The Harapaki Wind Farm is a wind farm project in the Hawke's Bay region of New Zealand. Construction began in June 2021[1][2] and was completed in 2024.[3] As of 2024 it is the second-biggest wind farm in New Zealand.[3]

History

In 2006, Hawke's Bay Wind Farm Ltd was granted resource consent for a 75 turbine, 225 MW wind farm at Titiokura.[4] The same year Unison Networks was granted consent for a 15 turbine, 45 MW development. Both consents were upheld by the Environment Court in October 2006.[5] A proposed expansion of Unison's project[6] was rejected by the Environment Court in 2009.[7][8]

In 2010 Hawke's Bay Wind Farm Ltd was purchased by Meridian Energy.[9] Unison's consent was purchased in 2011, and the sites combined.[10]

In August 2019 Meridian sought interest from potential contractors for the wind farm's construction.[10] Construction was expected to begin in 2020, but was delayed due to the possible closure of the Tiwai Point aluminium smelter.[11] In February 2021 Meridian announced that construction would begin later that year, and would take approximately three years.[12][13] Site preparation began in mid-2021.[14] The first turbines arrived in Napier in March 2023[15] and transportation of components to the wind farm site began in July 2023 when State Highway 5 had been sufficiently repaired following the damage caused by Cyclone Gabrielle.[16]

The wind farm began generating in November 2023[17][18] and reached full capacity in July 2024.[3]

Location

The wind farm is built on the Maungaharuru Range, near the Titiokura Summit, about 34 km northwest of Napier Airport.[4] The altitude of the range is approximately 1300 metres.

Operation

The wind farm uses 41 Siemens Gamesa 4.3 MW turbines, measuring Script error: No such module "convert". from base to hub with a rotor diameter of Script error: No such module "convert".. Electricity is supplied to the national grid via a new substation on Transpower's Redclyffe-Whirinaki-Wairakei 220 kV transmission line.[19]

See also

References

<templatestyles src="Reflist/styles.css" />

  1. Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".
  3. a b c Script error: No such module "citation/CS1".
  4. a b Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".
  9. Script error: No such module "citation/CS1".
  10. a b Script error: No such module "citation/CS1".
  11. Script error: No such module "citation/CS1".
  12. Script error: No such module "citation/CS1".
  13. Script error: No such module "citation/CS1".
  14. Script error: No such module "citation/CS1".
  15. Script error: No such module "citation/CS1".
  16. Script error: No such module "citation/CS1".
  17. Script error: No such module "citation/CS1".
  18. Script error: No such module "citation/CS1".
  19. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

  • Script error: No such module "Official website".Script error: No such module "Check for unknown parameters".
  • Harapaki Wind Farm at New Zealand Wind Energy Association website

Template:Portal bar