Interstate 295 (North Carolina)

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Template:Use mdy dates Template:Use American English Script error: No such module "Infobox".Template:Template otherScript error: No such module "Infobox road/errors".Script error: No such module "Check for unknown parameters".[[Category:Infobox road instances Template:Infobox road/meta/mask/category]] Interstate 295 (I-295), also known as the Fayetteville Outer Loop, is an Interstate-grade Script error: No such module "convert". bypass around the western side of Fayetteville, North Carolina, United States. It stretches from I-95 near Parkton to I-95 and US 13 near Eastover.

Route description

File:FOL bridge structures south of Raeford Road - 50219293516.jpg
Construction of I-295 south of Raeford Road, 2020

I-295 begins at a trumpet interchange at I-95 in Robeson County between Parkton and Hope Mills. The highway heads northwest, having a dumbbell interchange at Parkton Road (exit 2) before crossing into Cumberland County. Passing over the CSX Railway's South End Subdivision and Brisson Road on a bridge, the highway then curves to the north, having another dumbbell interchange at Black Bridge Road (exit 4). The highway briefly continues north before curving west around Upchurches Pond before having a diamond interchange with Camden Road (exit 7). The highway curves north again, having a diamond interchange with Strickland Bridge Road (exit 11), crossing over the Aberdeen and Rockfish Railroad, having a single-point urban interchange with US 401 at Raeford Road (exit 12), and having a partial cloverleaf interchange with Cliffdale Road (exit 15) before turning northeast and having a partial cloverleaf interchange with Canopy Lane (exit 18). The highway then runs along the southeastern boundary of Fort Bragg, having a partial cloverleaf interchange with the All-American Freeway (exit 21A-B), Bragg Boulevard (exit 21C), and Murchison Road (exit 23). The Script error: No such module "convert". between Bragg Boulevard and Murchison Road is concurrent with NC 24 and NC 87. Heading further northeast, the highway briefly turns north and has a partial cloverleaf interchange with McArthur Road (exit 25) before turning east. Continuing east, the highway has another single point interchange with US 401 at Ramsey Street (exit 28), crossing the Norfolk Southern Railway's VF-Line, crossing the Cape Fear River, having a partial cloverleaf interchange with River Road (exit 30), and crossing the CSX Railway's South End Subdivision again, before ending at an interchange with I-95/US 13 (exit 34) near Eastover. The entire Script error: No such module "convert". route is a divided four-lane highway with a maximum speed limit of Script error: No such module "convert".. Exit numbers along the route match NC 295 milemarkers added in 2014 when previous signage designating the route Future I-295 were removed and replaced with NC 295 signs, both along the loop itself and at the loop's interchange with I-95.[1]

Dedicated and memorial names

I-295 has two dedicated stretches of freeway.

  • The Airborne and Special Operations Highway: Official North Carolina name of I-295 from I-95 to Raeford Road. Approved in July 2014 and dedicated on August 16, 2014, at the Airborne & Special Operations Museum.[2]
  • Lyndo Tippett Highway: Official North Carolina name of I-295 from I-95 to Ramsey Street. Approved May 2019 and dedicated on October 10, 2019.[3]

History

The future designation of the Fayetteville Outer Loop as I-295 was approved by the American Association of State Highway and Transportation Officials (AASHTO) in May 2005 following an earlier approval by the Federal Highway Administration (FHWA). Signs designation "Future I-295" were put up along the route when the section between I-95 and River Road was opened in July 2005. The first short section of this highway had opened earlier in June 2003, and it extended only from River Road to US 401. Then, the only mentions of a highway number were on street signs at the entrance ramps that said I-295 (with an additional "FUTURE" on some). In May 2019, the FHWA officially added the then open Script error: No such module "convert". of NC 295 to the Interstate Highway System, this follows up on approval by AASHTO late 2018.[4] The North Carolina Department of Transportation (NCDOT) may have received a waiver since two parts of it (namely the bridge that crosses the Cape Fear River and its interchange with I-95) are not quite up to Interstate Highway standards.[5]

File:NC295-2013map.jpg
NC 295 appears in the 2013–2014 State Transportation Map

Construction on the next section of I-295, located from US 401 to the All American Freeway, was scheduled to start in the later months of 2008, and then probably completed by early 2012, but this construction project was put on hold in November 2008 due to the severe shortage of money for highway construction in North Carolina at that time and extending though 2011.[6] Instead of constructing this segment as one contract, work was split up into three smaller segments. Work first started in 2009 on the section from Bragg Boulevard (NC 24) to Murchison Road (NC 210) using federal stimulus monies. This was completed in 2014. In March 2011, a contract to construct the portion of the loop between US 401 and Murchison Road was awarded to a construction company; however, this did not include final paving. The contract for paving was issued in 2014 and is scheduled to be completed during mid-2016,Script error: No such module "Unsubst".Script error: No such module "Check for unknown parameters". delayed from April 2014.[7]

On August 4, 2014, a Script error: No such module "convert". new section of the Fayetteville Outer Loop opened between Murchison Road and Bragg Boulevard. Considered critical in relieving congestion around Fort Bragg, this section traverses eastbound along collector–distributor lanes between the two exits, while westbound uses an actual stretch of the freeway. Signage along this stretch reflected a rerouting of NC 24/NC 87. On August 11, 2016, a Script error: No such module "convert". new section opened between Murchison Road and Ramsey Street, connecting the two existing segments of the Fayetteville Outer Loop together.[8][9] Another segment continuing the Loop to All American Freeway was opened on December 2, 2016.[2][10][11]

The remainder of the route from All American Freeway south to I-95 near Parkton is to be completed in segments, with construction starting between 2018 and 2020 with the loop not scheduled to be totally complete until around 2025.[1]Script error: No such module "Unsubst".Script error: No such module "Check for unknown parameters". Governor Pat McCrory announced in December 2015 that the remaining segments would now be funded under changes to the state's method of apportioning transportation funds. These changes were approved by the NCDOT Board in January 2016.[1] On November 25, 2019, a Script error: No such module "convert". segment opened between the All American Freeway and Cliffdale Road.[12] On August 19, 2020, a Script error: No such module "convert". segment between Cliffdale Road and US 401 (Raeford Road) was opened to traffic.[13] On November 21, 2022, a Script error: No such module "convert". orphaned segment between Parkton Road and Black Bridge Road signed as NC 295 opened to traffic.[14] The final contract, which covered the route between US 401 and Camden Road, was awarded to Civil Branch in the summer of 2022. Construction of this segment has begun with NCDOT setting the completion date to May 15, 2026. Once this segment opens, I-295 would be completed in its entirety.[15] The first part of this section, between Black Bridge Road and Camden Road, as well as between Parkton Road and I-95 South, opened to traffic on July 10, 2024.[16] On November 25, 2025, the final Script error: No such module "convert". segment between Camden Road and Raeford Road opened to traffic, thus completing the Fayetteville Outer Loop in its entirety.[17]

Route number changes

Template:Infobox road small The Fayetteville Outer Loop has had a variety of actual and proposed highway designations over the years. Its first proposed Interstate designation, rejected by AASHTO in 2003, was I-195. Other earlier designations have included extensions of US 13 (in some newspaper articles) or as NC 24. It was signed as Future I-295 from 2005 to 2014, which also appeared on state maps from 2006 to 2012.

On July 23, 2011, NCDOT designated the Fayetteville Outer Loop as NC 295. The circumstances for the rule change cited was necessary for public safety and welfare. This marks its official establishment, six years after the first section of the new freeway was completed.[18][19] On January 15, 2019, the FHWA approved the I-295 designation between All American Freeway and I-95/US 13 after NCDOT completed two design changes that were acceptable. Effective that same day, NC 295 was decommissioned in favor of I-295.[20]

Template:Infobox road small On April 21, 2020, NC 295 was reestablished in an encore designation between Cliffdale Road (Secondary Road 1400 [SR 1400]) and All American Expressway (SR 1007). The reason for its reintroduction is that Interstate designations must end at a National Highway System route.[21] Lasting only a few months, it officially changed over to I-295 on August 17, 2020, upon connection to US 401 (Raeford Road).[22]

Template:Infobox road small The Script error: No such module "convert". orphaned segment of highway opened on November 21, 2022. It was signed as NC 295 per signage at the Parkton Road interchange.[23] On July 10, 2024, a section between Parkton Road and I-95 South was opened to traffic. This included a section from Camden Road to Black Bridge Road, bringing the total length to Script error: No such module "convert"..[16]

Exit list

Template:Jcttop/core Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Script error: No such module "Jctbtm".


See also

References

<templatestyles src="Reflist/styles.css" />

  1. a b c Script error: No such module "citation/CS1".Template:Sps
  2. a b Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".Script error: No such module "Unsubst".Template:Sps
  6. Script error: No such module "citation/CS1".
  7. Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".
  9. Script error: No such module "citation/CS1".
  10. Script error: No such module "citation/CS1".
  11. Script error: No such module "citation/CS1".
  12. Script error: No such module "citation/CS1".
  13. Script error: No such module "citation/CS1".
  14. Script error: No such module "citation/CS1".
  15. Script error: No such module "citation/CS1".
  16. a b Script error: No such module "citation/CS1".
  17. Script error: No such module "citation/CS1".
  18. Script error: No such module "citation/CS1".
  19. Script error: No such module "citation/CS1".
  20. Script error: No such module "citation/CS1".
  21. Script error: No such module "citation/CS1".
  22. Script error: No such module "citation/CS1".
  23. Template:Google maps

Script error: No such module "Check for unknown parameters".

External links

Template:Attached KML

Template:3di