Haibang station

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Script error: No such module "Infobox".Script error: No such module "Parameter validation".Script error: No such module "Check for unknown parameters".Script error: No such module "check for deprecated parameters".

Haibang Station (Template:Zh) is an interchange station between Line 3 and Line 4 of the Guangzhou Metro, and also the southeastern terminus of Line 3.[1] The Line 4 station started operations on 30 December 2006 and is located at the junction of Changnan Road.[2] and the Jingzhu Expressway in Shiqi Town (Script error: No such module "Lang".), Panyu District.[3] The Line 3 station started operations on 1 November 2024.[4]

Station theme

It is the theme station of the east extension of Line 3, with the design theme of "Chasing the Water Facing the Sea". The ceiling of the station adopts a gradient color wave shape, and the wall is decorated with watercolor wave patterns to show the local characteristics of the Shatian Water Town style.[5]

Station layout

F2
Platforms
Side platform, doors will open on the right
Platform Template:GZM platform Template:Arrow2 Template:Rint towards Nansha Passenger Port (Dichong)
Platform Template:GZM platform Template:Rint towards Huangcun (Shiqi) Template:Arrow2
Side platform, doors will open on the right
G
Concourse
Line 4 Lobby Customer Service, Shops, Vending machines, ATMs, Exits, Toilet
B1
Concourse
Line 3 Lobby Ticket Machines, Customer Service, Shops, Safety Facilities, Transfer passageways between Lobbies
B2
Platforms
Platform Template:GZM platform Template:Arrow2 Template:Rint termination platform
Island platform, doors will open on the left
Platform Template:GZM platform Template:Rint towards Template:Stl or Template:Stl (Template:Stl)Script error: No such module "Check for unknown parameters". Template:Arrow2

Exits

Exit letter Gallery Exit location Nearby destinations
A File:Exit A, Haibang Station, Guangzhou Metro 20241102.jpg Kangti Road The Second Affiliated Hospital of Guangzhou Medical University
B File:Exit B, Haibang Station, Guangzhou Metro 20241102.jpg Kangti Road Asian Games Town
C File:Exit C, Haibang Station, Guangzhou Metro 20241102.jpg Kangti Road Haibangcun
E File:Exit E, Haibang Station, Guangzhou Metro 20241102.jpg Kangti Road
F File:Exit F, Haibang Station, Guangzhou Metro 20241102.jpg Kangti Road Haibang Metro Station Bus Stop (Northbound), Haibang Metro Station Coach Terminal
G File:Exit G, Haibang Station, Guangzhou Metro 20241102.jpg Kangti Road Haibang Metro Station Bus Stop (Southbound)

Gallery

History

The project of the eastern extension of Line 3 was approved by the National Development and Reform Commission in late March 2017, and the construction report was approved in early January 2018,[6] followed by the construction of the station part of Line 3 in mid-2019.[7] On 1 July 2023, the tunnel boring machine broke through, and on October 27, the main structure was topped out.[8] The "three powers" transfer was completed on 31 May 2024.[9] On 1 November 2024, the eastern extension of Line 3 was put into operation, along with the station.[10]

Line 3 opening complications

The natural gas pipelines that affected the opening of Template:Stn Station and Guangzhou Metro Line 22 earlier once brought uncertainty to the partial opening of Line 3 of this station.[11] In 2022, the authorities issued a notice stating that the expansion of Haibang station would have affected the operation of the existing three pipelines, namely Guangzhou Gas, Dapeng Gas and Sinopec Pipeline, and they would need to be relocated.[12][13] The Dapeng Gas Pipeline and Sinopec Oil Pipeline started construction and relocation in December 2023 and March 2024, respectively, and are scheduled to be completed in March 2025.[14] The Guangzhou Gas Pipeline will be relocated and renovated by the Guangzhou Metro Group itself, and the relocation began as of October 2024.[15]

Although the station had already been handed over to the subway operation department for commissioning, the latter was even ready to open the station at the end of September 2024, but this did not happen.[16] The authorities have responded that the station of Line 3 can only be opened after the construction of the pipeline is completed and the pipeline is accepted.[17] However, it was not until October 30 that the Guangzhou Metro Group announced that the eastern extension of Line 3, including this station, would open on November 1 of the same year.[4]

References

<templatestyles src="Reflist/styles.css" />

  1. ↑ 20-meter-high elevated section of Metro Line 4 to open by year's-end
  2. ↑ Template:Zh
  3. ↑ Haibang
  4. ↑ a b Script error: No such module "citation/CS1".
  5. ↑ Script error: No such module "citation/CS1".
  6. ↑ Script error: No such module "citation/CS1".
  7. ↑ Script error: No such module "citation/CS1".
  8. ↑ Script error: No such module "citation/CS1".
  9. ↑ Script error: No such module "citation/CS1".
  10. ↑ Script error: No such module "citation/CS1".
  11. ↑ Script error: No such module "citation/CS1".
  12. ↑ Script error: No such module "citation/CS1".
  13. ↑ Script error: No such module "citation/CS1".
  14. ↑ Script error: No such module "citation/CS1".
  15. ↑ Script error: No such module "citation/CS1".
  16. ↑ Script error: No such module "citation/CS1".
  17. ↑ Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

Script error: No such module "Navbox".

Script error: No such module "Coordinates".