant (Template:Langx Script error: No such module "IPA".), officially called Fljótsdalur Power Station[1] (Template:Langx Script error: No such module "IPA".)[2] is a hydroelectric power plant in Fljótsdalshérað municipality in eastern Iceland, designed to produce Script error: No such module "convert". annually for Alcoa's Fjarðaál aluminum smelter Script error: No such module "convert". to the east in Reyðarfjörður. With the installed capacity of Script error: No such module "convert"., the plant is the largest power plant in Iceland. The project, named after the nearby Kárahnjúkar mountains, involves damming the rivers Jökulsá á Dal and Jökulsá í Fljótsdal with five dams, creating three reservoirs. Water from the reservoirs is diverted through Script error: No such module "convert". of underground water tunnels and down a Script error: No such module "convert". vertical penstock towards a single underground power station. The smelter became fully operational in 2008 and the hydropower project was completed in 2009.[3]

The Kárahnjúkar Dam[1] (Template:Langx Script error: No such module "IPA".)[2] is the centrepiece of the five dams and the largest of its type in Europe, standing Script error: No such module "convert". tall with a length of Script error: No such module "convert". and comprising Script error: No such module "convert". of material.

The project has been heavily criticised for its environmental impact and its use of foreign workers.Script error: No such module "Unsubst".

Description

The hydroelectricity project harnesses the rivers Jökulsá á Dal and Jökulsá í Fljótsdal by creating three reservoirs with five concrete-face rock-filled embankment dams; three on the Jökulsá á Dal and two on the Jökulsá í Fljótsdal. After being used in the Fljótsdalur Power Station, all water used in electricity production is discharged into the river Jökulsá í Fljótsdal.

File:Kárahnjúkur 05.jpg
Kárahnjúkar Dam

Three dams on the Jökulsá á Dal—the Kárahnjúkar Dam (Template:Langx), the Desjará Dam[1] (Template:Langx),[2] and the Sauðárdalur Dam[1] (Template:Langx)[2]—create the Hálslón Reservoir. At Script error: No such module "convert". tall and Script error: No such module "convert". long, the Kárahnjúkar Dam is the largest dam in the project and the largest of its type in Europe as well. The Script error: No such module "convert"., Script error: No such module "convert". Desjará Dam and the Script error: No such module "convert"., Script error: No such module "convert". Sauðárdalur Dam are saddle or auxiliary dams that maintain the desired height of the Hálslón Reservoir. Water from the Script error: No such module "convert"., Script error: No such module "convert". Hálslón Reservoir (about the size of Manhattan island in New York) is diverted down a Script error: No such module "convert"., Script error: No such module "convert". headrace tunnel towards the Fljótsdalur Power Station.[4][5]

On the river Jökulsá í Fljótsdal, the Script error: No such module "convert"., Script error: No such module "convert". Kelduá Dam forms the Script error: No such module "convert". Kelduárlón Reservoir. Downstream from the Kelduá Dam is the Script error: No such module "convert"., Script error: No such module "convert". Ufsarstífla dam which forms the Ufsarlón, a much smaller reservoir. Water from the Ufsarlón Reservoir is diverted down a Script error: No such module "convert"., Script error: No such module "convert". headrace tunnel where it joins the Hálslón Reservoir headrace tunnel.[4][5]

Before each of the headrace tunnels from the Hálslón Reservoir or Ufsarlón Reservoir reach the underground power station, they both join to form a single combined headrace tunnel. The single headrace tunnel later splits into two Script error: No such module "convert"., Script error: No such module "convert". steel-lined penstocks (tunnels) and the water makes a rapid descent down a final Script error: No such module "convert". vertical penstock into the power station. The underground Fljótsdalur Power Station contains six vertical-axis Francis turbine generators rated at 115 MW each. The power station has a combined capacity of 690 MW and discharge of Script error: No such module "convert". (averages Script error: No such module "convert".) into the river Jökulsá í Fljótsdal via tailrace tunnels and canals. The power production of 4,600 GWh/year[4] corresponds to a capacity factor of 76%, which is relatively high for a hydroelectric facility. Power produced is then transmitted to Alcoa's Fjarðaál aluminium smelter Script error: No such module "convert". to the east in Reyðarfjörður.[4][5]

Fjarðaál aluminium smelter

Script error: No such module "Labelled list hatnote". The Fjarðaál aluminium smelter was completed June 2007 and reached full operation in April 2008. Construction began in 2004 and the facility contains a smelter, cast house, rod production, and deep-water port. The smelter employs 450 people and produces 940 tons of aluminium a day, with capacity of 346,000 metric tons of aluminium per year. Fjarðaál means "Fjords Aluminium" in Icelandic.[5][6]

History

Using the rivers Jökulsá á Dal and Jökulsá í Fljótsdal along with other resources in eastern Iceland has been on the drawing board since the 1970s. From 1975 to 2002, several international companies had planned or attempted to build a metal plant at Reyðarfjörður that would be powered by a hydroelectricity project similar to the Kárahnjúkar. All failed because of opposition to the project until Alcoa along with the Government of Iceland and Landsvirkjun, Iceland's national power company committed to the massive project in 2002.[7]

Construction

File:KH2006-09-09-013-KHdam-north.JPG
Construction of Kárahnjúkar Dam, concrete-face backside
File:End of tunnel at Skriðuklaustur.jpg
The end of the tunnel at Skriðuklaustur leading water from Kárahnjúkar Dam to the power plant.

The project is funded by Landsvirkjun, which operates the dams and Fljótsdalur Power Station. The Italian company Impregilo is the largest contractor working on the dams.[8] The total cost of the hydropower project is US$1.3 billion. The penstock was built in place by the German company DSD-NOELL (Würzburg) whereas ATB Riva Calzoni of Italy provided intake structures, wheels gates, and sliding gates. In total, more than 4,000 tons of steel were used for the steel liner.

Preparatory work on the project began in August 2002 and construction on the Kárahnjúkar Dam and headrace tunnels for the Hálslón Reservoir began in April 2003. In September of the same year, construction began on the underground power station. Construction on both the Desjará Dam and the Sauðárdalur Dam began in April 2004. In June 2006, construction of the Kelduá Dam and Ufsarstífla Dam began and in September, the Hálslón Reservoir began to fill. In mid-2008, the Kelduá and Ufsarstífla Dams were complete and the Ufsarlón Reservoir headrace tunnel was ready.[5][9]

Construction on the headrace tunnels was done by three full-face tunnel boring machines, while remaining areas were drilled and blasted.[5] This was the first time that tunnel boring machines were used in Iceland.[10]

There were several workplace fatalities during the construction process, including Arni Thor Bjarnason, Eilifur Gopi Hammond, Ludvik Alfred Halldorsson, and Kresimir Durinic.[11]

Criticism

The dams have been the frequent subject of protests by environmentalists for many reasons.[12] The area is within the second largest (formerly) unspoiled wilderness in Europe and covers about Script error: No such module "convert". in total and the rivers that supply water to the project are part of Europe's largest glacier, Vatnajökull. About 70% of the workforce was composed of foreign workers.[13] For the construction of Kárahnjúkar Hydropower Plant in East Iceland, five dams in two glacial rivers created three reservoirs, that together flooded over 440,000 acres of unspoilt Highland territory. The megastructure is on a scale like nothing the nation has seen before or since and, as such, has been a constant source of protest and controversy due to the landscapes irretrievably lost.[14] The total affected area according to the environmental impact assessment, outlines that a total of Script error: No such module "convert". were affected by the project's construction. That is approximately 3% of Iceland's total landmass.[15]

Representation in film and literature

The project as a whole was criticised heavily in the 2006 book Draumalandið[16] and subsequent 2009 documentary Dreamland.[17] The project was documented in a MegaStructures program of the National Geographic Channel, and the Discovery Channel's Extreme Engineering, along with mention in the 2006 Sigur Rós rockumentary Heima (At Home), where the band played at a protest against the building of the dam.[18] The dam has been read as an inspiration for a mysterious dam in Steinar Bragi's horror novel Hálendið.[19]

See also

Script error: No such module "Portal".

References

<templatestyles src="Reflist/styles.css" />

  1. a b c d Script error: No such module "citation/CS1".
  2. a b c d Script error: No such module "citation/CS1".
  3. Kárahnjúkar HEP – Landsvirkjun – September 2009 Template:Webarchive
  4. a b c d Key Figures of the Kárahnjúkar Hydroelectric Project Template:Webarchive
  5. a b c d e f The Kárahnjúkar Hydropower Project Overview Template:Webarchive
  6. Script error: No such module "citation/CS1".
  7. Large-scale industry in East Iceland Template:Webarchive
  8. The Icelandic contractor Suðurverk hf was the main contractor working on Desjará Dam and Sauðárdalur Dam Karahnjúkar website – Impregilo Template:Webarchive
  9. Kárahnjúkar Construction Schedule Template:Webarchive
  10. Script error: No such module "citation/CS1".
  11. Veal, Lowana (2007) ICELAND: Dam Proves Fatal for Workers, IPS http://www.ipsnews.net/2007/01/iceland-dam-proves-fatal-for-workers/ Template:Webarchive
  12. "Iceland be Damned", Radio Netherlands Archives, February 8, 2003
  13. Script error: No such module "citation/CS1".
  14. Script error: No such module "citation/CS1".
  15. Script error: No such module "citation/CS1".
  16. Andri Snær Magnason, Dreamland: A Self-Help Manual for a Frightened Nation. Translated by Nicholas Jones. London: Citizen Press, 2008. Originally published as Draumalandið: Sjálfshjálparbók handa hræddri þjóð. Reykjavík: Mál og menning, 2006.
  17. Þorfinnur Guðnason and Andri Snær Magnason, dir., Draumalandið [Dreamland], Ground Control Productions, 2009.
  18. Nicola Dibben, 'Music and Environmentalism in Iceland', in: Holt, F. and Kärjä, A-V. (eds.), The Oxford Handbook of Popular Music in the Nordic Countries. Oxford: Oxford University Press, 2017: 163-84 (pp. 167-69); ISBN 9780190603908.
  19. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

Script error: No such module "Side box".

Template:Country topics Template:Authority control